VDOT contract CM426PM4127960 bid tabulation
2026 plant mix - primary. Let by Virginia DOT on January 14, 2026, Chesterfield, Richmond. 3 bids received; low bid $4,255,638 by Colony Construction, Inc..
- Owner
- Virginia DOT
- Letting
- 14 JAN 2026
- Pay items
- 28
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Colony Construction, Inc. | $4,255,638 | Low |
| 2 | Allan Myers Va, Inc. | $4,911,777 | +15% |
| 3 | BRANSCOME OPERATING, LLC dba BRANSCOME | $6,306,080 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Colony Construction, Inc. | 2. Allan Myers Va, Inc. | 3. BRANSCOME OPERATING, LLC dba BRANSCOME |
|---|---|---|---|---|---|---|
| 0001-0010 | Tack coat (310SD20-0001) | GAL | 24,194 | $0.01 | $0.01 | $0.01 |
| 0001-0020 | Asph. conc. TY. SM-12.5E maint (315SD20-0036) | TON | 6,845.72 | $120.00 | $173.47 | $173.69 |
| 0001-0030 | Pavement shoulder wedge prep. const (315SP20-0006) | LF | 8,976 | $0.20 | $0.01 | $0.97 |
| 0001-0040 | Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049) | TON | 2,207.48 | $112.00 | $110.00 | $216.95 |
| 0001-0050 | Asph. conc. BMD P+VO SM- 12.5D (315SP20-0051) | TON | 17,018.28 | $110.00 | $156.47 | $121.44 |
| 0001-0060 | Travel lane patching (patch mix type) IM-19.0D (323SD20-0030) | TON | 673.72 | $55.00 | $240.00 | $320.34 |
| 0001-0070 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 1,572 | $5.14 | $0.65 | $0.78 |
| 0001-0080 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 106,325 | $0.10 | $0.01 | $0.12 |
| 0001-0090 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 47,414 | $0.11 | $0.11 | $0.13 |
| 0001-0100 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 4,458 | $0.15 | $0.15 | $0.18 |
| 0001-0110 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 12,046 | $1.00 | $0.01 | $1.20 |
| 0001-0120 | NS maintenance of traffic maintenance of traffic (512SP20-0002) | LS | 1 | $245,003 | $19,876 | $430,806 |
| 0001-0130 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 243,719.14 | $1.75 | $0.25 | $4.78 |
| 0001-0140 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 52,063 | $0.79 | $0.79 | $1.01 |
| 0001-0150 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 4,924 | $5.00 | $5.00 | $7.18 |
| 0001-0160 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 460 | $15.00 | $15.00 | $21.54 |
| 0001-0170 | Type B class VI PVMT line MRKG 6" (704SD20-0027) | LF | 71,580 | $4.40 | $4.40 | $5.50 |
| 0001-0180 | Type B class VI PVMT line MRKG 8" (704SD20-0028) | LF | 690 | $6.50 | $6.50 | $7.78 |
| 0001-0190 | Type B class VI PVMT line MRKG 12" (704SD20-0029) | LF | 11,793 | $8.75 | $8.75 | $11.07 |
| 0001-0200 | Type B class VI contrast PVMT line MRKG 6" (704SD20-0031) | LF | 864 | $7.85 | $7.85 | $9.39 |
| 0001-0210 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 1,179 | $31.00 | $31.00 | $38.29 |
| 0001-0220 | PVMT MSG. mark. "only" TY B, CL. I, 6' (704SD20-0035) | EACH | 4 | $650.00 | $650.00 | $777.84 |
| 0001-0230 | PVMT symb MRKG thru arrow TY B, CL I (704SD20-0044) | EACH | 1 | $125.00 | $125.00 | $149.58 |
| 0001-0240 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 33 | $130.00 | $130.00 | $155.57 |
| 0001-0250 | DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050) | EACH | 2 | $225.00 | $225.00 | $269.26 |
| 0001-0260 | Symb MRKG lane reduction arr TY B CL I (704SD20-0059) | EACH | 7 | $210.00 | $210.00 | $251.30 |
| 0001-0270 | Symb MRKG wrong-way arrow TY B CL I (704SD20-0062) | EACH | 1 | $215.00 | $215.00 | $257.29 |
| 0001-0280 | NS pavement marking type B class VI contrast PVMT MRKG 12" (704SX20-0001) | LF | 796 | $25.00 | $25.00 | $29.92 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of January 14, 2026. Compiled by Mirage Metrics.