VDOT contract C0000119111C01 bid tabulation
Smart scale - r-cut road improvement. Let by Virginia DOT on November 19, 2025, Richmond, Fredericksburg. 5 bids received; low bid $1,725,679 by Posillico Civil, Inc..
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 83
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Posillico Civil, Inc. | $1,725,679 | Low |
| 2 | J. R. Caskey, Inc. | $1,897,105 | +10% |
| 3 | Sagres Construction Corporation | $2,221,611 | +29% |
| 4 | BRANSCOME OPERATING, LLC dba BRANSCOME | $2,399,994 | +39% |
| 5 | North Construction, Inc. | $2,697,915 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Posillico Civil, Inc. | 2. J. R. Caskey, Inc. | 3. Sagres Construction Corporation | 4. BRANSCOME OPERATING, LLC dba BRANSCOME | 5. North Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0002) | ACRE | 0.95 | $50,000 | $3,125.68 | $22,000 | $60,000 | $60,000 |
| 0001-0020 | Reinf. steel (302SD20-0005) | LB | 546 | $3.02 | $0.01 | $4.00 | $4.27 | $10.00 |
| 0001-0030 | 15" pipe (302SD20-0023) | LF | 60 | $200.00 | $175.00 | $450.00 | $215.62 | $350.00 |
| 0001-0040 | 15" storm sewer pipe (302SD20-0027) | LF | 110 | $250.00 | $165.00 | $450.00 | $369.78 | $350.00 |
| 0001-0050 | 18" storm sewer pipe (302SD20-0032) | LF | 142 | $425.00 | $354.00 | $450.00 | $477.86 | $400.00 |
| 0001-0060 | 24" pipe (302SD20-0037) | LF | 215 | $450.00 | $357.00 | $550.00 | $542.55 | $400.00 |
| 0001-0070 | 15" end section ES-1 or 2 (302SD20-0198) | EACH | 3 | $5,500.00 | $2,000.00 | $2,000.00 | $5,095.44 | $3,500.00 |
| 0001-0080 | 18" end section ES-1 or 2 (302SD20-0200) | EACH | 1 | $5,500.00 | $2,500.00 | $2,500.00 | $4,591.52 | $3,500.00 |
| 0001-0090 | 24" end section ES-1 or 2 (302SD20-0204) | EACH | 6 | $7,000.00 | $3,000.00 | $2,600.00 | $4,567.58 | $3,800.00 |
| 0001-0100 | Drop inlet DI-7 (302SD20-0447) | EACH | 1 | $12,000 | $124,800 | $10,000 | $13,399 | $10,000 |
| 0001-0110 | Regular excavation (303SD20-0001) | CY | 1,647 | $105.00 | $110.00 | $65.00 | $122.59 | $160.00 |
| 0001-0120 | Borrow excavation (303SD20-0007) | CY | 68 | $125.00 | $50.00 | $70.00 | $147.67 | $250.00 |
| 0001-0130 | Erosion control mulch (303SD20-0019) | SY | 5 | $50.00 | $65.00 | $80.00 | $274.98 | $70.00 |
| 0001-0140 | Check dam rock TY. I (303SD20-0022) | EACH | 4 | $750.00 | $1,227.00 | $430.00 | $2,365.73 | $1,000.00 |
| 0001-0150 | Check dam rock TY. II (303SD20-0023) | EACH | 7 | $500.00 | $648.00 | $430.00 | $1,680.20 | $1,000.00 |
| 0001-0160 | Siltation control excavation (303SD20-0029) | CY | 307 | $80.00 | $1.00 | $15.00 | $57.04 | $5.00 |
| 0001-0170 | Inlet protection type A (303SD20-0030) | EACH | 2 | $500.00 | $890.00 | $180.00 | $728.71 | $600.00 |
| 0001-0180 | Temp. silt fence type A (303SD20-0034) | LF | 1,501 | $12.00 | $9.00 | $5.00 | $20.98 | $11.00 |
| 0001-0190 | Storm water man. basin excav. (303SD20-0036) | CY | 450 | $130.00 | $81.00 | $65.00 | $105.42 | $200.00 |
| 0001-0200 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 2,067 | $130.00 | $81.00 | $100.00 | $82.41 | $80.00 |
| 0001-0210 | Asphalt concrete TY. SM- 12.5D const (315SD20-0002) | TON | 751 | $150.00 | $229.00 | $280.00 | $257.63 | $270.00 |
| 0001-0220 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 654 | $140.00 | $206.00 | $280.00 | $248.19 | $270.00 |
| 0001-0230 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 423 | $135.00 | $207.00 | $280.00 | $236.31 | $270.00 |
