VDOT contract C0000115201C01B bid tabulation

Sidewalk construction. Let by Virginia DOT on October 28, 2026, Henrico, Richmond. 4 bids received; low bid $638,317 by FLB Contractors, Inc..

Owner
Virginia DOT
Letting
28 OCT 2026
Pay items
70
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1FLB Contractors, Inc.$638,317Low
2North Construction, Inc.$900,848+41%
3M & F Concrete, Inc.$911,645+43%
4Sagres Construction Corporation$1,160,000+82%
VDOT contract C0000115201C01B: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. FLB Contractors, Inc.2. North Construction, Inc.3. M & F Concrete, Inc.4. Sagres Construction Corporation
0001-0010Clearing and grubbing (301SD20-0001)LS1$10,210$25,000$35,776$162,000
0001-0020Regular excavation (303SD20-0001)CY413$50.00$140.00$416.00$91.61
0001-0030Embankment (303SD20-0010)CY156$35.00$63.13$416.00$105.08
0001-0040Siltation control excavation (303SD20-0029)CY179.70$10.00$110.00$1.04$93.10
0001-0050Inlet protection type B (303SD20-0031)EACH3$415.00$200.00$312.00$182.91
0001-0060Temp. silt fence type A (303SD20-0034)LF969$4.50$6.88$10.40$6.10
0001-0070Aggr. base matl. TY. I no. 21B (308SD20-0012)TON381$65.00$70.00$45.29$89.70
0001-0080Asphalt concrete TY. SM- 12.5D const (315SD20-0002)TON150$200.00$250.00$273.00$294.44
0001-0090Asphalt concrete TY. IM- 19.0D const (315SD20-0005)TON59$215.00$300.00$442.00$290.20
0001-0100Asphalt concrete BM-25.0 (315SD20-0010)TON60$210.00$250.00$429.00$283.49
0001-0110Saw-cut asphalt concrete saw-cut (315SD20-0104)LF403$4.50$5.00$10.40$4.71
0001-0120Curb, STD. CG-2 (502SD20-0011)LF401$35.00$62.00$31.20$110.00
0001-0130Comb. curb & gutter, STD. CG-6 (502SD20-0022)LF71$40.00$75.00$33.28$120.00
0001-0140Comb. curb & gutter, rad. CG-6 (502SD20-0023)LF229$45.00$75.00$33.28$120.00
0001-0150Entrance gutter CG-9D (502SD20-0029)SY54$135.00$225.00$140.40$225.00
0001-0160CG-12 detectable warning surface (504SD20-0002)SY11$385.00$500.00$561.60$625.00
0001-0170Hydr. cement conc. sidewalk 4" (504SD20-0003)SY581$125.00$165.00$79.56$125.00
0001-0180Demo. of pavement flexible (508SD20-0004)SY265$80.00$38.00$116.17$40.00
0001-0190Adjust exist. valve & box (510SD20-0038)EACH1$1,105.00$1,000.00$832.00$1,428.00
0001-0200Adjust exist frame & cover (510SD20-0050)EACH1$985.00$2,500.00$832.00$1,440.59
0001-0210NS reconstruct exist. structure top with A DI- precast top (510SX20-0035)EACH3$4,310.00$6,250.00$10,088$5,979.30
0001-0220NS adjust exist. sewer cleanout (510SX20-0046)EACH2$785.00$1,268.01$832.00$1,689.44
0001-0230NS adjust exist. small gas valve box (510SX20-0046)EACH7$875.00$850.00$832.00$1,059.59
0001-0240Type 3 barricade 8' (512SD20-0013)EACH20$225.00$437.50$468.00$216.89
0001-0250Temporary sign (512SD20-0014)SF1,072$25.00$1.00$36.40$37.85
0001-0260Truck mounted attenuator (512SD20-0023)HR608$5.00$75.00$31.20$78.83
0001-0270Group 2 channelizing devices (512SD20-0024)DAY12,360$0.10$2.03$2.08$1.94
0001-0280Port.changeable mess. sign (512SD20-0025)HR720$9.50$15.00$7.28$24.52
0001-0290Electronic arrow board (512SD20-0026)HR608$10.00$10.00$5.20$16.04
0001-0300Mobilization (513SD20-0001)LS1$185,700$100,000$43,501$85,250
0001-0310Flex. pave.tie-in planing above 2"-4" (515SD20-0003)SY94$60.00$68.75$169.00$142.86
0001-0320Flexible pave.planing 0"-2" (515SD20-0004)SY1,115$7.00$20.58$18.20$20.20
0001-0330Demolition of building wooden fence D-1 parcel 5 (516SD20-0002)LS1$3,000.00$3,750.00$2,496.00$10,000
