VDOT contract C0000123879C01 bid tabulation
Smart- scale - intersection improvements / lane ext. Let by Virginia DOT on November 19, 2025, King William, Fredericksburg. 4 bids received; low bid $685,000 by J. R. Caskey, Inc..
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 53
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | J. R. Caskey, Inc. | $685,000 | Low |
| 2 | North Construction, Inc. | $708,498 | +3.0% |
| 3 | Posillico Civil, Inc. | $745,752 | +9.0% |
| 4 | BRANSCOME OPERATING, LLC dba BRANSCOME | $1,362,730 | +99% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J. R. Caskey, Inc. | 2. North Construction, Inc. | 3. Posillico Civil, Inc. | 4. BRANSCOME OPERATING, LLC dba BRANSCOME |
|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $3,550.41 | $20,000 | $30,000 | $1,432.28 |
| 0001-0020 | Endwall EW-12 (302SD20-0013) | EACH | 2 | $1,357.00 | $2,000.00 | $5,000.00 | $5,140.35 |
| 0001-0030 | 15" pipe (302SD20-0023) | LF | 8 | $856.00 | $200.00 | $383.10 | $1,308.78 |
| 0001-0040 | 18" conc. pipe (302SD20-0030) | LF | 164 | $231.00 | $275.00 | $425.00 | $237.36 |
| 0001-0050 | 15" end section ES-1 or 2 (302SD20-0198) | EACH | 1 | $3,000.00 | $2,000.00 | $5,500.00 | $3,905.89 |
| 0001-0060 | 18" end section ES-1 (302SD20-0201) | EACH | 2 | $3,500.00 | $2,500.00 | $5,500.00 | $4,853.61 |
| 0001-0070 | Drop inlet DI-13 TY.I (302SD20-0655) | EACH | 1 | $23,466 | $15,000 | $15,000 | $12,801 |
| 0001-0080 | Regular excavation (303SD20-0001) | CY | 177 | $350.00 | $150.00 | $225.00 | $1,056.75 |
| 0001-0090 | Check dam rock TY. I (303SD20-0022) | EACH | 3 | $1,250.00 | $800.00 | $1,500.00 | $4,088.50 |
| 0001-0100 | Siltation control excavation (303SD20-0029) | CY | 137.36 | $0.01 | $5.00 | $125.00 | $81.75 |
| 0001-0110 | Inlet protection type B (303SD20-0031) | EACH | 1 | $1,500.00 | $200.00 | $750.00 | $358.07 |
| 0001-0120 | Temp. silt fence type A (303SD20-0034) | LF | 783 | $12.00 | $10.00 | $12.00 | $3.37 |
| 0001-0130 | Borrow excavation (305SD20-0001) | CY | 412 | $110.00 | $150.00 | $150.00 | $63.95 |
| 0001-0140 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 179 | $160.00 | $65.00 | $190.00 | $212.20 |
| 0001-0150 | Asphalt concrete TY. SM- 12.5D const (315SD20-0002) | TON | 178 | $265.00 | $250.00 | $215.00 | $187.48 |
| 0001-0160 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 61 | $265.00 | $240.00 | $200.00 | $323.27 |
| 0001-0170 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 242 | $265.00 | $225.00 | $165.00 | $211.01 |
| 0001-0180 | Saw-cut asphalt concrete asphalt (315SD20-0104) | LF | 633 | $12.00 | $5.00 | $6.00 | $3.58 |
| 0001-0190 | Crossdrain CD-2 (501SD20-0007) | LF | 64 | $150.00 | $130.00 | $85.00 | $209.96 |
| 0001-0200 | Paved ditch PG-2A (502SD20-0003) | SY | 122 | $270.00 | $150.00 | $220.00 | $337.45 |
| 0001-0210 | Curb, STD. CG-3 (502SD20-0014) | LF | 444 | $105.00 | $60.00 | $60.00 | $87.05 |
| 0001-0220 | Curb, radial CG-3 (502SD20-0015) | LF | 88 | $105.00 | $60.00 | $65.00 | $193.00 |
| 0001-0230 | Median strip MS-1 (502SD20-0053) | SY | 26 | $400.00 | $250.00 | $400.00 | $374.32 |
