J. R. Caskey, Inc.: VDOT bid record
J. R. Caskey, Inc. submitted 37 bids on Virginia DOT contracts in the data, from 26 FEB 2014 to 28 OCT 2026, and was the low bidder on 9 of them (24%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $10,635,175
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2014 | 2 | 1 | 50% |
| 2015 | 2 | 2 | 100% |
| 2016 | 3 | 1 | 33% |
| 2017 | 6 | 2 | 33% |
| 2018 | 2 | 0 | 0% |
| 2019 | 4 | 0 | 0% |
| 2020 | 4 | 0 | 0% |
| 2021 | 6 | 1 | 17% |
| 2025 | 4 | 1 | 25% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Richmond | 21 | 7 | 33% |
| Lynchburg | 5 | 0 | 0% |
| Fredericksburg | 4 | 1 | 25% |
| Culpeper | 4 | 1 | 25% |
| Northern Virginia | 1 | 0 | 0% |
| Salem | 1 | 0 | 0% |
| Staunton | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Flexible pave.planing 0"-2" | 515SD20-0004 | SY | 26 | 13 (50%) | $7.03 | $9.11 |
| Lime | 603SD20-0017 | TON | 31 | 12 (39%) | $350.00 | $200.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 32 | 11 (34%) | $4.85 | $5.00 |
| Siltation control excavation | 303SD20-0029 | CY | 29 | 11 (38%) | $4.80 | $3.50 |
| Rolled erosion CTRL product EC-2 type 1 | 606SD20-0001 | SY | 17 | 11 (65%) | $2.20 | $3.45 |
| Overseeding | 603SD20-0004 | LB | 31 | 10 (32%) | $7.00 | $5.00 |
| Fertilizer phosphorous - P | 603SD20-0015 | LB | 24 | 10 (42%) | $1.75 | $3.00 |
| Fertilizer potassium - K | 603SD20-0016 | LB | 24 | 10 (42%) | $2.00 | $3.00 |
| Fertilizer nitrogen - N | 603SD20-0014 | LB | 24 | 10 (42%) | $1.80 | $3.00 |
| Type B class I pave. line marking 4" | 54032 | LF | 20 | 9 (45%) | $0.93 | $0.72 |
| Hydraulic erosion control product type 3 | 603SD20-0009 | SY | 16 | 9 (56%) | $0.95 | $1.26 |
| Hydraulic erosion control product type 2 | 603SD20-0008 | SY | 13 | 9 (69%) | $0.80 | $1.02 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| J. L. Kent & Sons, Inc. | 6 | 5 of 6 |
| Blakemore Construction Corporation | 5 | 4 of 5 |
| Fielder'S Choice Enterprises, Inc. | 5 | 2 of 5 |
| Pearson Construction, Inc. | 5 | 4 of 5 |
| Branscome Inc. | 4 | 1 of 4 |
| Sagres Construction Corporation | 3 | 0 of 3 |
| Curtis Contracting, Inc. | 3 | 2 of 3 |
| Jireh Construction Company, Inc. | 3 | 1 of 3 |
| Shoosmith Construction, Inc. | 3 | 3 of 3 |
| Whitehurst Paving Company, Incorporated | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | CM427STC129167 | Richmond | 2027 surface treatment - secondary | 2 of 2 | $884,831 | +34% |
| 23 SEP 2026 | C0000123290C01 | Richmond | Roundabout | 3 of 5 | $5,154,681 | +2.0% |
| 22 JUL 2026 | C0000115403C01C | Richmond | Smart scale - roundabout | 2 of 3 | $5,426,432 | +2.0% |
| 04 FEB 2026 | C000115407C01B | Richmond | Smart scale - roundabout | 1 of 1 | $4,668,500 | Low |
| 19 NOV 2025 | C0000123879C01 | Fredericksburg | Smart- scale - intersection improvements / lane ext. | 1 of 4 | $685,000 | Low, 3.0% under the second |
| 19 NOV 2025 | C0000119111C01 | Fredericksburg | Smart scale - r-cut road improvement | 2 of 5 | $1,897,105 | +10% |
| 22 OCT 2025 | CM426STC127760 | Richmond | 2026 surface treatment - secondary | 2 of 2 | $781,320 | +22% |
| 22 OCT 2025 | C0000127769N01 | Northern Virginia | On-call rural rustic road | 4 of 5 | $2,394,945 | +20% |
| 27 OCT 2021 | C000110902M501 | Fredericksburg | Smart scale - intersection improvements | 2 of 3 | $765,215 | +6.0% |
| 23 JUN 2021 | C0000107081C01 | Culpeper | Hsip-037-4 (017)0250-037-s63, c501 | 2 of 3 | $2,073,780 | +6.0% |
| 23 JUN 2021 | C0000108654C01 | Richmond | Left and right turning lane additions | 1 of 3 | $1,128,755 | Low, 0.0% under the second |
| 28 APR 2021 | CM421PMM118493 | Richmond | 2021 plant mix | 2 of 2 | $784,303 | +22% |
| 24 MAR 2021 | C0000111468C01 | Richmond | Smart scale - left turn lane addition | 3 of 3 | $1,186,073 | +10% |
| 24 MAR 2021 | C000106197C01 | Richmond | Oc-5a27(408)0637-020-s20, c501 | 3 of 3 | $2,476,507 | +9.0% |
| 18 NOV 2020 | C0000109529C01 | Lynchburg | Smart scale - construction of left and right turn lanes | 2 of 2 | $1,399,882 | +2.0% |
| 18 NOV 2020 | C0000109704M01 | Lynchburg | Smart scale - construction of left and right turn lanes | 2 of 2 | $978,621 | +1.0% |
| 21 OCT 2020 | C0000109537C01 | Lynchburg | Smart scale - int. improvements,roundabout & turn lanes | 2 of 3 | $3,341,902 | +1.0% |
| 22 JAN 2020 | C0000109531C01 | Lynchburg | Smart scale - intersection reconstruction | 2 of 2 | $2,408,160 | +32% |
| 18 DEC 2019 | C0000096938C01 | Culpeper | Smart scale - roundabout construction | 3 of 3 | $2,454,362 | +9.0% |
| 24 JUL 2019 | C000111753C01 | Fredericksburg | Smart scale - left turn lane onto potomac creek drive | 2 of 3 | $1,045,257 | +2.0% |
| 22 MAY 2019 | C0000109523C01 | Staunton | Smart scale - brandy station park and ride lot expansion | 3 of 3 | $936,785 | +49% |
| 23 JAN 2019 | C0000103300D21 | Lynchburg | Replace structure over tributary of muddy creek | 3 of 3 | $699,081 | +31% |
| 19 DEC 2018 | C000104661C01 | Richmond | Add traffic signal and turn lanes | 2 of 3 | $3,850,184 | +2.0% |
| 22 AUG 2018 | C0000090018C01 | Richmond | Cedar level rd. widening and safety improvements | 2 of 3 | $6,879,913 | +4.0% |
| 25 OCT 2017 | C0000017179C01 | Richmond | Horizontal & vertical alignment roadway reconstruction | 2 of 3 | $2,199,176 | +22% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.