VDOT contract C000118872C501 bid tabulation
Smart scale - park & ride. Let by Virginia DOT on February 4, 2026, Albemarle, Culpeper. 3 bids received; low bid $2,330,482 by Caton Construction Group, Inc..
- Owner
- Virginia DOT
- Letting
- 04 FEB 2026
- Pay items
- 99
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Caton Construction Group, Inc. | $2,330,482 | Low |
| 2 | Independence Excavating, Inc. | $2,538,572 | +9.0% |
| 3 | North Construction, Inc. | $3,045,303 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Caton Construction Group, Inc. | 2. Independence Excavating, Inc. | 3. North Construction, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | NS const rec docs SWM facility construction record documents (105SP20-0002) | LS | 1 | $10,000 | $25,000 | $5,000.00 |
| 0001-0020 | Clearing and grubbing (301SD20-0001) | LS | 1 | $148,844 | $190,000 | $70,000 |
| 0001-0030 | 15" pipe (302SD20-0023) | LF | 32 | $375.00 | $450.00 | $1,000.00 |
| 0001-0040 | 15" storm sewer pipe (302SD20-0027) | LF | 368 | $340.00 | $400.00 | $400.00 |
| 0001-0050 | 18" storm sewer pipe (302SD20-0032) | LF | 132 | $365.00 | $500.00 | $300.00 |
| 0001-0060 | 24" storm sewer pipe (302SD20-0041) | LF | 25 | $432.50 | $600.00 | $320.00 |
| 0001-0070 | 30" pipe (302SD20-0047) | LF | 25 | $585.00 | $1,600.00 | $1,500.00 |
| 0001-0080 | 15" end section ES-1 or 2 (302SD20-0198) | EACH | 2 | $3,200.00 | $3,000.00 | $3,500.00 |
| 0001-0090 | 15" end section ES-1 (302SD20-0199) | EACH | 1 | $3,200.00 | $3,200.00 | $3,500.00 |
| 0001-0100 | 18" end section ES-1 or 2 (302SD20-0200) | EACH | 2 | $3,500.00 | $3,600.00 | $3,600.00 |
| 0001-0110 | Drop inlet DI-2A (302SD20-0239) | EACH | 2 | $12,500 | $8,000.00 | $10,000 |
| 0001-0120 | Drop inlet DI-5 (302SD20-0446) | EACH | 2 | $12,500 | $12,000 | $10,000 |
| 0001-0130 | Manhole MH-1 or 2 (302SD20-0662) | LF | 13.30 | $1,450.00 | $3,000.00 | $10,000 |
| 0001-0140 | Frame & cover MH-1 (302SD20-0663) | EACH | 2 | $1,800.00 | $2,000.00 | $2,500.00 |
| 0001-0150 | Stormwater man.drain.STR.SWM-1 (302SD20-0673) | LF | 14.30 | $7,800.00 | $4,000.00 | $1,500.00 |
| 0001-0160 | NS pipe rehabilitation (30" CMP, method B, category B) (302SX20-0013) | LF | 104 | $660.00 | $450.00 | $650.00 |
| 0001-0170 | Regular excavation (303SD20-0001) | CY | 4,579 | $40.00 | $83.00 | $120.00 |
| 0001-0180 | Borrow excavation (303SD20-0007) | CY | 2,925 | $72.00 | $50.00 | $140.00 |
| 0001-0190 | Temporary diversion dike (303SD20-0021) | LF | 394 | $13.00 | $20.00 | $10.00 |
| 0001-0200 | Check dam rock TY. I (303SD20-0022) | EACH | 13 | $1,150.00 | $2,500.00 | $1,000.00 |
| 0001-0210 | Siltation control excavation (303SD20-0029) | CY | 457 | $55.00 | $40.00 | $1.00 |
| 0001-0220 | Inlet protection type A (303SD20-0030) | EACH | 3 | $300.00 | $500.00 | $450.00 |
| 0001-0230 | Inlet protection type B (303SD20-0031) | EACH | 1 | $500.00 | $300.00 | $200.00 |
| 0001-0240 | Temp. silt fence type A (303SD20-0034) | LF | 2,048 | $8.50 | $12.00 | $10.00 |
| 0001-0250 | Storm water man. basin excav. (303SD20-0036) | CY | 694 | $180.00 | $69.00 | $120.00 |
| 0001-0260 | Aggr. matl. no. 25 or 26 (308SD20-0008) | TON | 111 | $60.00 | $75.00 | $70.00 |
| 0001-0270 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 873 | $88.00 | $90.00 | $70.00 |
| 0001-0280 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 363 | $152.28 | $130.00 | $250.00 |
