Stuart M. Perry, Incorporated: VDOT bid record

Stuart M. Perry, Incorporated submitted 46 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 22 JUL 2026, and was the low bidder on 25 of them (54%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Virginia DOT
Low bid volume
$37,774,067
Latest bid
22 JUL 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

46Bids
25Low bids
54Win rate, percent
+7.0%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
200211100%
2003100%
200822100%
20095240%
201022100%
20113133%
20124375%
20134250%
20143133%
201522100%
201633100%
20172150%
201822100%
20193133%
202011100%
20212150%
2025400%
2026200%
Stuart M. Perry, Incorporated, VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Staunton361953%
Northern Virginia7571%
Culpeper3133%
Stuart M. Perry, Incorporated, VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Agr. base mat. TY.I or II no. 21A or 21B305SP20-0003TON3820 (53%)$30.00$33.78
Asph. conc. TY. SM-12.5A maint315SD20-0032TON2017 (85%)$72.42$69.00
Asph. conc. TY. SM-12.5D maint315SD20-0034TON1711 (65%)$80.16$68.00
Flex. pave. tie-in planing 0"-2"515SD20-0011SY229 (41%)$4.50$6.44
Tack coat310SD20-0001GAL189 (50%)$2.17$2.00
Type B class I PVMT line MRKG 24"704SD20-0010LF318 (26%)$7.20$7.50
Asph. conc. TY. SM-9.5A maint315SD20-0027TON147 (50%)$65.58$69.95
Erad. of exist.nonlinear pav.mark54106SF107 (70%)$0.50$4.00
Asph. conc. TY. IM-19.0A maint315SD20-0040TON77 (100%)$60.00$70.00
NS select material alternate shoulder material305SX20-0006TON136 (46%)$52.00$40.00
Flexible pavement planing above 2"-4"515SD20-0014SY96 (67%)$2.66$3.10
Type A PVMT line MRKG 4"704SD20-0001LF315 (16%)$0.20$0.24
Stuart M. Perry, Incorporated, VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
W-L Construction & Paving, Inc.2910 of 29
Superior Paving Corporation189 of 18
Arthur Construction Co., Inc.42 of 4
Finley Asphalt & Sealing, Inc.42 of 4
Kickin Asphalt Paving and Sealing, LLC42 of 4
Francis O. Day Co., Inc.41 of 4
Allan Myers Va, Inc.32 of 3
Adams Construction Company32 of 3
Kickin Asphalt Paving and Excavating, LLC30 of 3
Apac-Virginia, Inc.21 of 2
Stuart M. Perry, Incorporated, VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 JUL 2026C0000128797P01Northern Virginia2027 plant mix - secondary4 of 5$3,297,647+18%
14 JAN 2026CM826PME127547Staunton2026 plant mix - primary4 of 4$3,305,343+22%
17 DEC 2025CM826PMR127551Staunton2026 plant mix - primary4 of 4$3,738,664+7.0%
17 DEC 2025CM826PMI127550Staunton2026 plant mix - primary3 of 3$2,914,973+16%
19 NOV 2025CM826PMJ127374Staunton2026 plant mix - secondary2 of 3$2,391,558+2.0%
19 NOV 2025CM826PMT127376Staunton2026 plant mix - secondary3 of 4$1,800,464+5.0%
24 MAR 2021C0000117337N01Northern Virginia2021 plant mix1 of 3$2,426,520Low, 10% under the second
24 MAR 2021CM821PMJ117916Staunton2021 plant mix2 of 3$2,006,068+1.0%
26 FEB 2020C0000115933N01Northern Virginia2020 plant mix1 of 3$3,201,040Low, 6.0% under the second
27 FEB 2019CM819PMI113669Staunton2019 plant mix2 of 2$582,407+31%
23 JAN 2019C0000114220N01Northern Virginia2019 plant mix1 of 3$4,023,522Low, 3.0% under the second
09 JAN 2019CM819PMH113675Staunton2019 plant mix2 of 3$1,338,083+5.0%
14 FEB 2018CPM8Z800110638Staunton2018 plant mix1 of 2$301,173Low, 3.0% under the second
24 JAN 2018C0000112187N01Northern Virginia2018 plant mix1 of 3$5,754,608Low, 5.0% under the second
25 JAN 2017CM817PMH107823Staunton2017 plant mix1 of 2$740,970Low, 8.0% under the second
25 JAN 2017CM917PMK109143Northern Virginia2017 plant mix3 of 3$6,302,007+7.0%
24 FEB 2016CPM8J600107825Staunton2016 plant mix (volume 1 of 2)1 of 3$1,115,279Low, 5.0% under the second
03 FEB 2016C0000108025N01Northern Virginia2016 plant mix ( volume 1 of 2 )1 of 3$4,934,281Low, 12% under the second
03 FEB 2016CPM8I600107251Staunton2016 plant mix (volume 1 of 2)1 of 2$404,972Low, 9.0% under the second
25 MAR 2015CPM8X500105939StauntonPlant mix clarke & frederick counties1 of 3$639,432Low, 9.0% under the second
21 JAN 2015CPM8I500105940StauntonPlant mix frederick county1 of 3$561,213Low, 8.0% under the second
22 JAN 2014CM814PMF104529StauntonPlant mix - primary - page3 of 3$998,846+2.0%
22 JAN 2014CM814PMH104534StauntonPlant mix - primary - clarke2 of 2$2,054,418+3.0%
22 JAN 2014CM814PMK104545StauntonPlant mix - primary - warren1 of 2$1,072,915Low, 3.0% under the second
28 AUG 2013CM814PMW104402StauntonPlant mix - secondary - frederick and shenandoah1 of 3$1,431,306Low, 12% under the second
Stuart M. Perry, Incorporated: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy