VDOT contract C0000113851B01 bid tabulation
Sgr - bridge replacement. Let by Virginia DOT on February 4, 2026, Stafford, Fredericksburg. 8 bids received; low bid $3,819,769 by WG Construction Co., Inc..
- Owner
- Virginia DOT
- Letting
- 04 FEB 2026
- Pay items
- 68
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | WG Construction Co., Inc. | $3,819,769 | Low |
| 2 | Freyssinet, Inc. | $3,879,674 | +2.0% |
| 3 | Allan Myers Va, Inc. | $4,037,777 | +6.0% |
| 4 | Branch Civil, Inc. | $4,205,185 | +10% |
| 5 | Fort Myer Construction Corporation | $4,477,731 | +17% |
| 6 | Sagres Construction Corporation | $4,919,165 | +29% |
| 7 | Archer Western Construction, LLC | $5,310,702 | +39% |
| 8 | FLB Contractors, Inc. | $5,661,949 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. WG Construction Co., Inc. | 2. Freyssinet, Inc. | 3. Allan Myers Va, Inc. | 4. Branch Civil, Inc. | 5. Fort Myer Construction Corporation | 6. Sagres Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $50,000 | $13,300 | $175,000 | $13,700 | $53,000 | $77,000 |
| 0001-0020 | Regular excavation (303SD20-0001) | CY | 1,286 | $77.00 | $14.00 | $50.00 | $49.50 | $80.00 | $65.00 |
| 0001-0030 | Geotextile embankment stab. (303SD20-0013) | SY | 445 | $10.00 | $8.50 | $5.00 | $4.90 | $12.00 | $7.04 |
| 0001-0040 | Erosion control mulch (303SD20-0019) | SY | 5 | $20.00 | $91.00 | $15.00 | $5.50 | $100.00 | $200.31 |
| 0001-0050 | Check dam rock TY. II (303SD20-0023) | EACH | 6 | $1,325.00 | $1,610.00 | $2,500.00 | $782.50 | $550.00 | $1,200.95 |
| 0001-0060 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $1,620.00 | $2,900.00 | $2,549.94 | $6,687.00 | $2,500.00 | $146,187 |
| 0001-0070 | Siltation control excavation (303SD20-0029) | CY | 179 | $65.00 | $150.00 | $1.00 | $38.00 | $1.00 | $25.00 |
| 0001-0080 | Temp. silt fence type A (303SD20-0034) | LF | 992 | $10.00 | $8.00 | $10.00 | $4.35 | $13.00 | $6.10 |
| 0001-0090 | Borrow excavation (305SD20-0001) | CY | 718 | $91.00 | $14.00 | $60.00 | $44.75 | $80.00 | $95.00 |
| 0001-0100 | NS aggregate material no.3 (305SX20-0002) | TON | 168 | $109.00 | $42.00 | $85.00 | $53.25 | $90.00 | $70.40 |
| 0001-0110 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 1,200 | $85.00 | $42.00 | $65.00 | $59.25 | $90.00 | $54.89 |
| 0001-0120 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 220 | $153.00 | $285.00 | $150.00 | $169.00 | $195.50 | $211.66 |
| 0001-0130 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 200 | $138.50 | $210.00 | $160.00 | $152.00 | $144.90 | $199.90 |
| 0001-0140 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 290 | $118.00 | $220.00 | $135.00 | $130.00 | $151.80 | $188.14 |
| 0001-0150 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 41 | $35.00 | $67.00 | $20.00 | $39.00 | $35.00 | $7.06 |
| 0001-0160 | Structure excavation const. (401SD20-0001) | CY | 2,508 | $101.50 | $14.00 | $75.00 | $122.00 | $95.00 | $70.00 |
| 0001-0170 | Select backfill abutment zone (401SD20-0002) | TON | 2,312 | $78.00 | $14.00 | $43.00 | $43.00 | $80.00 | $66.38 |
| 0001-0180 | Geocomposite wall drain (401SD20-0004) | SY | 200 | $32.50 | $42.00 | $30.00 | $51.50 | $30.00 | $100.68 |
| 0001-0190 | Pipe underdrain 6" const. (401SD20-0005) | LF | 150 | $15.00 | $18.00 | $25.00 | $27.00 | $15.00 | $53.67 |