| 0001-0240 | Rumble strip sinusoidal asphalt (315SD20-0052) | LF | 1,867 | $8.00 | $10.00 | $10.00 | $12.81 | $10.00 |
| 0001-0250 | NS saw-cut asph conc saw-cut asph conc (315SX20-0011) | LF | 1,153 | $6.00 | $15.00 | $10.00 | $7.12 | $5.00 |
| 0001-0260 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 11 | $100.00 | $500.00 | $125.00 | $508.62 | $200.00 |
| 0001-0270 | Dry riprap CL.I 26" (414SD20-0012) | TON | 19 | $200.00 | $500.00 | $125.00 | $348.52 | $250.00 |
| 0001-0280 | Underdrain UD-4 (501SD20-0004) | LF | 284 | $35.00 | $50.00 | $60.00 | $54.49 | $50.00 |
| 0001-0290 | Outlet pipe (501SD20-0009) | LF | 12 | $125.00 | $65.00 | $60.00 | $212.60 | $50.00 |
| 0001-0300 | Paved ditch PG-2A (502SD20-0003) | SY | 16 | $200.00 | $376.00 | $600.00 | $213.53 | $250.00 |
| 0001-0310 | Comb. curb & gutter, STD. CG-7 (502SD20-0024) | LF | 147 | $70.00 | $105.00 | $150.00 | $74.02 | $80.00 |
| 0001-0320 | Comb. curb & gutter, rad. CG-7 (502SD20-0025) | LF | 117 | $65.00 | $105.00 | $150.00 | $71.18 | $80.00 |
| 0001-0330 | Entrance gutter CG-13 (502SD20-0031) | SY | 50 | $250.00 | $336.00 | $420.00 | $213.53 | $300.00 |
| 0001-0340 | R/W monument RM-2 (503SD20-0002) | EACH | 12 | $250.00 | $175.00 | $250.00 | $977.45 | $500.00 |
| 0001-0350 | Concrete class A3 misc. (504SD20-0001) | CY | 6.70 | $1,500.00 | $3,932.00 | $2,900.00 | $1,779.43 | $1,000.00 |
| 0001-0360 | High visibility fence, 4 feet (507SD20-0027) | LF | 935 | $10.00 | $6.00 | $10.00 | $8.26 | $15.00 |
| 0001-0370 | Obscuring roadway (508SD20-0001) | UNIT | 3.20 | $12,000 | $3,000.00 | $3,500.00 | $5,920.98 | $20,000 |
| 0001-0380 | Demo. of pavement flexible (508SD20-0004) | SY | 123 | $75.00 | $96.00 | $25.00 | $41.97 | $40.00 |
| 0001-0390 | Flowable backfill (509SD20-0001) | CY | 4.70 | $690.70 | $2,327.00 | $250.00 | $2,495.14 | $800.00 |
| 0001-0400 | Allaying dust (511SD20-0001) | HR | 200 | $5.00 | $1.00 | $10.00 | $145.57 | $80.00 |
| 0001-0410 | Temporary sign (512SD20-0014) | SF | 648 | $25.00 | $60.00 | $25.00 | $71.98 | $2.00 |
| 0001-0420 | Truck mounted attenuator (512SD20-0023) | HR | 4,000 | $5.00 | $17.00 | $10.00 | $43.76 | $50.00 |
| 0001-0430 | Group 2 channelizing devices (512SD20-0024) | DAY | 22,456 | $0.50 | $1.00 | $1.00 | $0.79 | $3.00 |
| 0001-0440 | Port.changeable mess. sign (512SD20-0025) | HR | 1,680 | $2.50 | $7.00 | $3.00 | $9.78 | $20.00 |
| 0001-0450 | Electronic arrow board (512SD20-0026) | HR | 4,000 | $4.00 | $3.00 | $5.00 | $9.78 | $10.00 |
| 0001-0460 | Flagger service (512SD20-0027) | HR | 200 | $45.00 | $45.00 | $30.00 | $95.10 | $65.00 |
| 0001-0470 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 835 | $3.45 | $12.00 | $5.00 | $3.54 | $10.00 |
| 0001-0480 | Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061) | LF | 6,323 | $1.50 | $5.00 | $4.00 | $3.26 | $6.00 |
| 0001-0490 | Portable temporary rumble strip array (512SP20-0001) | DAY | 21 | $69.39 | $238.00 | $87.00 | $177.94 | $600.00 |
| 0001-0500 | Mobilization (513SD20-0001) | LS | 1 | $115,000 | $125,000 | $140,000 | $173,250 | $120,000 |
| 0001-0510 | Field office TY.III (514SD20-0003) | MO | 7 | $3,000.00 | $5,000.00 | $9,000.00 | $7,500.00 | $20,000 |
| 0001-0520 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 889 | $12.00 | $11.00 | $25.00 | $16.19 | $15.00 |
| 0001-0530 | Flexible pave. planing above 2"-4" (515SD20-0005) | SY | 3,924 | $15.00 | $11.00 | $30.00 | $21.39 | $18.00 |
| 0001-0540 | Construction surveying constr. (517SD20-0001) | LS | 1 | $30,000 | $35,000 | $50,000 | $50,000 | $100,000 |
