VDOT contract C0000101435C01 bid tabulation
Route relocation. Let by Virginia DOT on April 22, 2026, Frederick, Staunton. 5 bids received; low bid $2,889,243 by General Excavation, Inc..
- Owner
- Virginia DOT
- Letting
- 22 APR 2026
- Pay items
- 81
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Excavation, Inc. | $2,889,243 | Low |
| 2 | Shirley Contracting Company, LLC | $3,977,979 | +38% |
| 3 | Independence Excavating, Inc. | $3,982,863 | +38% |
| 4 | Sagres Construction Corporation | $4,368,544 | +51% |
| 5 | Ardent Company, LLC | $5,353,500 | +85% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Excavation, Inc. | 2. Shirley Contracting Company, LLC | 3. Independence Excavating, Inc. | 4. Sagres Construction Corporation | 5. Ardent Company, LLC |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Const rec docs SWM facility SWM facility as- built (105SP20-0002) | LS | 1 | $9,000.00 | $12,500 | $16,500 | $18,000 | $25,000 |
| 0001-0020 | Endwall EW-12 (302SD20-0013) | EACH | 10 | $1,520.00 | $1,750.00 | $1,500.00 | $2,500.00 | $1,000.00 |
| 0001-0030 | 15" pipe (302SD20-0023) | LF | 194 | $168.00 | $170.00 | $110.00 | $280.00 | $90.00 |
| 0001-0040 | 18" pipe (302SD20-0028) | LF | 164 | $180.00 | $275.00 | $275.00 | $300.00 | $95.00 |
| 0001-0050 | 24" conc. pipe (302SD20-0039) | LF | 50 | $184.00 | $300.00 | $400.00 | $350.00 | $110.00 |
| 0001-0060 | 23" X 14" elliptical conc. pipe (302SD20-0133) | LF | 130 | $206.00 | $325.00 | $550.00 | $350.00 | $130.00 |
| 0001-0070 | 30" X 19" elliptical pipe (302SD20-0134) | LF | 174 | $291.00 | $350.00 | $600.00 | $390.00 | $180.00 |
| 0001-0080 | 30" X 19" elliptical conc. pipe (302SD20-0135) | LF | 94 | $291.00 | $350.00 | $700.00 | $430.00 | $180.00 |
| 0001-0090 | 15" end section ES-1 or 2 (302SD20-0198) | EACH | 2 | $2,416.00 | $2,000.00 | $2,000.00 | $2,800.00 | $2,500.00 |
| 0001-0100 | 18" end section ES-1 or 2 (302SD20-0200) | EACH | 2 | $2,426.00 | $2,215.00 | $2,200.00 | $3,000.00 | $2,800.00 |
| 0001-0110 | 23" X 14" end section ES-1A (302SD20-0221) | EACH | 4 | $3,578.00 | $3,655.00 | $4,000.00 | $3,750.00 | $3,600.00 |
| 0001-0120 | 30" X 19" end section ES-1A (302SD20-0222) | EACH | 2 | $4,225.00 | $4,525.00 | $5,000.00 | $4,500.00 | $4,100.00 |
| 0001-0130 | Temp. dive. channel lining CL. A (302SD20-0670) | SY | 1,333 | $9.00 | $24.00 | $10.00 | $15.00 | $5.00 |
| 0001-0140 | Temp. dive. channel excavation (302SD20-0672) | CY | 525 | $54.00 | $27.00 | $80.00 | $80.00 | $40.00 |
| 0001-0150 | Stormwater man.drain.STR.SWM-1 (302SD20-0673) | LF | 7 | $1,679.00 | $2,120.00 | $2,000.00 | $2,000.00 | $4,300.00 |
| 0001-0160 | Regular excavation (303SD20-0001) | CY | 11,779 | $41.50 | $67.00 | $64.00 | $60.00 | $50.00 |
| 0001-0170 | Geotextile embankment stab. (303SD20-0013) | SY | 200 | $45.00 | $66.00 | $10.00 | $5.00 | $40.00 |
| 0001-0180 | Temporary diversion dike STD EC-9 (303SD20-0021) | LF | 873 | $5.50 | $7.00 | $18.00 | $15.00 | $10.00 |
| 0001-0190 | Check dam rock TY. II (303SD20-0023) | EACH | 31 | $506.00 | $563.00 | $800.00 | $550.00 | $500.00 |
| 0001-0200 | Siltation control excavation (303SD20-0029) | CY | 1,465 | $6.50 | $3.00 | $25.00 | $10.00 | $5.00 |
| 0001-0210 | Temp. silt fence type A (303SD20-0034) | LF | 8,376 | $4.50 | $7.25 | $17.00 | $5.00 | $1.00 |
| 0001-0220 | Temp. sediment basin excavation (303SD20-0035) | CY | 740 | $28.00 | $75.00 | $60.00 | $65.00 | $25.00 |
