VDOT contract C0000126858N01 bid tabulation
On-call ada compliance curb ramp improvements. Let by Virginia DOT on March 25, 2026, Salem. 6 bids received; low bid $699,995 by Arthur Construction Co., Inc..
- Owner
- Virginia DOT
- Letting
- 25 MAR 2026
- Pay items
- 55
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Arthur Construction Co., Inc. | $699,995 | Low |
| 2 | S. C. Rossi & Company, Inc. | $773,347 | +10% |
| 3 | Finley Asphalt & Sealing, Inc. | $823,653 | +18% |
| 4 | Jones Road & Bridge, Inc. | $1,015,715 | +45% |
| 5 | North Construction, Inc. | $1,147,385 | +64% |
| 6 | Allegheny Construction Company, Inc. | $1,509,614 | +116% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Arthur Construction Co., Inc. | 2. S. C. Rossi & Company, Inc. | 3. Finley Asphalt & Sealing, Inc. | 4. Jones Road & Bridge, Inc. | 5. North Construction, Inc. | 6. Allegheny Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Regular excavation (303SD20-0001) | CY | 25 | $200.00 | $100.00 | $50.00 | $200.00 | $300.00 | $370.00 |
| 0001-0020 | Inlet protection type A (303SD20-0030) | EACH | 10 | $300.00 | $40.00 | $400.00 | $1,500.00 | $320.00 | $1,000.00 |
| 0001-0030 | Inlet protection type B (303SD20-0031) | EACH | 10 | $300.00 | $50.00 | $400.00 | $1,500.00 | $320.00 | $1,000.00 |
| 0001-0040 | Temp. silt fence type A (303SD20-0034) | LF | 500 | $5.00 | $7.00 | $10.00 | $10.00 | $45.00 | $12.00 |
| 0001-0050 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 200 | $95.00 | $55.00 | $60.00 | $100.00 | $100.00 | $150.00 |
| 0001-0060 | Asph. conc. TY. SM-9.5D maint (315SD20-0029) | TON | 10 | $475.00 | $250.00 | $1,000.00 | $1,000.00 | $300.00 | $1,000.00 |
| 0001-0070 | Asph. conc. TY. BM-25.0A maint (315SD20-0047) | TON | 10 | $450.00 | $250.00 | $1,000.00 | $1,000.00 | $300.00 | $1,000.00 |
| 0001-0080 | NS saw-cut asph conc (full depth) (315SX20-0011) | LF | 550 | $10.00 | $7.00 | $10.00 | $25.00 | $10.00 | $17.00 |
| 0001-0090 | Curb, STD. CG-2 (502SD20-0011) | LF | 330 | $125.00 | $60.00 | $106.00 | $200.00 | $120.00 | $340.00 |
| 0001-0100 | Curb, radial CG-2 (502SD20-0012) | LF | 330 | $125.00 | $70.00 | $106.00 | $200.00 | $120.00 | $340.00 |
| 0001-0110 | Curb, STD. CG-3 (502SD20-0014) | LF | 25 | $125.00 | $60.00 | $106.00 | $210.00 | $120.00 | $340.00 |
| 0001-0120 | Curb, radial CG-3 (502SD20-0015) | LF | 25 | $125.00 | $70.00 | $106.00 | $210.00 | $120.00 | $340.00 |
| 0001-0130 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 300 | $125.00 | $95.00 | $106.00 | $225.00 | $120.00 | $340.00 |
| 0001-0140 | Comb. curb & gutter, rad. CG-6 (502SD20-0023) | LF | 50 | $125.00 | $110.00 | $106.00 | $225.00 | $120.00 | $340.00 |
| 0001-0150 | Comb. curb & gutter, STD. CG-7 (502SD20-0024) | LF | 100 | $125.00 | $100.00 | $106.00 | $235.00 | $125.00 | $340.00 |
| 0001-0160 | Comb. curb & gutter, rad. CG-7 (502SD20-0025) | LF | 50 | $125.00 | $120.00 | $106.00 | $235.00 | $125.00 | $340.00 |
| 0001-0170 | Entrance gutter CG-9D (502SD20-0029) | SY | 50 | $270.00 | $400.00 | $346.00 | $350.00 | $130.00 | $850.00 |
| 0001-0180 | Entrance gutter CG-13 (502SD20-0031) | SY | 50 | $270.00 | $400.00 | $346.00 | $300.00 | $130.00 | $1,000.00 |
| 0001-0190 | NS saw cut H.C.C. items (full depth) (502SX20-0010) | LF | 250 | $10.00 | $8.00 | $10.00 | $40.00 | $10.00 | $65.00 |
| 0001-0200 | Concrete class A3 misc. (504SD20-0001) | CY | 25 | $2,000.00 | $400.00 | $1,500.00 | $3,500.00 | $1,000.00 | $2,700.00 |
| 0001-0210 | CG-12 detectable warning surface (504SD20-0002) | SY | 100 | $450.00 | $900.00 | $250.00 | $2,500.00 | $800.00 | $1,200.00 |
| 0001-0220 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 450 | $180.00 | $270.00 | $146.00 | $155.00 | $150.00 | $300.00 |
| 0001-0230 | Hydr. cement conc. sidewalk 7" (504SD20-0004) | SY | 25 | $225.00 | $360.00 | $346.00 | $225.00 | $200.00 | $470.00 |