0001-0340Demolition of building wooden fence D-2 parcel 6 (516SD20-0002)LS1$550.00$3,750.00$5,304.00$10,000
0001-0350Demolition of building wooden fence D-4 parcel 10 (516SD20-0002)LS1$4,100.00$4,500.00$6,552.00$10,000
0001-0360Demolition of building wooden fence D-5 parcel 11 (516SD20-0002)LS1$300.00$6,875.00$4,992.00$10,000
0001-0370Demolition of building wooden fence D-6 parcel 11 (516SD20-0002)LS1$1,210.00$5,312.50$1,809.60$10,000
0001-0380Demolition of building wooden fence D-7 parcel 5 (516SD20-0002)LS1$1,500.00$3,750.00$832.00$10,000
0001-0390Demolition of building wooden fence D-8 parcel 6 (516SD20-0002)LS1$1,000.00$3,750.00$832.00$10,000
0001-0400Clearing parcel light post D-902 parcel 5 (516SD20-0003)LS1$875.00$3,750.00$1,248.00$10,000
0001-0410Clearing parcel wooden fence sta. 107+07 - 109+62 remove and reset (516SD20-0003)LS1$7,810.00$27,000$26,910$10,000
0001-0420Clearing parcel wooden retaining wall D-900 parcel 5 (516SD20-0003)LS1$1,310.00$9,375.00$1,560.00$10,000
0001-0430Clearing parcel wooden retaining wall D-901 parcel 5 (516SD20-0003)LS1$1,310.00$9,375.00$1,560.00$10,000
0001-0440Clearing parcel wooden retaining wall D-903 parcel 4 (516SD20-0003)LS1$1,310.00$7,812.50$1,560.00$10,000
0001-0450Construction surveying constr. (517SD20-0001)LS1$47,800$50,000$7,150.00$69,377
0001-04601" water service line (520SD20-0003)LF136$57.00$180.00$312.00$250.00
0001-04701" water meter box & yoke (520SD20-0168)EACH2$3,000.00$3,500.00$2,600.00$4,088.49
0001-04806" sanitary service lateral connection (520SD20-0183)LF9$380.00$607.11$780.00$400.00
0001-0490Manhole frame & cover F & C-1 (520SD20-0274)EACH1$1,000.00$3,000.00$1,248.00$12,000
0001-05006" sewer cleanout (520SX20-0006)EACH1$850.00$3,935.73$832.00$5,000.00
0001-0510Topsoil class B (602SD20-0006)CY133$33.00$93.75$83.20$147.76
0001-0520Temporary seed (603SD20-0002)LB33$1.00$28.00$20.80$14.13
0001-0530Regular seed (603SD20-0003)LB89$1.50$28.00$20.80$11.78
0001-0540Overseeding (603SD20-0004)LB71$0.85$28.00$7.28$10.17
0001-0550Legume seed (603SD20-0005)LB6$7.00$28.00$7.28$23.56
0001-0560Legume overseeding (603SD20-0006)LB5$6.00$28.00$7.28$23.56
0001-0570Hydraulic erosion control product type 2 (603SD20-0008)SY1,997$0.25$7.00$6.24$4.06
0001-0580Hydraulic erosion control product type 3 (603SD20-0009)SY1,997$0.30$8.00$6.24$10.41
0001-0590Fertilizer nitrogen - N (603SD20-0014)LB33$1.00$21.41$20.80$4.71
0001-0600Fertilizer phosphorous - P (603SD20-0015)LB23$1.00$19.21$20.80$4.71
0001-0610Fertilizer potassium - K (603SD20-0016)LB23$1.00$15.44$20.80$4.71
0001-0620Lime (603SD20-0017)TON1.82$5.00$1,000.00$832.00$529.99
0001-0630Sign post STP-1, 2", 14 gauge (700SD20-0034)LF30$12.00$42.60$62.40$61.50
0001-0640Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037)LF30$10.00$52.00$62.40$61.50
0001-0650Conc. found. STP-1, TY. A (700SD20-0038)EACH6$300.00$10.00$832.00$1,001.10
0001-0660Sign panel (701SD20-0001)SF25$40.00$58.00$72.80$64.78
0001-0670Remove existing manhole/junction box (703SD20-0048)EACH2$500.00$2,000.00$1,040.00$2,355.53
0001-0680Type B class I PVMT line MRKG 4" (704SD20-0006)LF1,269$4.50$4.50$1.44$2.46
0001-0690Type B class II PVMT line MRKG 6" (704SD20-0012)LF357$5.00$6.50$5.20$4.58
0001-0700Type B class II PVMT line MRKG 24" (704SD20-0015)LF51$18.00$59.96$35.10$29.44
VDOT contract C0000115201C01B: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy