VDOT contract C0000122360M01 bid tabulation
Bridge rehabilitation. Let by Virginia DOT on July 22, 2026, Caroline, Fredericksburg. 6 bids received; low bid $8,470,743 by Martins Construction Corp..
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 79
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martins Construction Corp. | $8,470,743 | Low |
| 2 | Wagman Heavy Civil, Inc. | $9,052,044 | +7.0% |
| 3 | OTB ASSOCIATES, LLC dba OTB CONTRACTING | $10,499,523 | +24% |
| 4 | M. D. Miller Co., Inc. | $10,789,531 | +27% |
| 5 | Southern Road & Bridge, LLC | $14,606,099 | +72% |
| 6 | Sagres Construction Corporation | $16,350,000 | +93% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martins Construction Corp. | 2. Wagman Heavy Civil, Inc. | 3. OTB ASSOCIATES, LLC dba OTB CONTRACTING | 4. M. D. Miller Co., Inc. | 5. Southern Road & Bridge, LLC | 6. Sagres Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $35,000 | $30,000 | $12,000 | $50,000 | $12,500 | $6,377.13 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 20 | $1,750.00 | $50.00 | $2,500.00 | $2,000.00 | $1,500.00 | $637.71 |
| 0001-0025 | Regular excavation (303SD20-0001) | CY | 720 | $110.00 | $60.00 | $130.00 | $200.00 | $95.00 | $200.00 |
| 0001-0030 | Temp. silt fence type A (303SD20-0034) | LF | 1,834 | $15.00 | $7.50 | $6.00 | $25.00 | $4.00 | $10.02 |
| 0001-0040 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 950 | $102.00 | $90.00 | $170.00 | $200.00 | $125.00 | $125.00 |
| 0001-0050 | Asphalt concrete TY. SM- 12.5E const (315SD20-0003) | TON | 3,430 | $225.00 | $185.00 | $230.00 | $272.00 | $335.00 | $300.00 |
| 0001-0060 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 2,280 | $175.00 | $160.00 | $180.00 | $208.00 | $400.00 | $275.00 |
| 0001-0070 | Rumble strip cylindrical asphalt (315SD20-0015) | LF | 7,872 | $3.65 | $0.40 | $2.50 | $5.00 | $4.00 | $4.27 |
| 0001-0080 | NS saw-cut asph conc (7" depth) (315SX20-0011) | LF | 8,505 | $2.50 | $1.50 | $4.50 | $5.00 | $45.00 | $5.10 |
| 0001-0090 | NS saw-cut asph conc (full-depth) (315SX20-0011) | LF | 7,430 | $3.50 | $2.75 | $6.50 | $5.00 | $55.00 | $6.38 |
| 0001-0100 | Bridge deck grooving maint. (404SD20-0020) | SY | 2,210 | $11.60 | $8.00 | $25.00 | $25.00 | $12.00 | $8.92 |
| 0001-0110 | NS pre. & spot coat EX. STR. (STR. 2000, type B) (411SX20-0001) | SF | 120 | $125.00 | $1,050.00 | $350.00 | $130.00 | $500.00 | $250.00 |
| 0001-0120 | NS pre. & spot coat EX. STR. (STR. 2001, type B) (411SX20-0001) | SF | 120 | $125.00 | $1,050.00 | $350.00 | $130.00 | $500.00 | $250.00 |
| 0001-0130 | NS env. prot. & health & safety (STR. 2000, type B) (411SX20-0005) | LS | 1 | $6,200.00 | $198,500 | $7,000.00 | $20,000 | $5,000.00 | $50,000 |
| 0001-0140 | NS env. prot. & health & safety (STR. 2001, type B) (411SX20-0005) | LS | 1 | $6,200.00 | $198,500 | $7,000.00 | $20,000 | $5,000.00 | $50,000 |
| 0001-0150 | NS disposal of material (STR. 2000, type B) (411SX20-0006) | LS | 1 | $5,150.00 | $60,000 | $5,500.00 | $20,000 | $5,000.00 | $50,000 |
| 0001-0160 | NS disposal of material (STR. 2001, type B) (411SX20-0006) | LS | 1 | $5,150.00 | $60,000 | $5,500.00 | $20,000 | $5,000.00 | $50,000 |
| 0001-0170 | Crack repair type B (412SD20-0013) | LF | 293 | $70.00 | $200.00 | $75.00 | $100.00 | $405.00 | $300.00 |
| 0001-0180 | Embedded galvanic anodes (412SD20-0017) | EACH | 1,309 | $40.00 | $55.00 | $50.00 | $25.00 | $65.00 | $150.00 |
| 0001-0190 | H.E.S. patching type B (412SD20-0034) | SY | 16 | $1,100.00 | $700.00 | $1,700.00 | $1,500.00 | $4,500.00 | $3,000.00 |
| 0001-0200 | H.E.S. patching type C (412SD20-0036) | SY | 11 | $1,350.00 | $3,100.00 | $2,200.00 | $2,000.00 | $4,500.00 | $3,000.00 |
| 0001-0210 | Deck slab closure (412SD20-0037) | SY | 120 | $2,600.00 | $3,500.00 | $3,350.00 | $3,000.00 | $5,500.00 | $9,000.00 |
| 0001-0220 | Expansion joint reconstruction hes (412SD20-0042) | LF | 279 | $785.00 | $425.00 | $1,100.00 | $1,000.00 | $885.00 | $2,000.00 |
| 0001-0230 | Beam end repair (412SD20-0047) | EACH | 96 | $4,750.00 | $4,390.00 | $7,300.00 | $4,000.00 | $3,350.00 | $10,000 |
| 0001-0240 | Jacking and blocking beam (412SD20-0048) | EACH | 144 | $5,300.00 | $4,780.00 | $8,500.00 | $10,000 | $4,485.00 | $15,000 |
| 0001-0250 | Conc. superstr. surface repair (412SD20-0049) | SY | 22 | $1,600.00 | $2,775.00 | $2,700.00 | $2,500.00 | $4,500.00 | $5,000.00 |
| 0001-0260 | Concrete substruct. surface repair (412SD20-0061) | SY | 137 | $1,900.00 | $2,575.00 | $2,000.00 | $1,500.00 | $5,500.00 | $5,000.00 |
| 0001-0270 | NS BR.superstr. wid./repair (replace bolts) (412SX20-0009) | EACH | 6 | $250.00 | $500.00 | $1,400.00 | $2,500.00 | $650.00 | $2,000.00 |
| 0001-0280 | NS BR.superstr. wid./repair (construction access; STR. 2000) (412SX20-0013) | LS | 1 | $300,000 | $598,000 | $420,000 | $125,000 | $95,000 | $500,000 |
| 0001-0290 | NS BR.superstr. wid./repair (construction access; STR. 2001) (412SX20-0013) | LS | 1 | $300,000 | $598,000 | $420,000 | $125,000 | $95,000 | $500,000 |
| 0001-0300 | Waterproofing – epoxy resin type EP-3B/EP-3T (416SD20-0003) | SY | 174 | $135.00 | $185.00 | $200.00 | $75.00 | $98.00 | $68.87 |
| 0001-0310 | Waterproofing – epoxy resin type EP-3B/EP-3T (416SD20-0003) | SY | 378 | $169.00 | $175.00 | $200.00 | $75.00 | $98.00 | $68.87 |
| 0001-0320 | Adhesive based JT. sealer CL. II, 2" maint. (420SD20-0023) | LF | 28 | $165.00 | $300.00 | $280.00 | $250.00 | $225.00 | $165.73 |
| 0001-0330 | Elastomeric expans. dam 0" to 2" SPRSTR maint (421SD20-0006) | LF | 279 | $500.00 | $350.00 | $1,200.00 | $1,100.00 | $950.00 | $382.63 |
| 0001-0340 | Type A milling 1-1/2" (425SD20-0004) | SY | 2,210 | $88.00 | $56.50 | $110.00 | $100.00 | $115.00 | $31.89 |