| 0001-0230 | Borrow excavation (305SD20-0001) | CY | 4,649 | $45.00 | $10.00 | $65.00 | $100.00 | $35.00 |
| 0001-0240 | Select matl. TY. II min. CBR- 30 (305SD20-0007) | CY | 1,883 | $56.00 | $150.00 | $110.00 | $100.00 | $70.00 |
| 0001-0250 | Geotextile subgrade stab. (305SD20-0009) | SY | 3,050 | $4.00 | $5.00 | $8.00 | $7.50 | $1.50 |
| 0001-0260 | Aggr. base matl. TY. I no. 21B (309SD20-0010) | TON | 3,944 | $37.00 | $75.00 | $79.00 | $75.00 | $35.00 |
| 0001-0270 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 165 | $128.00 | $202.00 | $144.00 | $400.00 | $130.00 |
| 0001-0280 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 978 | $105.50 | $168.00 | $99.00 | $185.00 | $130.00 |
| 0001-0290 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 1,388 | $97.50 | $155.00 | $98.00 | $175.00 | $130.00 |
| 0001-0300 | Asph. conc. TY. SM-9.5A maint (315SD20-0027) | TON | 889 | $116.00 | $185.00 | $145.00 | $200.00 | $130.00 |
| 0001-0310 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 1,145 | $7.50 | $1.00 | $6.00 | $6.00 | $5.00 |
| 0001-0320 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 60 | $177.00 | $190.00 | $200.00 | $155.00 | $56.00 |
| 0001-0330 | Underdrain UD-4 (501SD20-0004) | LF | 2,669 | $20.00 | $27.00 | $30.00 | $60.00 | $10.00 |
| 0001-0340 | Outlet pipe (501SD20-0009) | LF | 121 | $37.00 | $50.00 | $200.00 | $60.00 | $15.00 |
| 0001-0350 | R/W monument RM-2 (503SD20-0002) | EACH | 38 | $233.00 | $300.00 | $250.00 | $200.00 | $250.00 |
| 0001-0360 | Concrete class A3 misc. (504SD20-0001) | CY | 25 | $1,713.00 | $2,925.00 | $1,800.00 | $4,500.00 | $550.00 |
| 0001-0370 | Cable barricade CR-1 (505SD20-0066) | EACH | 1 | $5,500.00 | $3,395.00 | $2,000.00 | $1,000.00 | $2,000.00 |
| 0001-0380 | High visibility fence, 4 feet (507SD20-0027) | LF | 110 | $6.00 | $9.00 | $17.00 | $15.00 | $1.00 |
| 0001-0390 | Obscuring roadway (508SD20-0001) | UNIT | 40 | $1,665.00 | $2,856.00 | $1,700.00 | $3,500.00 | $500.00 |
| 0001-0400 | Demo. of pavement flexible (508SD20-0004) | SY | 2,854 | $17.00 | $5.00 | $12.00 | $10.00 | $10.00 |
| 0001-0410 | Flowable backfill (509SD20-0001) | CY | 2 | $1,210.00 | $2,640.00 | $2,800.00 | $750.00 | $500.00 |
| 0001-0420 | NS remove exist. pipe (510SX20-0039) | LF | 60 | $58.00 | $104.00 | $80.00 | $100.00 | $10.00 |
| 0001-0430 | Type 3 barricade 4' (512SD20-0012) | EACH | 2 | $845.00 | $500.00 | $600.00 | $500.00 | $350.00 |
| 0001-0440 | Type 3 barricade 8' (512SD20-0013) | EACH | 6 | $977.00 | $816.00 | $800.00 | $600.00 | $500.00 |
| 0001-0450 | Temporary sign (512SD20-0014) | SF | 959 | $44.00 | $125.00 | $90.00 | $27.49 | $20.00 |
| 0001-0460 | Truck mounted attenuator (512SD20-0023) | HR | 280 | $30.00 | $50.00 | $90.00 | $50.00 | $30.00 |
| 0001-0470 | Group 2 channelizing devices (512SD20-0024) | DAY | 591 | $2.00 | $8.00 | $30.00 | $5.00 | $0.50 |
| 0001-0480 | Port.changeable mess. sign (512SD20-0025) | HR | 1,680 | $10.00 | $15.00 | $14.00 | $25.00 | $3.00 |
| 0001-0490 | Electronic arrow board (512SD20-0026) | HR | 1,120 | $6.50 | $5.00 | $13.00 | $10.00 | $1.50 |
| 0001-0500 | Flagger service (512SD20-0027) | HR | 1,120 | $51.50 | $50.00 | $70.00 | $45.00 | $30.00 |
| 0001-0510 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 1,350 | $2.00 | $3.00 | $2.00 | $2.00 | $1.50 |
| 0001-0520 | Traffic barrier service conc. (512SD20-0066) | LF | 20 | $70.00 | $285.00 | $300.00 | $250.00 | $100.00 |
