VDOT contract CM526PMP127782B bid tabulation

2026 concrete repair - interstate. Let by Virginia DOT on March 25, 2026, Chesapeake, Norfolk, Virginia Beach, Hampton Roads. 2 bids received; low bid $6,220,822 by Richard Hite Concrete Construction, Inc..

Owner
Virginia DOT
Letting
25 MAR 2026
Pay items
13
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Richard Hite Concrete Construction, Inc.$6,220,822Low
2Curtis Contracting, Inc.$8,986,981+44%
VDOT contract CM526PMP127782B: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Richard Hite Concrete Construction, Inc.2. Curtis Contracting, Inc.
0001-0010Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003)TON316$200.00$129.18
0001-0020Patch HCC pavement type I (316SP20-0001)SY853$700.00$1,185.90
0001-0030Patch HCC pavement type II (316SP20-0002)SY6,524$800.00$943.56
0001-0040Eradicate linear PVMT MRKG (512SD20-0042)LF24,605$1.25$2.58
0001-0050Temp. PVMT MRKG TY. A, 4" (512SD20-0046)LF54,500$0.08$0.89
0001-0060NS maintenance of traffic MOT (512SP20-0002)LS1$245,880$1,589,086
0001-0070Type B class I PVMT line MRKG 6" (704SD20-0007)LF26,985$1.75$2.60
0001-0080Type B class I PVMT line MRKG 12" (704SD20-0009)LF378$14.00$5.28
0001-0090Type B class I PVMT line MRKG 24" (704SD20-0010)LF80$28.00$10.56
0001-0100PVMT MSG. mark. "only" TY B, CL. I, 6' (704SD20-0035)EACH2$650.00$609.32
0001-0110PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047)EACH2$185.00$487.46
0001-0120Symb MRKG wrong-way arrow TY B CL I (704SD20-0062)EACH4$350.00$487.46
0001-0130Removal of SRPM (704SP20-0001)EACH5$500.00$116.99
VDOT contract CM526PMP127782B: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy