BRANSCOME OPERATING, LLC dba BRANSCOME: VDOT bid record
BRANSCOME OPERATING, LLC dba BRANSCOME submitted 32 bids on Virginia DOT contracts in the data, from 19 NOV 2025 to 26 AUG 2026, and was the low bidder on 7 of them (22%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $28,104,135
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 12 | 5 | 42% |
| 2026 | 20 | 2 | 10% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Richmond | 13 | 0 | 0% |
| Hampton Roads | 11 | 4 | 36% |
| Fredericksburg | 8 | 3 | 38% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asph. conc. BMD P+VO SM- 12.5D | 315SP20-0051 | TON | 15 | 11 (73%) | $114.55 | $105.35 |
| Temp. PVMT MRKG TY. A, 4" | 512SD20-0046 | LF | 23 | 9 (39%) | $0.10 | $0.12 |
| Asph. conc. BMD P+VO SM- 9.5D | 315SP20-0049 | TON | 14 | 9 (64%) | $118.47 | $111.00 |
| Rumble strip cylindrical asphalt | 315SD20-0015 | LF | 13 | 9 (69%) | $0.45 | $0.51 |
| Rumble strip sinusoidal asphalt | 315SD20-0052 | LF | 7 | 6 (86%) | $0.33 | $0.46 |
| Conduit PVC 1" | 700SD20-0182 | LF | 7 | 6 (86%) | $40.21 | $25.00 |
| Asph. conc. TY. SM-12.5E maint | 315SD20-0036 | TON | 7 | 5 (71%) | $169.36 | $88.72 |
| Temp. PVMT MRKG TY. A, 12" | 512SD20-0049 | LF | 19 | 4 (21%) | $1.22 | $2.00 |
| Eradicate nonlinear PVMT MRKG | 512SD20-0043 | SF | 8 | 3 (38%) | $6.22 | $10.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 6 | 3 (50%) | $44.38 | $20.00 |
| Fertilizer phosphorous - P | 603SD20-0015 | LB | 6 | 3 (50%) | $4.31 | $3.00 |
| Fertilizer potassium - K | 603SD20-0016 | LB | 6 | 3 (50%) | $4.31 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Allan Myers Va, Inc. | 29 | 23 of 29 |
| Colony Construction, Inc. | 8 | 8 of 8 |
| A & A Contractors, LLC | 6 | 2 of 6 |
| EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 6 | 4 of 6 |
| J. R. Caskey, Inc. | 2 | 2 of 2 |
| North Construction, Inc. | 2 | 1 of 2 |
| Posillico Civil, Inc. | 2 | 2 of 2 |
| Superior Paving Corporation | 2 | 2 of 2 |
| Curtis Contracting, Inc. | 2 | 0 of 2 |
| Sagres Construction Corporation | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C000119218C01B | Hampton Roads | Smart scale - intersection improvement (cgt) | 1 of 3 | $2,603,514 | Low, 18% under the second |
| 22 JUL 2026 | CM427PMJ129176 | Richmond | 2027 plant mix - secondary | 4 of 4 | $3,537,785 | +32% |
| 22 JUL 2026 | CM427PMK129177 | Richmond | 2027 plant mix - secondary | 3 of 4 | $3,823,643 | +20% |
| 22 JUL 2026 | CM527PMI128949 | Hampton Roads | 2027 plant mix - primary/secondary | 2 of 3 | $3,875,684 | +15% |
| 27 MAY 2026 | C0000123889C01B | Fredericksburg | Smart scale - intersection improvements / r-cuts | 1 of 3 | $2,867,588 | Low, 16% under the second |
| 27 MAY 2026 | C0000113412C01B | Fredericksburg | Intersection improvement | 3 of 4 | $3,322,257 | +14% |
| 22 APR 2026 | C0000115529N01B | Hampton Roads | Smart scale - safety improvements | 2 of 3 | $2,187,541 | +10% |
| 25 FEB 2026 | CM426PM1127956B | Richmond | 2026 plant mix - interstate | 2 of 2 | $11,486,147 | +47% |
| 25 FEB 2026 | CM426PM2127957B | Richmond | 2026 plant mix - interstate | 2 of 2 | $8,626,310 | +61% |
| 04 FEB 2026 | CM426PM5127962 | Richmond | 2026 plant mix - interstate | 2 of 2 | $13,616,862 | +50% |
| 04 FEB 2026 | CM426PMC127947 | Richmond | 2026 plant mix - primary | 2 of 2 | $4,662,346 | +1.0% |
| 04 FEB 2026 | CM426PML127948 | Richmond | 2026 plant mix - primary | 3 of 3 | $3,998,581 | +24% |
| 04 FEB 2026 | CM426PMF127949 | Richmond | 2026 plant mix - secondary | 4 of 4 | $4,274,848 | +9.0% |
| 04 FEB 2026 | CM526PMJ127817 | Hampton Roads | 2026 plant mix - primary | 2 of 2 | $3,461,806 | +8.0% |
| 14 JAN 2026 | CM426PM3128503 | Richmond | 2026 plant mix - interstate | 2 of 2 | $4,910,182 | +19% |
| 14 JAN 2026 | CM426PM4127960 | Richmond | 2026 plant mix - primary | 3 of 3 | $6,306,080 | +48% |
| 14 JAN 2026 | CM526PMH127807 | Hampton Roads | 2026 plant mix - interstate | 3 of 3 | $6,458,800 | +30% |
| 14 JAN 2026 | CM626PMP127640 | Fredericksburg | 2026 plant mix - primary | 4 of 4 | $4,167,225 | +45% |
| 14 JAN 2026 | CM626PMS127627 | Fredericksburg | 2026 plant mix - primary | 4 of 4 | $3,968,827 | +21% |
| 14 JAN 2026 | CM526PMN127811 | Hampton Roads | 2026 plant mix - interstate | 3 of 3 | $5,821,474 | +6.0% |
| 17 DEC 2025 | CM426PMD127953 | Richmond | 2026 plant mix - primary/secondary | 3 of 3 | $9,767,444 | +17% |
| 17 DEC 2025 | CM526PMA127812 | Hampton Roads | 2026 plant mix - primary/secondary | 1 of 2 | $5,894,783 | Low, 1.0% under the second |
| 17 DEC 2025 | CM526PME127818 | Hampton Roads | 2026 plant mix - primary | 1 of 2 | $3,680,420 | Low, 19% under the second |
| 17 DEC 2025 | CM626PMC127641 | Fredericksburg | 2026 plant mix - primary | 1 of 2 | $3,957,528 | Low, 12% under the second |
| 17 DEC 2025 | CM626PMG127635 | Fredericksburg | 2026 plant mix - primary / secondary | 1 of 2 | $4,800,305 | Low, 14% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.