| 0001-0530 | Mobilization (513SD20-0001) | LS | 1 | $175,000 | $228,000 | $225,000 | $248,000 | $2,763,000 |
| 0001-0540 | Field office TY.III (514SD20-0003) | MO | 16 | $4,627.00 | $3,675.00 | $3,000.00 | $5,500.00 | $1,500.00 |
| 0001-0550 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 1,383 | $5.00 | $8.00 | $11.00 | $25.00 | $4.00 |
| 0001-0560 | Construction surveying constr. (517SD20-0001) | LS | 1 | $240,300 | $270,000 | $185,000 | $150,000 | $454,700 |
| 0001-0570 | NS topsoil class B 3" (602SX20-0005) | ACRE | 4.90 | $28,728 | $6,400.00 | $22,000 | $10,000 | $15,000 |
| 0001-0580 | Temporary seed (603SD20-0002) | LB | 490 | $13.50 | $21.00 | $12.00 | $15.00 | $2.00 |
| 0001-0590 | Regular seed (603SD20-0003) | LB | 1,960 | $8.00 | $12.00 | $7.00 | $10.00 | $2.00 |
| 0001-0600 | Overseeding (603SD20-0004) | LB | 1,568 | $7.00 | $11.00 | $6.50 | $10.00 | $2.00 |
| 0001-0610 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 29,645 | $0.50 | $1.00 | $0.45 | $1.50 | $0.50 |
| 0001-0620 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 23,716 | $0.75 | $1.75 | $0.65 | $1.50 | $0.50 |
| 0001-0630 | Fertilizer nitrogen - N (603SD20-0014) | LB | 490 | $1.25 | $2.00 | $1.15 | $1.50 | $2.00 |
| 0001-0640 | Fertilizer phosphorous - P (603SD20-0015) | LB | 343 | $1.25 | $2.00 | $1.15 | $1.50 | $2.00 |
| 0001-0650 | Fertilizer potassium - K (603SD20-0016) | LB | 343 | $1.25 | $2.00 | $1.15 | $1.50 | $2.00 |
| 0001-0660 | Lime (603SD20-0017) | TON | 27 | $286.00 | $435.00 | $265.00 | $250.00 | $250.00 |
| 0001-0670 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 5,728 | $2.25 | $11.00 | $2.00 | $5.00 | $0.50 |
| 0001-0680 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 43 | $2.50 | $33.00 | $2.25 | $5.00 | $0.50 |
| 0001-0690 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 7 | $250.00 | $2,190.00 | $700.00 | $300.00 | $250.00 |
| 0001-0700 | Remove exist overhead signal sign panel (700SD20-0010) | EACH | 3 | $1,100.00 | $2,510.00 | $800.00 | $1,750.00 | $300.00 |
| 0001-0710 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 2 | $253.00 | $1,930.00 | $250.00 | $300.00 | $350.00 |
| 0001-0720 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 81 | $28.00 | $35.00 | $45.00 | $32.00 | $7.00 |
| 0001-0730 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 11 | $32.00 | $36.00 | $100.00 | $37.00 | $9.00 |
| 0001-0740 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 12 | $605.00 | $1,710.00 | $1,100.00 | $700.00 | $85.00 |
| 0001-0750 | Sign panel (701SD20-0001) | SF | 74 | $62.50 | $78.00 | $40.00 | $75.00 | $20.00 |
| 0001-0760 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 3 | $1,540.00 | $1,800.00 | $700.00 | $2,500.00 | $550.00 |
| 0001-0770 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 1 | $1,320.00 | $1,000.00 | $600.00 | $2,000.00 | $1,242.00 |
| 0001-0780 | Remove existing signal head (703SD20-0046) | EACH | 4 | $990.00 | $2,400.00 | $800.00 | $1,250.00 | $150.00 |
| 0001-0790 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 11,400 | $1.25 | $2.00 | $1.00 | $1.50 | $0.98 |
| 0001-0800 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 370 | $10.75 | $17.00 | $10.00 | $12.00 | $9.75 |
| 0001-0810 | NS communication equip. NS modify existing controller cabinet (801SX20-0001) | EACH | 1 | $8,250.00 | $1.00 | $5,000.00 | $25,000 | $5,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of April 22, 2026. Compiled by Mirage Metrics.