VDOT contract CM526PMT127804B bid tabulation
2026 concrete repair - interstate. Let by Virginia DOT on March 25, 2026, Norfolk, Hampton Roads. 2 bids received; low bid $2,455,579 by Richard Hite Concrete Construction, Inc..
- Owner
- Virginia DOT
- Letting
- 25 MAR 2026
- Pay items
- 11
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Richard Hite Concrete Construction, Inc. | $2,455,579 | Low |
| 2 | Curtis Contracting, Inc. | $3,473,325 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Richard Hite Concrete Construction, Inc. | 2. Curtis Contracting, Inc. |
|---|---|---|---|---|---|
| 0001-0010 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 187 | $200.00 | $133.31 |
| 0001-0020 | Patch HCC pavement type I (316SP20-0001) | SY | 1,004 | $700.00 | $1,188.63 |
| 0001-0030 | Patch HCC pavement type II (316SP20-0002) | SY | 1,961 | $800.00 | $783.17 |
| 0001-0040 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 7,695 | $0.55 | $2.67 |
| 0001-0050 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 468 | $10.00 | $6.71 |
| 0001-0060 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 1,465 | $0.15 | $0.92 |
| 0001-0070 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 7,695 | $0.16 | $3.35 |
| 0001-0080 | NS maintenance of traffic MOT (512SP20-0002) | LS | 1 | $100,000 | $617,776 |
| 0001-0090 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 1,465 | $0.80 | $4.19 |
| 0001-0100 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 7,695 | $4.25 | $5.45 |
| 0001-0110 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 234 | $10.00 | $10.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.