| 0001-0550 | NS storm water management construction record documents (523SP20-0005) | LS | 1 | $7,500.00 | $7,500.00 | $50,000 | $12,000 | $15,000 |
| 0001-0560 | Topsoil class B (602SD20-0004) | CY | 176 | $100.00 | $193.00 | $110.00 | $123.52 | $140.00 |
| 0001-0570 | Temporary seed (603SD20-0002) | LB | 141 | $16.00 | $14.00 | $25.00 | $51.06 | $30.00 |
| 0001-0580 | Regular seed (603SD20-0003) | LB | 397 | $11.00 | $16.00 | $30.00 | $26.26 | $30.00 |
| 0001-0590 | Overseeding (603SD20-0004) | LB | 317 | $5.00 | $16.00 | $25.00 | $29.18 | $30.00 |
| 0001-0600 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 7,563 | $1.06 | $1.00 | $9.00 | $1.90 | $6.00 |
| 0001-0610 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 7,792 | $1.60 | $1.00 | $9.00 | $2.19 | $7.00 |
| 0001-0620 | Fertilizer nitrogen - N (603SD20-0014) | LB | 215 | $4.00 | $3.00 | $5.00 | $7.29 | $30.00 |
| 0001-0630 | Fertilizer phosphorous - P (603SD20-0015) | LB | 99 | $4.00 | $3.00 | $5.00 | $7.29 | $30.00 |
| 0001-0640 | Fertilizer potassium - K (603SD20-0016) | LB | 99 | $4.00 | $3.00 | $5.00 | $7.29 | $30.00 |
| 0001-0650 | Lime (603SD20-0017) | TON | 7.76 | $400.00 | $484.00 | $400.00 | $729.40 | $500.00 |
| 0001-0660 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 758 | $2.50 | $2.00 | $4.00 | $2.92 | $8.00 |
| 0001-0670 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 350 | $14.00 | $3.00 | $6.00 | $4.38 | $8.00 |
| 0001-0680 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 6 | $125.00 | $515.00 | $322.00 | $368.51 | $600.00 |
| 0001-0690 | Remove existing 2 post sign structure (700SD20-0004) | EACH | 1 | $150.00 | $1,031.00 | $322.00 | $1,308.79 | $1,200.00 |
| 0001-0700 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 2 | $125.00 | $515.00 | $322.00 | $673.08 | $200.00 |
| 0001-0710 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 1 | $200.00 | $1,031.00 | $653.00 | $1,413.78 | $350.00 |
| 0001-0720 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 150 | $30.00 | $11.00 | $56.00 | $28.47 | $30.00 |
| 0001-0730 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 27 | $30.00 | $31.00 | $23.00 | $32.74 | $32.00 |
| 0001-0740 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 29 | $30.00 | $18.00 | $22.00 | $31.32 | $35.00 |
| 0001-0750 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 14 | $1,000.00 | $155.00 | $382.00 | $569.42 | $450.00 |
| 0001-0760 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 2 | $1,000.00 | $567.00 | $540.00 | $711.77 | $650.00 |
| 0001-0770 | NS traffic sign solar powered flashing LED edge lit signage assembly (700SX20-0021) | EACH | 1 | $5,000.00 | $25,000 | $14,000 | $31,318 | $15,000 |
| 0001-0780 | Sign panel (701SD20-0001) | SF | 124 | $30.00 | $35.00 | $62.00 | $49.82 | $40.00 |
| 0001-0790 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 385 | $1.05 | $1.00 | $6.00 | $1.71 | $3.00 |
| 0001-0800 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 4,050 | $1.25 | $2.00 | $7.00 | $2.12 | $6.00 |
| 0001-0810 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 105 | $55.00 | $71.00 | $46.00 | $2.85 | $40.00 |
| 0001-0820 | PVMT symb MRKG thru arrow TY B, CL II (704SD20-0045) | EACH | 1 | $375.00 | $484.00 | $815.00 | $355.89 | $1,000.00 |
| 0001-0830 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 6 | $400.00 | $548.00 | $775.00 | $391.47 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.