| 0001-0240 | Reinforcing steel miscellaneous (504SD20-0011) | LB | 50 | $50.00 | $20.00 | $2.00 | $15.00 | $10.00 | $12.00 |
| 0001-0250 | High visibility fence, 4 feet (507SD20-0027) | LF | 50 | $10.00 | $8.00 | $25.00 | $8.00 | $4,950.00 | $8.00 |
| 0001-0260 | Remove sidewalk and entrance (510SX20-0001) | SY | 150 | $72.00 | $5.00 | $45.00 | $35.00 | $140.00 | $170.00 |
| 0001-0270 | Remove comb. curb and gutter (510SX20-0002) | LF | 300 | $75.00 | $3.00 | $15.00 | $50.00 | $80.00 | $100.00 |
| 0001-0280 | Type 3 barricade 4' (512SD20-0012) | EACH | 25 | $1,000.00 | $25.00 | $500.00 | $500.00 | $1,000.00 | $550.00 |
| 0001-0290 | Temporary sign (512SD20-0014) | SF | 96 | $50.00 | $25.00 | $58.00 | $35.00 | $10.00 | $40.00 |
| 0001-0300 | Aggregate material no. 25 or 26 (512SD20-0015) | TON | 200 | $95.00 | $30.00 | $60.00 | $80.00 | $100.00 | $140.00 |
| 0001-0310 | Temporary curb ramp (512SD20-0016) | EACH | 25 | $500.00 | $100.00 | $5,000.00 | $1,000.00 | $1,000.00 | $3,600.00 |
| 0001-0320 | Temporary detectable warning surface (512SD20-0017) | LF | 100 | $100.00 | $87.00 | $150.00 | $200.00 | $245.00 | $800.00 |
| 0001-0330 | Pedestrian barricade device (512SD20-0018) | LF | 150 | $50.00 | $9.00 | $25.00 | $200.00 | $150.00 | $200.00 |
| 0001-0340 | Truck mounted attenuator (512SD20-0023) | HR | 100 | $25.00 | $100.00 | $100.00 | $40.00 | $50.00 | $130.00 |
| 0001-0350 | Group 2 channelizing devices (512SD20-0024) | DAY | 100 | $150.00 | $125.00 | $10.00 | $5.00 | $5.00 | $3.00 |
| 0001-0360 | Port.changeable mess. sign (512SD20-0025) | HR | 250 | $10.00 | $50.00 | $41.00 | $8.00 | $12.00 | $25.00 |
| 0001-0370 | Electronic arrow board (512SD20-0026) | HR | 200 | $10.00 | $50.00 | $15.00 | $7.00 | $10.00 | $20.00 |
| 0001-0380 | Flagger service (512SD20-0027) | HR | 1,150 | $50.00 | $100.00 | $69.00 | $10.00 | $80.00 | $50.00 |
| 0001-0390 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 1,750 | $5.00 | $30.00 | $28.00 | $4.00 | $30.00 | $30.00 |
| 0001-0400 | Portable temporary rumble strip array (512SP20-0001) | DAY | 100 | $50.00 | $600.00 | $300.00 | $200.00 | $150.00 | $200.00 |
| 0001-0410 | Topsoil class B (602SD20-0004) | CY | 5 | $125.00 | $125.00 | $100.00 | $200.00 | $500.00 | $500.00 |
| 0001-0420 | Regular seed (603SD20-0003) | LB | 25 | $100.00 | $10.00 | $60.00 | $20.00 | $45.00 | $30.00 |
| 0001-0430 | Overseeding (603SD20-0004) | LB | 25 | $25.00 | $10.00 | $60.00 | $20.00 | $50.00 | $22.00 |
| 0001-0440 | Legume seed (603SD20-0005) | LB | 25 | $100.00 | $4.00 | $60.00 | $20.00 | $50.00 | $55.00 |
| 0001-0450 | Legume overseeding (603SD20-0006) | LB | 25 | $25.00 | $4.00 | $60.00 | $20.00 | $50.00 | $55.00 |
| 0001-0460 | Fertilizer nitrogen - N (603SD20-0014) | LB | 19 | $25.00 | $6.00 | $60.00 | $5.00 | $50.00 | $4.00 |
| 0001-0470 | Fertilizer phosphorous - P (603SD20-0015) | LB | 38 | $25.00 | $8.00 | $60.00 | $5.00 | $50.00 | $4.00 |
| 0001-0480 | Fertilizer potassium - K (603SD20-0016) | LB | 19 | $25.00 | $16.00 | $60.00 | $5.00 | $50.00 | $4.00 |
| 0001-0490 | Lime (603SD20-0017) | TON | 1 | $1,000.00 | $225.00 | $575.00 | $400.00 | $300.00 | $400.00 |
| 0001-0500 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 30 | $75.00 | $50.00 | $52.00 | $40.00 | $4,000.00 | $54.00 |
| 0001-0510 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 5 | $1,199.00 | $1,750.00 | $2,020.00 | $550.00 | $200.00 | $2,100.00 |
| 0001-0520 | Sign panel (701SD20-0001) | SF | 60 | $75.00 | $55.00 | $58.00 | $35.00 | $110.00 | $60.00 |
| 0001-0530 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 200 | $20.00 | $30.00 | $34.00 | $10.00 | $10.00 | $40.00 |
| 0001-0540 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 800 | $30.00 | $30.00 | $34.00 | $12.00 | $10.00 | $40.00 |
| 0001-0550 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 700 | $45.00 | $50.00 | $57.00 | $20.00 | $15.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.