| 0001-0290 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 253 | $168.78 | $140.00 | $250.00 |
| 0001-0300 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 618 | $156.85 | $135.00 | $250.00 |
| 0001-0310 | Saw-cut asphalt concrete full depth (315SD20-0104) | LF | 756 | $16.50 | $5.00 | $5.00 |
| 0001-0320 | Asphalt concrete TY. SM- 4.75A const (315SP20-0003) | TON | 48 | $470.05 | $320.00 | $250.00 |
| 0001-0330 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 61.08 | $124.00 | $200.00 | $120.00 |
| 0001-0340 | Underdrain UD-4 (501SD20-0004) | LF | 619 | $65.00 | $25.00 | $27.00 |
| 0001-0350 | Outlet pipe (501SD20-0009) | LF | 31 | $175.00 | $150.00 | $27.00 |
| 0001-0360 | Curb, STD. CG-2 (502SD20-0011) | LF | 256 | $31.50 | $37.00 | $45.00 |
| 0001-0370 | Curb, radial CG-2 (502SD20-0012) | LF | 100 | $31.50 | $41.00 | $45.00 |
| 0001-0380 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 149 | $31.50 | $42.00 | $65.00 |
| 0001-0390 | Concrete class A3 misc. (504SD20-0001) | CY | 2.72 | $3,270.00 | $500.00 | $700.00 |
| 0001-0400 | CG-12 detectable warning surface (504SD20-0002) | SY | 15 | $133.35 | $520.00 | $500.00 |
| 0001-0410 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 374 | $73.50 | $100.00 | $120.00 |
| 0001-0420 | Concrete class A-3 misc (504SD20-0010) | CY | 25.40 | $1,830.00 | $500.00 | $700.00 |
| 0001-0430 | Reinforcing steel miscellaneous (504SD20-0011) | LB | 215 | $26.25 | $4.00 | $10.00 |
| 0001-0440 | NS bike rack bike rack (504SX20-0004) | EACH | 10 | $2,200.00 | $600.00 | $1,400.00 |
| 0001-0450 | NS sidewalk 6" bus shelter pad (504SX20-0009) | SY | 18 | $73.50 | $150.00 | $140.00 |
| 0001-0460 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 418 | $35.00 | $38.00 | $46.00 |
| 0001-0470 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 311 | $40.00 | $40.00 | $52.00 |
| 0001-0480 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 4 | $3,750.00 | $3,500.00 | $4,800.00 |
| 0001-0490 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 2 | $1,500.00 | $1,800.00 | $1,950.00 |
| 0001-0500 | Guardrail ter.site preparation (505SD20-0039) | EACH | 4 | $500.00 | $2,000.00 | $2,000.00 |
| 0001-0510 | Guardrail GR-10 (505SD20-0040) | LF | 50 | $40.00 | $50.00 | $52.00 |
| 0001-0520 | Cable barricade CR-1 (505SD20-0066) | EACH | 1 | $1,000.00 | $1,900.00 | $1,500.00 |
| 0001-0530 | Remove existing guardrail (505SD20-0073) | LF | 1,037 | $5.00 | $4.00 | $7.00 |
| 0001-0540 | Fence FE-W1 (507SD20-0001) | LF | 500 | $15.55 | $10.00 | $40.00 |
| 0001-0550 | Corner brace unit FE-W1 or FE-W2 (507SD20-0004) | EACH | 4 | $250.00 | $375.00 | $1,000.00 |
| 0001-0560 | Demo. of pavement flexible (508SD20-0004) | SY | 250 | $27.00 | $70.00 | $40.00 |
| 0001-0570 | NS remove exist. fence remove exist. fence (510SX20-0016) | LF | 450 | $5.56 | $10.00 | $8.00 |
| 0001-0580 | NS adjust exist. drop inlet adjust exist. drop inlet (510SX20-0033) | EACH | 1 | $10,000 | $2,000.00 | $1,000.00 |
| 0001-0590 | Temporary sign (512SD20-0014) | SF | 507.50 | $20.00 | $50.00 | $1.00 |
| 0001-0600 | Truck mounted attenuator (512SD20-0023) | HR | 810 | $50.00 | $50.00 | $20.00 |
| 0001-0610 | Group 2 channelizing devices (512SD20-0024) | DAY | 22,464 | $0.15 | $3.00 | $2.00 |
| 0001-0620 | Electronic arrow board (512SD20-0026) | HR | 810 | $5.00 | $7.00 | $10.00 |
| 0001-0630 | Flagger service (512SD20-0027) | HR | 1,530 | $58.00 | $30.00 | $45.00 |
| 0001-0640 | Mobilization (513SD20-0001) | LS | 1 | $123,460 | $155,000 | $100,000 |
