Fort Myer Construction Corporation: VDOT bid record
Fort Myer Construction Corporation submitted 242 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 22 JUL 2026, and was the low bidder on 58 of them (24%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $154,989,481
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 5 | 0 | 0% |
| 2004 | 16 | 9 | 56% |
| 2005 | 20 | 5 | 25% |
| 2006 | 14 | 4 | 29% |
| 2007 | 10 | 1 | 10% |
| 2008 | 10 | 2 | 20% |
| 2009 | 4 | 1 | 25% |
| 2010 | 9 | 4 | 44% |
| 2011 | 22 | 3 | 14% |
| 2012 | 23 | 5 | 22% |
| 2013 | 22 | 7 | 32% |
| 2014 | 14 | 4 | 29% |
| 2015 | 19 | 2 | 11% |
| 2016 | 20 | 5 | 25% |
| 2017 | 9 | 2 | 22% |
| 2018 | 4 | 1 | 25% |
| 2019 | 6 | 1 | 17% |
| 2020 | 3 | 0 | 0% |
| 2021 | 5 | 1 | 20% |
| 2025 | 2 | 0 | 0% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 225 | 55 | 24% |
| Culpeper | 8 | 1 | 13% |
| Fredericksburg | 5 | 1 | 20% |
| Salem | 3 | 1 | 33% |
| Staunton | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS communication equip. install field router | 801SX20-0001 | EACH | 117 | 72 (62%) | $5,104.00 | $3,354.88 |
| Temporary sign | 512SD20-0014 | SF | 130 | 52 (40%) | $20.00 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 117 | 52 (44%) | $1.00 | $1.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 132 | 32 (24%) | $12.00 | $8.00 |
| Electronic arrow board | 512SD20-0026 | HR | 104 | 31 (30%) | $5.00 | $5.00 |
| 14/1 conductor cable enclosed | 700SD20-0118 | LF | 73 | 30 (41%) | $0.88 | $1.50 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 72 | 29 (40%) | $4.00 | $5.00 |
| NS pavement liquid asphalt coating (pavement marker grooves) | 316SX20-0004 | SY | 50 | 29 (58%) | $9.00 | $20.00 |
| Flagger service | 512SD20-0027 | HR | 93 | 28 (30%) | $28.50 | $20.00 |
| NS BR.superstr. wid./repair deck slab closure | 412SX20-0015 | SY | 81 | 28 (35%) | $250.00 | $125.00 |
| Agr. base mat. TY.I or II no. 21A or 21B | 305SP20-0003 | TON | 39 | 27 (69%) | $40.00 | $33.78 |
| Truck mounted attenuator | 512SD20-0023 | HR | 103 | 26 (25%) | $30.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Virginia Paving Co., Div. of the Lane Constr. Corp. | 62 | 47 of 62 |
| A & M Concrete Corp. | 44 | 24 of 44 |
| Martins Construction Corp. | 42 | 31 of 42 |
| Arthur Construction Co., Inc. | 40 | 31 of 40 |
| Sagres Construction Corporation | 19 | 6 of 19 |
| Francis O. Day Co., Inc. | 13 | 9 of 13 |
| Shirley Contracting Company, LLC | 13 | 9 of 13 |
| Finley Asphalt & Sealing, Inc. | 11 | 6 of 11 |
| Freyssinet, Inc. | 9 | 1 of 9 |
| D&F Construction, Inc. | 9 | 6 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000126560B40 | Northern Virginia | Bridge rehabilitation | 2 of 7 | $5,691,081 | +23% |
| 24 JUN 2026 | C0000126561B48 | Northern Virginia | Bridge rehabilitation | 2 of 6 | $1,896,541 | +2.0% |
| 27 MAY 2026 | C0000121826C01 | Northern Virginia | Box culvert replacement | 1 of 4 | $1,598,070 | Low, 22% under the second |
| 22 APR 2026 | C0000124564B64 | Culpeper | Deck replacement | 4 of 6 | $1,541,983 | +17% |
| 04 FEB 2026 | C0000113851B01 | Fredericksburg | Sgr - bridge replacement | 5 of 8 | $4,477,731 | +17% |
| 22 OCT 2025 | C0000118393X01 | Northern Virginia | Retaining wall repair | 2 of 2 | $10,347,017 | +58% |
| 22 OCT 2025 | C0000118396B57 | Northern Virginia | Bridge rehabilitation | 2 of 4 | $8,858,509 | +16% |
| 26 MAY 2021 | C0000104005C01 | Northern Virginia | Hot lanes bicycle /pedestrian facilities - phase ii | 3 of 3 | $8,432,350 | +33% |
| 24 MAR 2021 | C00000118232N01 | Northern Virginia | On-call interstate pavement patching | 1 of 3 | $852,464 | Low, 24% under the second |
| 24 MAR 2021 | C0000110433B43 | Northern Virginia | Sgr - bridge replacement over colvin run | 3 of 3 | $3,408,841 | +9.0% |
| 24 MAR 2021 | C0000117814N01 | Northern Virginia | 2021 plant mix | 3 of 3 | $4,090,601 | +51% |
| 24 FEB 2021 | C0000115999C01 | Northern Virginia | Interstate auxilliary lane addition | 3 of 3 | $17,154,470 | +17% |
| 24 JUN 2020 | C0000112505N01 | Northern Virginia | On-call bridge repair and maintenance | 2 of 2 | $4,933,960 | +18% |
| 27 MAY 2020 | C0000116807N01 | Northern Virginia | 2020 plant mix | 3 of 3 | $4,985,956 | +40% |
| 25 MAR 2020 | C0000115670B01 | Northern Virginia | Approach slab replacement | 2 of 3 | $1,233,452 | +123% |
| 26 JUN 2019 | C0000109473M01 | Northern Virginia | Belmont ridge road interim widening | 3 of 3 | $4,894,338 | +13% |
| 27 FEB 2019 | C0000113505B27B | Culpeper | Nhpp-pm07(315)0066-030-837 b627, b628 | 2 of 2 | $695,917 | +2.0% |
| 27 FEB 2019 | C0000113564N01B | Northern Virginia | On-call interstate asphalt concrete patching | 1 of 3 | $874,547 | Low, 8.0% under the second |
| 13 FEB 2019 | C0000114232N01 | Northern Virginia | 2019 plant mix | 3 of 3 | $5,100,420 | +23% |
| 23 JAN 2019 | C0000111320B47 | Northern Virginia | Sgr-superstructure replacement over arlington blvd | 2 of 3 | $2,723,270 | +47% |
| 23 JAN 2019 | CM919PMF114233 | Northern Virginia | 2019 plant mix | 2 of 2 | $5,124,640 | +17% |
| 19 DEC 2018 | C000112770M01 | Northern Virginia | Proposed landscape construction | 1 of 2 | $991,684 | Low, 11% under the second |
| 14 FEB 2018 | C0000111675N01 | Northern Virginia | Sgr - 2018 plant mix | 2 of 2 | $1,281,876 | +25% |
| 24 JAN 2018 | C0000112195N01 | Northern Virginia | 2018 plant mix | 3 of 3 | $6,976,651 | +22% |
| 24 JAN 2018 | C0000112197N01 | Northern Virginia | 2018 plant mix | 3 of 3 | $7,853,120 | +8.0% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.