VDOT contract C0000127751P01 bid tabulation
2026 plant mix - secondary. Let by Virginia DOT on December 17, 2025, Fairfax, Northern Virginia. 5 bids received; low bid $4,745,102 by Superior Paving Corporation.
- Owner
- Virginia DOT
- Letting
- 17 DEC 2025
- Pay items
- 38
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Superior Paving Corporation | $4,745,102 | Low |
| 2 | Arthur Construction Co., Inc. | $4,805,551 | +1.0% |
| 3 | EUROVIA ATLANTIC COAST LLC dba VIRGINIA | $5,106,506 | +8.0% |
| 4 | Allan Myers Va, Inc. | $5,344,777 | +13% |
| 5 | Francis O. Day Co., Inc. | $6,080,897 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Paving Corporation | 2. Arthur Construction Co., Inc. | 3. EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 4. Allan Myers Va, Inc. | 5. Francis O. Day Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Inlet protection type B (303SD20-0031) | EACH | 29 | $1.04 | $25.00 | $95.00 | $0.01 | $250.00 |
| 0001-0020 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 150 | $84.00 | $50.00 | $75.00 | $100.87 | $120.00 |
| 0001-0030 | Tack coat (310SD20-0001) | GAL | 34,665 | $0.01 | $0.01 | $0.01 | $0.01 | $0.90 |
| 0001-0040 | Pavement shoulder wedge prep. const (315SP20-0006) | LF | 15,000 | $0.01 | $0.50 | $0.01 | $0.01 | $0.95 |
| 0001-0050 | Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049) | TON | 34,252.08 | $104.50 | $109.00 | $106.00 | $127.21 | $105.00 |
| 0001-0060 | Surface preparation and restoration type II (323SD20-0041) | TON | 680 | $65.00 | $85.00 | $165.00 | $86.00 | $250.00 |
| 0001-0070 | Flagger service (512SD20-0027) | HR | 1,207 | $33.00 | $25.00 | $35.00 | $63.00 | $73.00 |
| 0001-0080 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 148,570 | $0.18 | $0.28 | $0.01 | $0.17 | $0.18 |
| 0001-0090 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 31,158 | $0.19 | $0.32 | $0.01 | $0.18 | $0.19 |
| 0001-0100 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 2,676 | $0.27 | $0.45 | $0.25 | $0.26 | $0.27 |
| 0001-0110 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 1,013 | $1.04 | $3.00 | $1.00 | $1.00 | $1.05 |
| 0001-0120 | Temp. PVMT MRKG TY. A, 24" (512SD20-0050) | LF | 3,901 | $3.12 | $5.00 | $3.00 | $3.00 | $3.10 |
| 0001-0130 | Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052) | EACH | 68 | $56.94 | $80.00 | $35.00 | $54.75 | $57.00 |
| 0001-0140 | NS maintenance of traffic MOT (512SP20-0002) | LS | 1 | $110,000 | $138,611 | $105,000 | $25,157 | $465,657 |
| 0001-0150 | NS traffic control speed hump (512SX20-0019) | EACH | 4 | $5,000.00 | $5,750.00 | $7,000.00 | $6,335.00 | $5,500.00 |
| 0001-0160 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 346,582.72 | $0.50 | $0.01 | $1.35 | $0.15 | $2.60 |
| 0001-0170 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 45,074 | $0.10 | $0.11 | $0.10 | $0.10 | $0.10 |
| 0001-0180 | Conduit metal 1" (700SD20-0183) | LF | 378 | $5.20 | $5.25 | $5.00 | $5.00 | $5.00 |
| 0001-0190 | Loop saw cut 3/8" (703SD20-0042) | LF | 11,946 | $14.30 | $14.45 | $13.75 | $13.75 | $14.25 |
| 0001-0200 | Loop saw cut 5/8" (703SD20-0043) | LF | 2,670 | $25.48 | $25.75 | $24.50 | $24.50 | $25.00 |
| 0001-0210 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 157,582 | $1.23 | $1.05 | $1.20 | $1.18 | $1.25 |
| 0001-0220 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 52,418 | $1.49 | $2.00 | $1.40 | $1.43 | $1.50 |
| 0001-0230 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 2,876 | $1.76 | $3.05 | $1.70 | $1.69 | $1.75 |
| 0001-0240 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 1,013 | $2.28 | $5.15 | $2.20 | $2.19 | $2.25 |
| 0001-0250 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 5,649 | $10.02 | $9.95 | $9.60 | $9.63 | $10.00 |
| 0001-0260 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 432 | $49.95 | $57.00 | $48.00 | $48.03 | $50.00 |
| 0001-0270 | PVMT MSG. mark. "only" TY B, CL. I, 6' (704SD20-0035) | EACH | 9 | $487.33 | $950.00 | $470.00 | $468.57 | $487.00 |
| 0001-0280 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 232 | $166.54 | $150.00 | $160.00 | $160.13 | $166.50 |
| 0001-0290 | MRKG DBL turn arr. thru/LT or RT TY A (704SD20-0049) | EACH | 6 | $80.25 | $130.00 | $77.00 | $77.16 | $80.00 |
| 0001-0300 | DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050) | EACH | 11 | $277.15 | $225.00 | $270.00 | $266.48 | $277.00 |
| 0001-0310 | Symb MRKG lane reduction arr TY B CL I (704SD20-0059) | EACH | 1 | $983.86 | $1,000.00 | $945.00 | $945.98 | $984.00 |
| 0001-0320 | Symb MRKG bicycle thru arrow TY B CL I (704SD20-0095) | EACH | 43 | $128.62 | $150.00 | $125.00 | $123.67 | $128.50 |
| 0001-0330 | Symb MRKG helmeted bicyclist TY B CL I (704SD20-0101) | EACH | 115 | $343.94 | $305.00 | $330.00 | $330.70 | $344.00 |
| 0001-0340 | PVMT symb MRKG shared lane TY B CL I (704SD20-0104) | EACH | 33 | $393.35 | $430.00 | $380.00 | $378.20 | $393.50 |
| 0001-0350 | PVMT MSG. mark. “only” TY B, CL. I, 8’ (704SD20-0107) | EACH | 6 | $489.61 | $465.00 | $470.00 | $470.76 | $489.50 |
| 0001-0360 | PVMT MSG. mark. “school” TY B, CL I, 8’ (704SD20-0110) | EACH | 2 | $1,191.40 | $1,000.00 | $1,150.00 | $1,145.52 | $1,191.00 |
| 0001-0370 | NS pave. message marking "slow" TY. B CL. I (704SX20-0005) | EACH | 1 | $1,016.86 | $600.00 | $975.00 | $977.71 | $1,017.00 |
| 0002-0380 | NS select material alternate shoulder materials (305SX20-0006) | TON | 1 | $76.01 | $50.00 | $65.00 | $105.00 | $115.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of December 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.