Finley Asphalt & Sealing, Inc.: VDOT bid record
Finley Asphalt & Sealing, Inc. submitted 84 bids on Virginia DOT contracts in the data, from 24 JAN 2007 to 24 JUN 2026, and was the low bidder on 22 of them (26%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $15,344,961
- Latest bid
- 24 JUN 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2007 | 7 | 4 | 57% |
| 2008 | 10 | 3 | 30% |
| 2009 | 2 | 1 | 50% |
| 2010 | 3 | 0 | 0% |
| 2011 | 10 | 4 | 40% |
| 2012 | 9 | 2 | 22% |
| 2013 | 17 | 4 | 24% |
| 2014 | 3 | 1 | 33% |
| 2015 | 1 | 0 | 0% |
| 2016 | 3 | 1 | 33% |
| 2017 | 3 | 1 | 33% |
| 2018 | 3 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2025 | 2 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 41 | 16 | 39% |
| Fredericksburg | 16 | 1 | 6% |
| Staunton | 14 | 4 | 29% |
| Richmond | 6 | 0 | 0% |
| Culpeper | 5 | 1 | 20% |
| Salem | 1 | 0 | 0% |
| Hampton Roads | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 37 | 25 (68%) | $2,025.00 | $2,000.00 |
| NS pavement liquid asphalt coating (pavement marker grooves) | 316SX20-0004 | SY | 51 | 23 (45%) | $15.90 | $20.00 |
| Type B class I pave. line marking 4" | 54032 | LF | 28 | 15 (54%) | $0.80 | $0.52 |
| Flagger service | 512SD20-0027 | HR | 45 | 14 (31%) | $25.00 | $20.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 36 | 14 (39%) | $10.00 | $8.00 |
| 14/1 conductor cable enclosed | 700SD20-0118 | LF | 23 | 14 (61%) | $1.27 | $1.50 |
| Temporary sign | 512SD20-0014 | SF | 33 | 13 (39%) | $25.00 | $20.00 |
| CG-12 detectable warning surface | 13108 | SY | 15 | 13 (87%) | $80.00 | $246.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 45 | 12 (27%) | $1.50 | $1.00 |
| Pavement message mark. elongated arrow single | 54300 | EACH | 23 | 11 (48%) | $100.80 | $100.00 |
| NS traffic control speed hump | 512SX20-0019 | EACH | 20 | 11 (55%) | $700.00 | $2,000.00 |
| Type B class I PVMT line MRKG 24" | 704SD20-0010 | LF | 41 | 10 (24%) | $8.90 | $7.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Arthur Construction Co., Inc. | 32 | 16 of 32 |
| Virginia Paving Co., Div. of the Lane Constr. Corp. | 14 | 7 of 14 |
| A & M Concrete Corp. | 14 | 7 of 14 |
| Fort Myer Construction Corporation | 11 | 5 of 11 |
| Superior Paving Corporation | 10 | 8 of 10 |
| W-L Construction & Paving, Inc. | 7 | 2 of 7 |
| M & F Concrete, Inc. | 5 | 4 of 5 |
| Chemung Contracting Corporation | 4 | 4 of 4 |
| Stuart M. Perry, Incorporated | 4 | 2 of 4 |
| Julius Branscome, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUN 2026 | C0000128731N01 | Fredericksburg | On-call - ada curb ramp improvements | 4 of 4 | $626,941 | +89% |
| 24 JUN 2026 | C0000128466N01 | Culpeper | On call ada compliance ramps | 3 of 3 | $524,154 | +68% |
| 25 MAR 2026 | C0000119663N01 | Staunton | Smart scale - road safety improvements | 2 of 5 | $881,934 | +18% |
| 25 MAR 2026 | C0000126858N01 | Salem | On-call ada compliance curb ramp improvements | 3 of 6 | $823,653 | +18% |
| 04 FEB 2026 | CM726PMX128258 | Culpeper | Fdr* 2026 plant mix - secondary | 3 of 3 | $654,033 | +116% |
| 04 FEB 2026 | C0000127320N01 | Richmond | On call fdr - secondary | 2 of 2 | $1,852,497 | +141% |
| 17 DEC 2025 | C0000125882N01 | Fredericksburg | Trench widening | 5 of 6 | $1,131,008 | +76% |
| 22 OCT 2025 | C0000127769N01 | Northern Virginia | On-call rural rustic road | 3 of 5 | $2,361,610 | +18% |
| 28 APR 2021 | CM621PM1117142 | Northern Virginia | Sgr-2021 plant mix | 1 of 2 | $217,753 | Low, 27% under the second |
| 24 MAR 2021 | C00000118232N01 | Northern Virginia | On-call interstate pavement patching | 2 of 3 | $1,055,242 | +24% |
| 21 OCT 2020 | C0000082892M01 | Richmond | Sight distance improvement and trench widening | 3 of 3 | $562,805 | +21% |
| 24 JUN 2020 | C0000114697P01B | Richmond | On call paving | 2 of 3 | $679,099 | +5.0% |
| 27 FEB 2019 | C0000113564N01B | Northern Virginia | On-call interstate asphalt concrete patching | 3 of 3 | $1,008,228 | +15% |
| 19 DEC 2018 | C0000114191N01 | Staunton | On-call ada compliance | 3 of 3 | $290,740 | +58% |
| 25 APR 2018 | C0000112118N01 | Northern Virginia | On-call ada compliance | 2 of 3 | $767,761 | +10% |
| 25 APR 2018 | C0000112649N01 | Richmond | On call paving | 3 of 3 | $663,296 | +20% |
| 21 JUN 2017 | C00000110751N01 | Northern Virginia | Trail maintenance repairs | 1 of 3 | $599,575 | Low, 1.0% under the second |
| 24 MAY 2017 | C000103725M01 | Fredericksburg | Turn lane extension rte. 301 | 2 of 3 | $354,821 | +1.0% |
| 24 MAY 2017 | CM517PMS110045 | Hampton Roads | Capital trail improvement project | 2 of 3 | $381,987 | +2.0% |
| 27 APR 2016 | CPM6G600107336B | Fredericksburg | 2016 plant mix | 1 of 2 | $1,187,482 | Low, 1.0% under the second |
| 23 MAR 2016 | C000107204N02 | Northern Virginia | E. holly ave sidewalk | 3 of 3 | $186,746 | +27% |
| 03 FEB 2016 | C0000107970N01 | Northern Virginia | 2016 plant mix ( volume 1 of 2 ) | 2 of 3 | $1,166,386 | +7.0% |
| 18 NOV 2015 | 0000C00107404 | Northern Virginia | On-call interstate asphalt patching | 3 of 3 | $1,361,056 | +77% |
| 26 FEB 2014 | C00105339N01 | Northern Virginia | Prince william incidental concrete repair | 3 of 3 | $369,952 | +25% |
| 22 JAN 2014 | C00105337N01 | Northern Virginia | Loudoun incidental concrete repair | 1 of 3 | $304,959 | Low, 16% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.