| 0001-0350 | PLC.high early mod.conc.overlay (425SD20-0014) | SY | 2,210 | $120.00 | $62.20 | $200.00 | $175.00 | $225.00 | $500.00 |
| 0001-0360 | Type A hydro-demolition 1/2" (425SD20-0022) | SY | 2,210 | $130.00 | $120.00 | $200.00 | $175.00 | $155.00 | $200.00 |
| 0001-0370 | NS furn. high early latex mod.conc. (2") (425SX20-0003) | CY | 122.80 | $1,200.00 | $2,600.00 | $3,000.00 | $2,800.00 | $2,250.00 | $3,500.00 |
| 0001-0380 | Replace bearing (426SD20-0001) | EACH | 48 | $5,650.00 | $6,500.00 | $5,700.00 | $7,300.00 | $5,600.00 | $10,000 |
| 0001-0390 | Modify exist. fixed bearing (426SD20-0004) | EACH | 16 | $3,050.00 | $600.00 | $3,500.00 | $5,000.00 | $4,000.00 | $6,377.13 |
| 0001-0400 | Concrete surface penetrant sealer (428SD20-0001) | SY | 542 | $40.00 | $45.00 | $40.00 | $75.00 | $48.00 | $229.58 |
| 0001-0410 | NS nbis access, under bridge (STR. 2000) (430SX20-0001) | DAY | 1 | $3,120.00 | $4,000.00 | $5,000.00 | $5,000.00 | $6,500.00 | $20,279 |
| 0001-0420 | NS nbis access, under bridge (STR. 2001) (430SX20-0001) | DAY | 1 | $3,120.00 | $4,000.00 | $5,000.00 | $5,000.00 | $6,500.00 | $20,279 |
| 0001-0430 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 2 | $1,645.00 | $1,600.00 | $1,800.00 | $1,300.00 | $12,500 | $1,275.43 |
| 0001-0440 | Guardrail GR-MGS1 (505SD20-0011) | LF | 425 | $35.03 | $34.00 | $40.00 | $52.00 | $450.00 | $70.15 |
| 0001-0450 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 2 | $3,910.00 | $3,800.00 | $4,200.00 | $6,500.00 | $12,500 | $4,463.99 |
| 0001-0460 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 2 | $1,545.00 | $1,500.00 | $1,700.00 | $2,600.00 | $22,500 | $7,014.84 |
| 0001-0470 | NS guardrail guardrail terminal site preparation (6-FT moderate) (505SX20-0058) | EACH | 2 | $155.00 | $150.00 | $170.00 | $5,000.00 | $65,000 | $3,188.57 |
| 0001-0480 | Demo. of pavement flexible (508SD20-0004) | SY | 8,926 | $75.00 | $19.50 | $22.00 | $40.00 | $68.00 | $30.00 |
| 0001-0490 | Traffic barrier service MB-11A (512SD20-0003) | LF | 8,275 | $60.00 | $40.00 | $70.00 | $50.00 | $80.00 | $100.00 |
| 0001-0500 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 7 | $5,640.00 | $5,000.00 | $24,000 | $20,000 | $25,000 | $21,631 |
| 0001-0510 | Type 3 barricade 8' (512SD20-0013) | EACH | 8 | $365.00 | $400.00 | $800.00 | $550.00 | $2,500.00 | $495.68 |
| 0001-0520 | Temporary sign (512SD20-0014) | SF | 8,627 | $30.00 | $40.00 | $16.00 | $25.00 | $20.00 | $33.80 |
| 0001-0530 | Truck mounted attenuator (512SD20-0023) | HR | 2,208 | $22.00 | $40.00 | $65.00 | $100.00 | $165.00 | $20.28 |
| 0001-0540 | Group 2 channelizing devices (512SD20-0024) | DAY | 23,010 | $1.00 | $0.55 | $2.00 | $0.01 | $5.00 | $3.67 |
| 0001-0550 | Port.changeable mess. sign (512SD20-0025) | HR | 7,392 | $4.75 | $1.20 | $20.00 | $0.01 | $15.00 | $3.83 |