| 0001-0200 | Cofferdam (401SD20-0007) | EACH | 2 | $84,850 | $88,000 | $90,000 | $82,250 | $145,000 | $329,421 |
| 0001-0210 | Steel piles 12" (403SD20-0006) | LF | 823 | $187.00 | $140.00 | $108.00 | $117.50 | $244.02 | $218.21 |
| 0001-0220 | NS preboring pile 24" (for 12" steel pile) (403SX20-0016) | LF | 769 | $415.00 | $1,050.00 | $510.00 | $725.00 | $410.40 | $876.79 |
| 0001-0230 | Conc. CL. A4 mod. low shrink., SPR. struct. const. (404SD20-0005) | CY | 110.70 | $704.00 | $1,250.00 | $900.00 | $1,390.00 | $1,373.00 | $3,000.00 |
| 0001-0240 | Bridge deck grooving const. (404SD20-0009) | SY | 416 | $23.00 | $15.00 | $7.00 | $20.50 | $25.79 | $15.00 |
| 0001-0250 | Cover depth survey const. (404SD20-0010) | SY | 416 | $12.00 | $28.00 | $7.00 | $9.00 | $9.45 | $14.11 |
| 0001-0260 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 322.20 | $955.00 | $1,040.00 | $1,150.00 | $1,720.00 | $1,300.00 | $1,200.00 |
| 0001-0270 | VA adjacent member conn. block-outs (404SP20-0003) | CF | 267 | $131.00 | $630.00 | $500.00 | $548.00 | $545.00 | $233.94 |
| 0001-0280 | NS prestressed concrete slab 3' X 18" X (+50'-55') (405SX20-0004) | EACH | 24 | $21,550 | $29,700 | $17,000 | $24,000 | $22,100 | $20,930 |
| 0001-0290 | CR reinf. steel CL. I SPR. struct. const. (406SD20-0003) | LB | 10,850 | $4.00 | $4.50 | $2.65 | $3.60 | $3.00 | $3.00 |
| 0001-0300 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 34,310 | $3.70 | $5.00 | $2.65 | $3.70 | $3.00 | $3.00 |
| 0001-0310 | Railing CPSR 2 rail const. (410SD20-0011) | LF | 220 | $500.00 | $375.00 | $300.00 | $673.50 | $610.00 | $276.69 |
| 0001-0320 | NS bridge incidentals dismantle and remove temporary bridge (410SX20-0014) | LS | 1 | $100,000 | $80,600 | $350,000 | $125,120 | $105,000 | $50,829 |
| 0001-0330 | NS dism. & rem. exist. STR. dismantle existing structure (VA 089-6022) (413SX20-0002) | LS | 1 | $115,000 | $16,600 | $300,000 | $155,600 | $250,000 | $100,000 |
| 0001-0340 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 11 | $435.00 | $160.00 | $200.00 | $128.00 | $250.00 | $121.85 |
| 0001-0350 | NS riprap dry riprap CL.I. 26'' PG-3 (414SX20-0007) | TON | 276 | $205.00 | $63.00 | $160.00 | $121.50 | $245.00 | $137.06 |
| 0001-0360 | NS riprap dry riprap CL.I. 26" bridge installation (414SX20-0007) | TON | 316 | $205.00 | $63.00 | $160.00 | $131.50 | $245.00 | $137.06 |
| 0001-0370 | NS nbis access, under bridge inspection (430SX20-0001) | DAY | 1 | $1,000.00 | $2,640.00 | $2,000.00 | $4,426.00 | $7,500.00 | $3,116.14 |
| 0001-0380 | Curb, STD. CG-3 (502SD20-0014) | LF | 100 | $22.50 | $33.00 | $80.00 | $176.00 | $70.00 | $47.04 |
| 0001-0390 | Guardrail GR-MGS1 (505SD20-0011) | LF | 200 | $49.00 | $59.00 | $35.00 | $33.50 | $34.50 | $43.35 |
| 0001-0400 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 4 | $4,500.00 | $5,530.00 | $3,500.00 | $3,875.00 | $4,025.00 | $4,058.18 |
| 0001-0410 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 4 | $6,000.00 | $7,370.00 | $3,500.00 | $3,875.00 | $4,025.00 | $5,410.91 |
| 0001-0420 | Demo. of pavement flexible (508SD20-0004) | SY | 1,220 | $22.00 | $25.00 | $18.00 | $17.50 | $21.21 | $14.93 |
