VDOT contract C0000128987B24 bid tabulation
Bridge scour rehabilitation. Let by Virginia DOT on October 28, 2026, Caroline, King George, Fredericksburg. 3 bids received; low bid $1,095,791 by Independence Excavating, Inc..
- Owner
- Virginia DOT
- Letting
- 28 OCT 2026
- Pay items
- 30
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Independence Excavating, Inc. | $1,095,791 | Low |
| 2 | Otb Associates LLC | $1,439,660 | +31% |
| 3 | Howard Brothers Contractor, Inc. | $1,593,465 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Independence Excavating, Inc. | 2. Otb Associates LLC | 3. Howard Brothers Contractor, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Grading (303SD20-0004) | LS | 1 | $300,000 | $100,000 | $355,765 |
| 0001-0020 | Dewatering basin EC-8 (303SD20-0028) | EACH | 4 | $1,000.00 | $10,000 | $250.00 |
| 0001-0030 | Siltation control excavation (303SD20-0029) | CY | 148 | $340.00 | $115.00 | $0.01 |
| 0001-0040 | Temp. silt fence type A (303SD20-0034) | LF | 780 | $10.00 | $20.00 | $3.25 |
| 0001-0050 | NS excavation temporary stream diversion (303SX20-0004) | LS | 1 | $35,000 | $110,000 | $145,000 |
| 0001-0060 | Crusher run aggr. no. 25 or 26 (308SX20-0003) | TON | 152 | $200.00 | $250.00 | $36.30 |
| 0001-0070 | Cofferdam (401SD20-0007) | EACH | 6 | $25,000 | $65,000 | $80,000 |
| 0001-0080 | NS concrete hydraulic cement grout (404SX20-0004) | CY | 11 | $8,800.00 | $9,000.00 | $2,227.27 |
| 0001-0090 | Dry riprap CL.I 26" (414SD20-0012) | TON | 791 | $240.00 | $180.00 | $267.02 |
| 0001-0100 | Traffic barrier service MB-11A (512SD20-0003) | LF | 965 | $70.00 | $160.00 | $63.00 |
| 0001-0110 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 2 | $8,000.00 | $12,000 | $12,500 |
| 0001-0120 | Type 3 barricade 8' (512SD20-0013) | EACH | 10 | $100.00 | $400.00 | $400.00 |
| 0001-0130 | Temporary sign (512SD20-0014) | SF | 587 | $10.00 | $25.00 | $22.00 |
| 0001-0140 | Truck mounted attenuator (512SD20-0023) | HR | 32 | $75.00 | $60.00 | $0.01 |
| 0001-0150 | Group 2 channelizing devices (512SD20-0024) | DAY | 3,060 | $0.25 | $2.50 | $1.50 |
| 0001-0160 | Port.changeable mess. sign (512SD20-0025) | HR | 1,440 | $4.00 | $7.50 | $3.00 |
| 0001-0170 | Electronic arrow board (512SD20-0026) | HR | 1,440 | $2.00 | $3.50 | $2.00 |
| 0001-0180 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 480 | $4.00 | $10.00 | $3.30 |
| 0001-0190 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 1,105 | $3.00 | $10.00 | $3.20 |
| 0001-0200 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 2,600 | $5.00 | $10.00 | $3.50 |
| 0001-0210 | Mobilization (513SD20-0001) | LS | 1 | $85,000 | $100,000 | $105,000 |
| 0001-0220 | Construction surveying min. plan (517SD20-0002) | LS | 1 | $12,000 | $20,000 | $130,000 |
| 0001-0230 | Topsoil class A 2" (602SD20-0005) | ACRE | 1 | $3,000.00 | $80,000 | $2,500.00 |
| 0001-0240 | Temporary seed (603SD20-0002) | LB | 101 | $8.00 | $15.00 | $0.50 |
| 0001-0250 | Regular seed (603SD20-0003) | LB | 279 | $12.00 | $15.00 | $4.00 |
| 0001-0260 | Overseeding (603SD20-0004) | LB | 223 | $11.00 | $15.00 | $0.50 |
| 0001-0270 | Fertilizer nitrogen - N (603SD20-0014) | LB | 155 | $6.00 | $20.00 | $1.00 |
| 0001-0280 | Fertilizer phosphorous - P (603SD20-0015) | LB | 71 | $6.00 | $20.00 | $1.00 |
| 0001-0290 | Fertilizer potassium - K (603SD20-0016) | LB | 71 | $6.00 | $20.00 | $1.00 |
| 0001-0300 | Lime (603SD20-0017) | TON | 5.56 | $500.00 | $1,500.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of October 28, 2026. Compiled by Mirage Metrics.