Independence Excavating, Inc.: VDOT bid record
Independence Excavating, Inc. submitted 10 bids on Virginia DOT contracts in the data, from 28 APR 2021 to 28 OCT 2026, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $1,095,791
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 3 | 0 | 0% |
| 2026 | 7 | 1 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 3 | 0 | 0% |
| Fredericksburg | 3 | 1 | 33% |
| Culpeper | 2 | 0 | 0% |
| Lynchburg | 1 | 0 | 0% |
| Salem | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sign | 512SD20-0014 | SF | 9 | 6 (67%) | $21.00 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 10 | 4 (40%) | $0.75 | $1.00 |
| Regular seed | 603SD20-0003 | LB | 10 | 4 (40%) | $9.50 | $13.50 |
| Fertilizer potassium - K | 603SD20-0016 | LB | 9 | 4 (44%) | $2.00 | $3.00 |
| Fertilizer nitrogen - N | 603SD20-0014 | LB | 9 | 4 (44%) | $2.00 | $3.00 |
| Temporary seed | 603SD20-0002 | LB | 9 | 4 (44%) | $10.00 | $17.60 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 8 | 4 (50%) | $5.85 | $8.00 |
| Hydraulic erosion control product type 3 | 603SD20-0009 | SY | 8 | 4 (50%) | $0.78 | $1.26 |
| Hydraulic erosion control product type 2 | 603SD20-0008 | SY | 8 | 4 (50%) | $0.68 | $1.02 |
| Curb, STD. CG-2 | 502SD20-0011 | LF | 5 | 4 (80%) | $30.00 | $30.00 |
| Fertilizer phosphorous - P | 603SD20-0015 | LB | 9 | 3 (33%) | $2.00 | $3.00 |
| Electronic arrow board | 512SD20-0026 | HR | 8 | 3 (38%) | $4.50 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sagres Construction Corporation | 4 | 1 of 4 |
| General Excavation, Inc. | 3 | 2 of 3 |
| Shirley Contracting Company, LLC | 3 | 2 of 3 |
| Caton Construction Group, Inc. | 2 | 2 of 2 |
| North Construction, Inc. | 2 | 1 of 2 |
| A & J Development and Excavation, Inc. | 2 | 2 of 2 |
| Allegheny Construction Company, Inc. | 2 | 2 of 2 |
| EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 1 | 1 of 1 |
| Stonewall Bridge, Inc. | 1 | 1 of 1 |
| Ardent Company, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000128987B24 | Fredericksburg | Bridge scour rehabilitation | 1 of 3 | $1,095,791 | Low, 31% under the second |
| 27 MAY 2026 | C0000115716M01 | Staunton | Smart scale - park and ride lot improvements | 5 of 6 | $2,052,925 | +24% |
| 22 APR 2026 | C0000101435C01 | Staunton | Route relocation | 3 of 5 | $3,982,863 | +38% |
| 25 FEB 2026 | C0000125982C01 | Culpeper | Roadway safety improvements | 2 of 4 | $1,298,826 | +1.0% |
| 25 FEB 2026 | C0000119385C01 | Lynchburg | Smart scale - turn lane improvements | 5 of 5 | $3,275,562 | +64% |
| 25 FEB 2026 | C0000115132M01 | Staunton | Smart scale - pedestrian road improvements | 4 of 5 | $3,288,838 | +39% |
| 04 FEB 2026 | C000118872C501 | Culpeper | Smart scale - park & ride | 2 of 3 | $2,538,572 | +9.0% |
| 27 OCT 2021 | C000110913C01B | Fredericksburg | Smart scale - intersection improvements | 3 of 3 | $475,413 | +23% |
| 22 SEP 2021 | C0000117020D36 | Salem | Sgr - culvert replacement | 3 of 3 | $1,797,207 | +11% |
| 28 APR 2021 | C0000109474C01 | Fredericksburg | Smart scale - commuter parking lot facility | 2 of 3 | $9,592,114 | +11% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.