| 0001-0560 | Electronic arrow board (512SD20-0026) | HR | 1,680 | $9.00 | $8.00 | $15.00 | $75.00 | $14.00 | $17.44 |
| 0001-0570 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 11,800 | $1.65 | $0.92 | $1.10 | $2.00 | $2.00 | $1.91 |
| 0001-0580 | Temp. pave. marker 1 way (512SD20-0044) | EACH | 1,860 | $15.50 | $11.00 | $17.00 | $14.30 | $20.00 | $19.13 |
| 0001-0590 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 800 | $6.65 | $5.00 | $3.50 | $6.50 | $10.00 | $8.21 |
| 0001-0600 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 6,930 | $3.40 | $2.70 | $3.50 | $3.51 | $6.00 | $4.20 |
| 0001-0610 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 41,490 | $4.50 | $3.50 | $4.50 | $4.55 | $7.00 | $5.52 |
| 0001-0615 | NS work zone speed limit and vehicle speed feedback trailer (locations as shown) (512SX20-0018) | EACH | 6 | $8,265.00 | $15,000 | $1,300.00 | $16,000 | $28,500 | $87,606 |
| 0001-0620 | Mobilization (513SD20-0001) | LS | 1 | $450,000 | $475,000 | $475,000 | $895,000 | $1,650,000 | $800,000 |
| 0001-0630 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 18,478 | $7.65 | $4.80 | $3.50 | $20.00 | $35.00 | $12.00 |
| 0001-0640 | Construction surveying constr. (517SD20-0001) | LS | 1 | $9,265.00 | $245,000 | $45,000 | $50,000 | $65,000 | $264,258 |
| 0001-0650 | Topsoil class A 2" (602SD20-0001) | ACRE | 0.20 | $11,850 | $27,175 | $9,000.00 | $10,000 | $200,000 | $26,800 |
| 0001-0660 | Temporary seed (603SD20-0002) | LB | 20 | $6.00 | $25.00 | $40.00 | $50.00 | $150.00 | $63.77 |
| 0001-0670 | Regular seed (603SD20-0003) | LB | 55 | $6.00 | $25.00 | $20.00 | $50.00 | $150.00 | $76.53 |
| 0001-0680 | Overseeding (603SD20-0004) | LB | 44 | $6.00 | $25.00 | $25.00 | $50.00 | $15.00 | $76.53 |
| 0001-0690 | Hydraulic erosion control product type 1 (603SD20-0007) | SY | 605 | $4.20 | $1.50 | $10.00 | $25.00 | $95.00 | $3.96 |
| 0001-0700 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 1,573 | $4.20 | $2.00 | $3.00 | $25.00 | $95.00 | $3.96 |
| 0001-0710 | Fertilizer nitrogen - N (603SD20-0014) | LB | 20 | $9.60 | $5.00 | $30.00 | $50.00 | $150.00 | $95.66 |
| 0001-0720 | Fertilizer phosphorous - P (603SD20-0015) | LB | 14 | $9.60 | $5.00 | $40.00 | $50.00 | $150.00 | $95.66 |
| 0001-0730 | Fertilizer potassium - K (603SD20-0016) | LB | 14 | $9.60 | $5.00 | $40.00 | $50.00 | $150.00 | $95.66 |
| 0001-0740 | Lime (603SD20-0017) | TON | 1.10 | $2,000.00 | $650.00 | $800.00 | $1,000.00 | $250.00 | $951.18 |
| 0001-0750 | Type B class VI PVMT line MRKG 6" (704SD20-0027) | LF | 11,800 | $7.30 | $4.40 | $6.00 | $5.72 | $10.00 | $12.00 |
| 0001-0760 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 130 | $85.00 | $66.00 | $60.00 | $85.80 | $105.00 | $105.57 |
| 0001-0770 | Removal of SRPM (704SP20-0001) | EACH | 130 | $9.25 | $15.00 | $50.00 | $10.00 | $55.00 | $51.02 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.