Shirley Contracting Company, LLC: VDOT bid record
Shirley Contracting Company, LLC submitted 69 bids on Virginia DOT contracts in the data, from 23 APR 2002 to 23 SEP 2026, and was the low bidder on 34 of them (49%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $1,439,972,705,436
- Latest bid
- 23 SEP 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 4 | 2 | 50% |
| 2003 | 3 | 3 | 100% |
| 2004 | 5 | 3 | 60% |
| 2005 | 2 | 1 | 50% |
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 1 | 1 | 100% |
| 2010 | 4 | 2 | 50% |
| 2011 | 3 | 3 | 100% |
| 2012 | 4 | 2 | 50% |
| 2013 | 8 | 5 | 63% |
| 2014 | 4 | 3 | 75% |
| 2015 | 1 | 1 | 100% |
| 2016 | 3 | 1 | 33% |
| 2017 | 2 | 0 | 0% |
| 2018 | 2 | 1 | 50% |
| 2019 | 4 | 2 | 50% |
| 2020 | 6 | 1 | 17% |
| 2021 | 5 | 2 | 40% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 53 | 28 | 53% |
| Staunton | 5 | 2 | 40% |
| Fredericksburg | 5 | 1 | 20% |
| Culpeper | 2 | 1 | 50% |
| Richmond | 2 | 1 | 50% |
| Hampton Roads | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS traffic sign solar powered sequential dynamic curve warning system (chevron) | 700SX20-0021 | EACH | 47 | 28 (60%) | $50,000 | $17,950 |
| Allaying dust | 511SD20-0001 | HR | 24 | 18 (75%) | $12.50 | $22.00 |
| Overseeding | 603SD20-0004 | LB | 35 | 16 (46%) | $9.00 | $5.00 |
| Siltation control excavation | 303SD20-0029 | CY | 38 | 15 (39%) | $8.00 | $3.50 |
| Lime | 603SD20-0017 | TON | 37 | 15 (41%) | $275.00 | $200.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 26 | 14 (54%) | $20.00 | $20.00 |
| NS utilities 1.5" gas pipe | 520SX20-0012 | LF | 21 | 13 (62%) | $250.00 | $275.00 |
| Regular seed | 603SD20-0003 | LB | 38 | 12 (32%) | $15.50 | $13.50 |
| Electronic arrow board | 512SD20-0026 | HR | 28 | 12 (43%) | $3.38 | $5.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 28 | 12 (43%) | $11.00 | $9.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 27 | 12 (44%) | $4.00 | $5.00 |
| Borrow excavation | 305SD20-0001 | CY | 19 | 12 (63%) | $20.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Fort Myer Construction Corporation | 13 | 4 of 13 |
| Sagres Construction Corporation | 7 | 3 of 7 |
| The Lane Construction Corporation | 7 | 5 of 7 |
| General Excavation, Inc. | 6 | 5 of 6 |
| A & M Concrete Corp. | 5 | 1 of 5 |
| Flippo Construction Company, Inc. | 5 | 2 of 5 |
| A & W Contracting Corporation | 4 | 1 of 4 |
| Corman Kokosing Construction Company | 4 | 3 of 4 |
| Independence Excavating, Inc. | 3 | 1 of 3 |
| Corman Construction, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | C0000123290C01 | Richmond | Roundabout | 4 of 5 | $6,203,572 | +22% |
| 22 JUL 2026 | C0000120748C01 | Culpeper | Smart scale - roundabout and r-cut intersection | 2 of 4 | $12,852,446 | +17% |
| 27 MAY 2026 | C0000115716M01 | Staunton | Smart scale - park and ride lot improvements | 1 of 6 | $1,650,777 | Low, 3.0% under the second |
| 22 APR 2026 | C0000101435C01 | Staunton | Route relocation | 2 of 5 | $3,977,979 | +38% |
| 25 MAR 2026 | C0000119663N01 | Staunton | Smart scale - road safety improvements | 5 of 5 | $5,571,967 | +648% |
| 15 DEC 2021 | C0000118581C01 | Richmond | Arthur ashe ramp widening | 1 of 1 | $3,564,786 | Low |
| 26 MAY 2021 | C0000104005C01 | Northern Virginia | Hot lanes bicycle /pedestrian facilities - phase ii | 1 of 3 | $6,322,164 | Low, 26% under the second |
| 28 APR 2021 | C0000109474C01 | Fredericksburg | Smart scale - commuter parking lot facility | 3 of 3 | $9,922,880 | +15% |
| 24 MAR 2021 | C0000110433B43 | Northern Virginia | Sgr - bridge replacement over colvin run | 2 of 3 | $3,187,496 | +2.0% |
| 24 FEB 2021 | C0000115999C01 | Northern Virginia | Interstate auxilliary lane addition | 2 of 3 | $15,295,330 | +5.0% |
| 18 NOV 2020 | C0000118024B01 | Northern Virginia | None0233-000-916, b601 | 3 of 3 | $1,177,886 | +18% |
| 21 OCT 2020 | C0000105898B97 | Northern Virginia | Sgr - bridge rehab over catoctin creek | 3 of 3 | $3,665,668 | +21% |
| 23 SEP 2020 | C000115806N01B | Hampton Roads | On-call pipe rehabilitation and repair | 3 of 3 | $1,290,100 | +104% |
| 22 JUL 2020 | C0000111678B43 | Northern Virginia | Sgr - superstructure replacement and rehab | 1 of 3 | $2,378,670 | Low, 17% under the second |
| 27 MAY 2020 | C000113807M501 | Fredericksburg | Sgr* culvert replacement | 2 of 3 | $1,446,030 | +14% |
| 25 MAR 2020 | C0000018003C01 | Staunton | Smart scale - roadway widening | 2 of 2 | $19,687,100 | +8.0% |
| 04 DEC 2019 | C00100200DB10 | Hampton Roads | Skiffes creek bridge approaches | 1 of 1 | $24,484,560 | Low |
| 25 SEP 2019 | C0000110111B21 | Fredericksburg | Sgr - sbl bridge replacement over mattaponi river | 2 of 3 | $5,888,874 | +3.0% |
| 26 JUN 2019 | C0000109473M01 | Northern Virginia | Belmont ridge road interim widening | 1 of 3 | $4,320,738 | Low, 7.0% under the second |
| 15 JAN 2019 | C000114662B10 | Northern Virginia | Rte. 634 over clarks millpond, northumberland county | 2 of 2 | $1,485,295 | +18% |
| 08 AUG 2018 | C0000114213N01 | Northern Virginia | Embankment/slope failure field adjacent old telegraph road | 2 of 2 | $965,000 | +30% |
| 25 JAN 2018 | C00077384DB100 | Culpeper | Warrenton southern exchange, rt 15/17/29 design build | 1 of 1 | $19,586,840 | Low |
| 22 SEP 2017 | C0000111978M01 | Northern Virginia | Emergency contract-soil stabil. i-66/ rt 286 wbcs road | 2 of 2 | $1,497,646 | +9.0% |
| 25 JAN 2017 | C00099678B92B | Northern Virginia | Bridge replacement on route 727 over crooked run | 3 of 3 | $2,179,956 | +34% |
| 05 OCT 2016 | C000105463DB89 | Fredericksburg | Rt 606 bridge replacement design build | 1 of 1 | $16,469,880 | Low |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.