| 0001-0650 | NS field office (type 1 mod.) (514SX20-0001) | MO | 9 | $8,000.00 | $5,000.00 | $12,000 |
| 0001-0660 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 1,850 | $7.61 | $11.00 | $15.00 |
| 0001-0670 | Construction surveying constr. (517SD20-0001) | LS | 1 | $10,780 | $92,000 | $65,000 |
| 0001-0680 | Topsoil class A 2" (602SD20-0001) | ACRE | 1.50 | $18,100 | $10,000 | $25,000 |
| 0001-0690 | Temporary seed (603SD20-0002) | LB | 150 | $13.16 | $5.00 | $15.00 |
| 0001-0700 | Regular seed (603SD20-0003) | LB | 469 | $8.82 | $9.00 | $15.00 |
| 0001-0710 | Overseeding (603SD20-0004) | LB | 375 | $7.72 | $10.00 | $15.00 |
| 0001-0720 | Legume seed (603SD20-0005) | LB | 19 | $13.16 | $7.00 | $15.00 |
| 0001-0730 | Legume overseeding (603SD20-0006) | LB | 15 | $13.16 | $10.00 | $15.00 |
| 0001-0740 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 9,075 | $0.57 | $0.45 | $5.00 |
| 0001-0750 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 7,260 | $0.79 | $0.60 | $6.00 |
| 0001-0760 | Sediment retention roll 18" min (603SD20-0011) | LF | 279 | $10.00 | $20.00 | $15.00 |
| 0001-0770 | Fertilizer nitrogen - N (603SD20-0014) | LB | 150 | $1.83 | $1.00 | $15.00 |
| 0001-0780 | Fertilizer phosphorous - P (603SD20-0015) | LB | 105 | $1.83 | $2.00 | $15.00 |
| 0001-0790 | Fertilizer potassium - K (603SD20-0016) | LB | 105 | $1.83 | $1.00 | $15.00 |
| 0001-0800 | Lime (603SD20-0017) | TON | 8.25 | $308.00 | $285.00 | $500.00 |
| 0001-0810 | NS landscape permanent vegetative cover (605SX20-0013) | LS | 1 | $15,000 | $55,000 | $10,000 |
| 0001-0820 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 82 | $2.48 | $80.00 | $10.00 |
| 0001-0830 | Rolled erosion CTRL product EC-2 type 3 (606SD20-0003) | SY | 13 | $2.75 | $90.00 | $10.00 |
| 0001-0840 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 8 | $150.00 | $200.00 | $200.00 |
| 0001-0850 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 230 | $17.88 | $20.00 | $30.00 |
| 0001-0860 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 48 | $21.92 | $40.00 | $31.00 |
| 0001-0870 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 152 | $21.92 | $43.00 | $32.00 |
| 0001-0880 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 10 | $894.00 | $1,500.00 | $600.00 |
| 0001-0890 | Conc. found. STP-1, TY. D (700SD20-0041) | EACH | 26 | $395.00 | $500.00 | $600.00 |
| 0001-0900 | Junction box JB-S2 (700SD20-0178) | EACH | 2 | $10,000 | $3,000.00 | $3,500.00 |
| 0001-0910 | Conduit PVC 4" (700SD20-0196) | LF | 228 | $95.00 | $45.00 | $30.00 |
| 0001-0920 | Sign panel (701SD20-0001) | SF | 452 | $28.00 | $48.00 | $35.00 |
| 0001-0930 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 2,128 | $2.00 | $2.00 | $2.00 |
| 0001-0940 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 34 | $4.00 | $5.00 | $15.00 |
| 0001-0950 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 210 | $12.00 | $12.00 | $30.00 |
| 0001-0960 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 8 | $200.00 | $200.00 | $200.00 |
| 0001-0970 | PVMT symb MRKG thru arrow TY B, CL I (704SD20-0044) | EACH | 1 | $250.00 | $250.00 | $800.00 |
| 0001-0980 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 2 | $250.00 | $300.00 | $800.00 |
| 0001-0990 | MRKG int'L accessibility symb TY B CL I (704SD20-0092) | EACH | 2 | $250.00 | $320.00 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 4, 2026. Compiled by Mirage Metrics.