| 0001-0240 | Demo. of pavement flexible (508SD20-0004) | SY | 256 | $40.00 | $40.00 | $200.00 | $21.76 |
| 0001-0250 | Allaying dust (511SD20-0001) | HR | 100 | $1.00 | $1.00 | $20.00 | $146.46 |
| 0001-0260 | Temporary sign (512SD20-0014) | SF | 610 | $1.00 | $2.00 | $45.00 | $77.79 |
| 0001-0270 | Truck mounted attenuator (512SD20-0023) | HR | 3,240 | $1.00 | $25.00 | $3.00 | $45.55 |
| 0001-0280 | Group 2 channelizing devices (512SD20-0024) | DAY | 12,150 | $0.01 | $3.00 | $0.50 | $0.76 |
| 0001-0290 | Electronic arrow board (512SD20-0026) | HR | 3,240 | $0.01 | $5.00 | $2.00 | $15.36 |
| 0001-0300 | Flagger service (512SD20-0027) | HR | 352 | $40.00 | $60.00 | $50.00 | $86.95 |
| 0001-0310 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 374 | $25.00 | $4.00 | $3.50 | $7.16 |
| 0001-0320 | Mobilization (513SD20-0001) | LS | 1 | $56,000 | $40,000 | $60,000 | $348,776 |
| 0001-0330 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 1,067 | $15.00 | $24.00 | $20.00 | $17.04 |
| 0001-0340 | Construction surveying constr. (517SD20-0001) | LS | 1 | $25,000 | $50,000 | $15,000 | $30,200 |
| 0001-0350 | Topsoil class B 2" (602SD20-0003) | ACRE | 0.31 | $55,826 | $10,000 | $30,646 | $77,318 |
| 0001-0360 | Temporary seed (603SD20-0002) | LB | 31 | $26.00 | $10.00 | $16.00 | $15.76 |
| 0001-0370 | Regular seed (603SD20-0003) | LB | 87 | $26.00 | $10.00 | $10.00 | $17.19 |
| 0001-0380 | Overseeding (603SD20-0004) | LB | 70 | $26.00 | $10.00 | $5.00 | $17.19 |
| 0001-0390 | Fertilizer nitrogen - N (603SD20-0014) | LB | 47 | $5.00 | $10.00 | $3.00 | $3.58 |
| 0001-0400 | Fertilizer phosphorous - P (603SD20-0015) | LB | 22 | $5.00 | $10.00 | $3.00 | $3.58 |
| 0001-0410 | Fertilizer potassium - K (603SD20-0016) | LB | 22 | $5.00 | $10.00 | $3.00 | $3.58 |
| 0001-0420 | Lime (603SD20-0017) | TON | 1.71 | $448.00 | $500.00 | $450.00 | $615.88 |
| 0001-0430 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 1 | $1,500.00 | $1,000.00 | $400.00 | $1,639.64 |
| 0001-0440 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 96 | $35.00 | $35.00 | $20.00 | $28.57 |
| 0001-0450 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 10.50 | $35.00 | $50.00 | $20.00 | $32.87 |
| 0001-0460 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 10 | $301.00 | $500.00 | $1,500.00 | $565.75 |
| 0001-0470 | Sign panel (701SD20-0001) | SF | 86.20 | $100.00 | $35.00 | $40.00 | $50.06 |
| 0001-0480 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 1,150 | $5.00 | $6.00 | $2.25 | $3.57 |
| 0001-0490 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 40 | $125.00 | $50.00 | $95.00 | $35.81 |
| 0001-0500 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 20 | $850.00 | $75.00 | $175.00 | $214.84 |
| 0001-0510 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 2 | $750.00 | $1,000.00 | $375.00 | $465.49 |
| 0001-0520 | PVMT symb MRKG yield 2' X 3' TY B CL I (704SD20-0086) | EACH | 7 | $150.00 | $1,000.00 | $50.00 | $121.74 |
| 0001-0530 | Outlet pipe (501SD20-0009) | LF | 12 | $64.00 | $35.00 | $200.00 | $949.82 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.