Branch Civil, Inc.: VDOT bid record
Branch Civil, Inc. submitted 13 bids on Virginia DOT contracts in the data, from 26 APR 2017 to 22 JUL 2026, and was the low bidder on 6 of them (46%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $363,924,696
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 3 | 1 | 33% |
| 2018 | 2 | 0 | 0% |
| 2019 | 2 | 1 | 50% |
| 2020 | 1 | 1 | 100% |
| 2026 | 5 | 3 | 60% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 6 | 5 | 83% |
| Staunton | 3 | 0 | 0% |
| Hampton Roads | 2 | 1 | 50% |
| Fredericksburg | 1 | 0 | 0% |
| Bristol | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temp. silt fence type A | 303SD20-0034 | LF | 11 | 7 (64%) | $3.35 | $3.00 |
| Inlet protection type A | 303SD20-0030 | EACH | 10 | 7 (70%) | $198.00 | $300.00 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 16 | 5 (31%) | $3,500.00 | $2,000.00 |
| Temporary sign | 512SD20-0014 | SF | 11 | 5 (45%) | $21.70 | $20.00 |
| Dewatering basin EC-8 | 303SD20-0028 | EACH | 8 | 5 (63%) | $699.12 | $1,000.00 |
| Outlet pipe | 501SD20-0009 | LF | 6 | 5 (83%) | $19.07 | $19.45 |
| Regular excavation | 303SD20-0001 | CY | 11 | 4 (36%) | $30.27 | $31.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 10 | 4 (40%) | $4.62 | $8.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 9 | 4 (44%) | $8.30 | $9.00 |
| Manhole MH-1 or 2 | 302SD20-0662 | LF | 9 | 4 (44%) | $950.00 | $614.55 |
| Frame & cover MH-1 | 302SD20-0663 | EACH | 8 | 4 (50%) | $656.00 | $525.00 |
| Underdrain UD-4 | 501SD20-0004 | LF | 6 | 4 (67%) | $12.20 | $12.46 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Archer Western Construction, LLC | 2 | 0 of 2 |
| Haymes Brothers, Inc. | 2 | 0 of 2 |
| Jones Road & Bridge, Inc. | 2 | 0 of 2 |
| A & J Development and Excavation, Inc. | 2 | 1 of 2 |
| Branscome Inc. | 2 | 1 of 2 |
| WG Construction Co., Inc. | 1 | 1 of 1 |
| Freyssinet, Inc. | 1 | 1 of 1 |
| Allan Myers Va, Inc. | 1 | 1 of 1 |
| Fort Myer Construction Corporation | 1 | 0 of 1 |
| Sagres Construction Corporation | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000120611C01 | Salem | Smart scale* - intersection improvements | 1 of 1 | $21,585,000 | Low |
| 24 JUN 2026 | C0000108810C01 | Staunton | Smart scale - road widening and int. realignment | 2 of 2 | $22,147,585 | +21% |
| 27 MAY 2026 | C0000119458C01 | Salem | Smart scale - roundabout | 1 of 6 | $7,803,585 | Low, 11% under the second |
| 27 MAY 2026 | C0000115456C01 | Salem | Smart scale - int. improvements / acceleration lane | 1 of 4 | $3,417,885 | Low, 13% under the second |
| 04 FEB 2026 | C0000113851B01 | Fredericksburg | Sgr - bridge replacement | 4 of 8 | $4,205,185 | +10% |
| 06 NOV 2020 | C000017536DB20 | Salem | Rt58 -corridor dev prog - 4 lanes (lovers leap) design build | 1 of 1 | $300,000,000 | Low |
| 18 DEC 2019 | C0000108906C01 | Salem | Smart scale*-auxiliary lane additions & interstate paving | 1 of 2 | $27,285,010 | Low, 19% under the second |
| 24 JUL 2019 | C0000100921C01 | Hampton Roads | Smart scale* - roadway widening | 2 of 3 | $11,071,580 | +8.0% |
| 19 DEC 2018 | C000059259M01 | Staunton | Smart scale* - intersection reconstruction | 3 of 3 | $6,785,879 | +27% |
| 28 MAR 2018 | C0000008753C01 | Salem | Smart scale - widen to 3 lanes with curb & sidewalk | 2 of 3 | $8,758,572 | +4.0% |
| 26 JUL 2017 | C0000103320C01 | Bristol | Add auxiliary merging lane along i-77n at i-81 interchange | 3 of 3 | $5,840,832 | +19% |
| 21 JUN 2017 | C0000080272M01 | Staunton | Road improvements on rte. 610 at intersection w/ rte. 912 | 2 of 3 | $2,858,385 | +17% |
| 26 APR 2017 | C0000107044C01 | Hampton Roads | Interchange modification at i-64 / northampton blvd. | 1 of 3 | $3,833,216 | Low, 10% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.