| 0001-0430 | Type 3 barricade 8' (512SD20-0013) | EACH | 12 | $458.00 | $555.00 | $1,000.00 | $405.00 | $550.00 | $124.65 |
| 0001-0440 | Temporary sign (512SD20-0014) | SF | 500 | $60.00 | $74.00 | $95.00 | $27.60 | $18.00 | $31.16 |
| 0001-0460 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 40 | $120.00 | $145.00 | $75.00 | $11.00 | $11.50 | $11.76 |
| 0001-0465 | NS maintenance of traffic MOT (512SP20-0002) | LS | 1 | $6,500.00 | $5,000.00 | $5,000.00 | $45,975 | $60,000 | $58,795 |
| 0001-0470 | Mobilization (513SD20-0001) | LS | 1 | $220,000 | $225,000 | $200,000 | $151,059 | $240,000 | $250,000 |
| 0001-0480 | Field office TY.III (514SD20-0003) | MO | 14 | $5,000.00 | $2,930.00 | $2,800.00 | $4,015.00 | $4,500.00 | $5,000.00 |
| 0001-0490 | Construction surveying constr. (517SD20-0001) | LS | 1 | $37,500 | $41,900 | $40,000 | $40,500 | $48,000 | $21,343 |
| 0001-0500 | Topsoil class B 2" (602SD20-0003) | ACRE | 0.20 | $55,000 | $19,300 | $25,000 | $47,960 | $44,528 | $25,000 |
| 0001-0510 | Temporary seed (603SD20-0002) | LB | 60 | $34.00 | $18.00 | $50.00 | $4.40 | $40.25 | $14.39 |
| 0001-0520 | Regular seed (603SD20-0003) | LB | 113 | $28.00 | $17.00 | $50.00 | $6.60 | $97.75 | $18.65 |
| 0001-0530 | Overseeding (603SD20-0004) | LB | 90 | $33.00 | $17.00 | $50.00 | $4.40 | $40.25 | $9.71 |
| 0001-0540 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 3,025 | $2.20 | $2.50 | $2.00 | $0.93 | $3.16 | $0.68 |
| 0001-0550 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 3,509 | $2.40 | $2.50 | $2.00 | $1.05 | $3.45 | $0.92 |
| 0001-0560 | Fertilizer nitrogen - N (603SD20-0014) | LB | 92 | $5.60 | $13.00 | $10.00 | $6.00 | $28.75 | $5.88 |
| 0001-0570 | Fertilizer phosphorous - P (603SD20-0015) | LB | 42 | $5.60 | $14.00 | $10.00 | $6.00 | $28.75 | $5.88 |
| 0001-0580 | Fertilizer potassium - K (603SD20-0016) | LB | 42 | $5.60 | $14.00 | $10.00 | $6.00 | $28.75 | $5.88 |
| 0001-0590 | Lime (603SD20-0017) | TON | 3.30 | $671.00 | $290.00 | $400.00 | $155.00 | $345.00 | $305.74 |
| 0001-0600 | NS landscape special provision for nontidal wetland temporary impact restoration (605SX20-0013) | LS | 1 | $110,400 | $42,900 | $35,000 | $13,215 | $43,198 | $23,518 |
| 0001-0610 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 288 | $6.50 | $10.00 | $10.00 | $2.00 | $8.05 | $7.58 |
| 0001-0620 | Rolled erosion CTRL product EC-3 type 1 (606SD20-0005) | SY | 208 | $14.00 | $10.00 | $15.00 | $5.00 | $17.25 | $7.59 |
| 0001-0630 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 21 | $350.00 | $280.00 | $500.00 | $185.00 | $450.00 | $195.99 |
| 0001-0640 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 20 | $34.00 | $34.00 | $40.00 | $27.50 | $55.00 | $29.40 |
| 0001-0650 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 2 | $2,000.00 | $2,510.00 | $1,200.00 | $1,670.00 | $2,500.00 | $1,763.86 |
| 0001-0660 | NS traffic signalization remove and salvage temporary signal (700SX20-0008) | LS | 1 | $60,000 | $5,350.00 | $104,522 | $84,690 | $95,000 | $15,000 |
| 0001-0670 | Sign panel (701SD20-0001) | SF | 6 | $65.00 | $79.00 | $125.00 | $52.30 | $55.00 | $55.47 |
| 0001-0680 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 3,100 | $3.00 | $3.50 | $3.00 | $1.38 | $1.44 | $1.47 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.