Francis O. Day Co., Inc.: VDOT bid record
Francis O. Day Co., Inc. submitted 101 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 04 FEB 2026, and was the low bidder on 39 of them (39%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $181,395,737
- Latest bid
- 04 FEB 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 1 | 100% |
| 2003 | 3 | 0 | 0% |
| 2004 | 2 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2006 | 4 | 3 | 75% |
| 2007 | 2 | 0 | 0% |
| 2008 | 3 | 3 | 100% |
| 2009 | 3 | 3 | 100% |
| 2010 | 1 | 0 | 0% |
| 2011 | 2 | 1 | 50% |
| 2012 | 4 | 3 | 75% |
| 2013 | 6 | 2 | 33% |
| 2014 | 7 | 4 | 57% |
| 2015 | 11 | 3 | 27% |
| 2016 | 6 | 3 | 50% |
| 2017 | 7 | 2 | 29% |
| 2018 | 9 | 1 | 11% |
| 2019 | 7 | 5 | 71% |
| 2020 | 8 | 1 | 13% |
| 2021 | 8 | 2 | 25% |
| 2025 | 3 | 0 | 0% |
| 2026 | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asph. conc. TY. SM-9.5D maint | 315SD20-0029 | TON | 66 | 38 (58%) | $64.85 | $70.50 |
| Type B class I PVMT line MRKG 24" | 704SD20-0010 | LF | 93 | 31 (33%) | $6.73 | $7.50 |
| Conduit metal 1" | 700SD20-0183 | LF | 73 | 25 (34%) | $3.25 | $5.25 |
| NS pave. message marking "stop" TY. B, CL. I | 704SX20-0005 | EACH | 70 | 24 (34%) | $737.70 | $487.88 |
| 14/1 conductor cable enclosed | 700SD20-0118 | LF | 74 | 23 (31%) | $1.00 | $1.50 |
| Loop saw cut 3/8" | 703SD20-0042 | LF | 71 | 23 (32%) | $7.00 | $12.00 |
| Loop saw cut 5/8" | 703SD20-0043 | LF | 70 | 18 (26%) | $22.11 | $20.52 |
| Asph. conc. TY. SM-9.5A maint | 315SD20-0027 | TON | 51 | 18 (35%) | $66.00 | $69.95 |
| Tack coat | 310SD20-0001 | GAL | 33 | 17 (52%) | $2.00 | $2.00 |
| Asph. conc. TY. IM-19.0A maint | 315SD20-0040 | TON | 42 | 14 (33%) | $63.85 | $70.00 |
| Asph. conc. TY. SM-12.5E maint | 315SD20-0036 | TON | 18 | 14 (78%) | $84.22 | $88.72 |
| Flexible pavement planing above 2"-4" | 515SD20-0014 | SY | 63 | 13 (21%) | $3.22 | $3.10 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Paving Corporation | 53 | 30 of 53 |
| Virginia Paving Co., Div. of the Lane Constr. Corp. | 50 | 26 of 50 |
| Arthur Construction Co., Inc. | 20 | 11 of 20 |
| Eurovia Atlantic Coast LLC DBA Virginia Paving Company | 20 | 8 of 20 |
| Fort Myer Construction Corporation | 13 | 4 of 13 |
| Allan Myers Va, Inc. | 9 | 6 of 9 |
| EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 6 | 4 of 6 |
| Julius Branscome, Inc. | 4 | 2 of 4 |
| Kickin Asphalt Paving and Sealing, LLC | 4 | 4 of 4 |
| Stuart M. Perry, Incorporated | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 FEB 2026 | C0000128014P01 | Northern Virginia | 2026 plant mix - primary | 4 of 4 | $5,432,671 | +26% |
| 14 JAN 2026 | C0000128011P01 | Northern Virginia | 2026 plant mix - interstate | 1 of 3 | $4,891,671 | Low, 8.0% under the second |
| 14 JAN 2026 | C0000128010P01 | Northern Virginia | 2026 plant mix - interstate | 1 of 3 | $3,792,671 | Low, 10% under the second |
| 17 DEC 2025 | C0000127755P01 | Northern Virginia | 2026 plant mix - secondary | 5 of 5 | $3,316,652 | +36% |
| 17 DEC 2025 | C0000127754P01 | Northern Virginia | 2026 plant mix - secondary | 5 of 5 | $3,930,067 | +43% |
| 17 DEC 2025 | C0000127751P01 | Northern Virginia | 2026 plant mix - secondary | 5 of 5 | $6,080,897 | +28% |
| 24 MAR 2021 | C0000116989N01 | Northern Virginia | Sgr - 2021 plant mix | 2 of 2 | $3,985,594 | +12% |
| 24 MAR 2021 | C0000117813N01 | Northern Virginia | 2021 plant mix | 3 of 3 | $3,324,918 | +28% |
| 24 MAR 2021 | C0000117832N01 | Northern Virginia | Sgr - 2021 plant mix | 3 of 3 | $2,051,291 | +8.0% |
| 24 FEB 2021 | C0000117341N01 | Northern Virginia | 2021 plant mix | 1 of 3 | $4,182,958 | Low, 5.0% under the second |
| 24 FEB 2021 | C0000117781N01 | Northern Virginia | 2021 plant mix | 3 of 3 | $2,922,062 | +16% |
| 20 JAN 2021 | C0000117346N01 | Northern Virginia | 2021 plant mix | 1 of 3 | $3,224,321 | Low, 17% under the second |
| 20 JAN 2021 | C0000117828N01 | Northern Virginia | 2021 plant mix | 2 of 3 | $3,050,645 | +1.0% |
| 20 JAN 2021 | C0000118098N01 | Northern Virginia | 2021 plant mix | 2 of 3 | $6,981,850 | +15% |
| 27 MAY 2020 | C0000116807N01 | Northern Virginia | 2020 plant mix | 1 of 3 | $3,562,562 | Low, 12% under the second |
| 22 APR 2020 | C000116017N01B | Northern Virginia | 2020 plant mix | 2 of 3 | $3,622,720 | +4.0% |
| 25 MAR 2020 | C0000115928N01 | Northern Virginia | 2020 plant mix | 2 of 3 | $3,145,616 | +1.0% |
| 26 FEB 2020 | C0000115933N01 | Northern Virginia | 2020 plant mix | 3 of 3 | $3,441,803 | +8.0% |
| 26 FEB 2020 | C0000116050N01 | Northern Virginia | 2020 plant mix | 3 of 3 | $4,865,329 | +5.0% |
| 26 FEB 2020 | C000115030N501 | Northern Virginia | 2020 plant mix | 2 of 3 | $4,086,884 | +2.0% |
| 26 FEB 2020 | C000115934N501 | Northern Virginia | 2020 plant mix | 3 of 3 | $2,417,000 | +5.0% |
| 26 FEB 2020 | CM920PMV116055 | Northern Virginia | 2020 plant mix | 3 of 3 | $4,412,061 | +3.0% |
| 27 FEB 2019 | C0000114239N01 | Northern Virginia | 2019 plant mix | 1 of 3 | $3,446,534 | Low, 1.0% under the second |
| 27 FEB 2019 | C0000114240N01 | Northern Virginia | 2019 plant mix | 1 of 3 | $4,460,063 | Low, 0.0% under the second |
| 27 FEB 2019 | CM919PMA114234 | Northern Virginia | 2019 plant mix | 1 of 3 | $1,316,879 | Low, 6.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.