VDOT contract C0000128009N01 bid tabulation
On-call guardrail repairs and replacement. Let by Virginia DOT on March 25, 2026, Hampton Rds, Hampton Roads. 3 bids received; low bid $826,781 by Curtis Contracting, Inc..
- Owner
- Virginia DOT
- Letting
- 25 MAR 2026
- Pay items
- 81
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Curtis Contracting, Inc. | $826,781 | Low |
| 2 | L. S. Lee, Inc. | $967,178 | +17% |
| 3 | Makco, Incorporated | $1,775,775 | +115% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Curtis Contracting, Inc. | 2. L. S. Lee, Inc. | 3. Makco, Incorporated |
|---|---|---|---|---|---|---|
| 0001-0010 | Temp. silt fence type A (303SD20-0034) | LF | 100 | $1.00 | $1.50 | $10.00 |
| 0001-0020 | Borrow excavation (305SD20-0001) | CY | 25 | $20.00 | $10.00 | $180.00 |
| 0001-0030 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 1,500 | $50.00 | $50.00 | $75.00 |
| 0001-0040 | Machining shoulders (305SP20-0005) | LF | 8,350 | $1.50 | $2.00 | $10.00 |
| 0001-0050 | Manual shoulders restoration (305SP20-0006) | LF | 1,200 | $2.00 | $0.01 | $10.00 |
| 0001-0060 | NS pavement restoration (315SX20-0005) | TON | 5 | $600.00 | $3,600.00 | $1,000.00 |
| 0001-0070 | NS saw-cut asph conc (full depth) (315SX20-0011) | LF | 50 | $10.00 | $30.00 | $100.00 |
| 0001-0080 | Railing texas T-6 maint. (410SD20-0032) | LF | 200 | $155.00 | $150.00 | $200.00 |
| 0001-0090 | Median barrier MB-7F (502SD20-0038) | LF | 50 | $300.00 | $100.00 | $1,000.00 |
| 0001-0100 | NS saw cut H.C.C. items (full depth) (502SX20-0010) | LF | 50 | $10.00 | $30.00 | $100.00 |
| 0001-0110 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 50 | $300.00 | $800.00 | $1,500.00 |
| 0001-0120 | Guardrail GR-MGS1 (505SD20-0011) | LF | 5,200 | $30.00 | $30.00 | $50.00 |
| 0001-0130 | Guardrail GR-MGS1A (505SD20-0012) | LF | 75 | $52.00 | $40.00 | $70.00 |
| 0001-0140 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 1,500 | $40.00 | $37.50 | $60.00 |
| 0001-0150 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 75 | $37.20 | $40.00 | $55.00 |
| 0001-0160 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 45 | $41.00 | $40.00 | $65.00 |
| 0001-0170 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 46 | $3,000.00 | $6,300.00 | $6,000.00 |
| 0001-0180 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 5 | $1,500.00 | $2,700.00 | $2,000.00 |
| 0001-0190 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 42 | $1,200.00 | $2,000.00 | $2,000.00 |
| 0001-0200 | Guardrail GR-8A NCHRP 350 TL-3 (505SD20-0022) | LF | 25 | $50.00 | $15.00 | $50.00 |
| 0001-0210 | Guardrail GR-8B NCHRP 350 TL-3 (505SD20-0024) | LF | 75 | $45.00 | $15.00 | $70.00 |
| 0001-0220 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 15 | $50.00 | $30.00 | $200.00 |
| 0001-0230 | Guardrail terminal GR-7 NCHRP 350 (505SD20-0028) | EACH | 1 | $3,000.00 | $2,500.00 | $5,000.00 |
| 0001-0240 | Guardrail terminal GR-11 (505SD20-0029) | EACH | 1 | $1,400.00 | $1,175.00 | $2,000.00 |
| 0001-0250 | Guardrail GR-2 (505SD20-0030) | LF | 150 | $30.00 | $30.00 | $50.00 |
| 0001-0260 | Guardrail GR-2 8' post (505SD20-0032) | LF | 40 | $36.00 | $25.00 | $60.00 |
| 0001-0270 | Guardrail GR-2A (505SD20-0033) | LF | 50 | $42.00 | $25.00 | $70.00 |
| 0001-0280 | Rad. guardrail GR-2 (505SD20-0034) | LF | 50 | $42.00 | $30.00 | $55.00 |
| 0001-0290 | Alt.breakaway cable term. GR-9 (505SD20-0038) | EACH | 2 | $3,500.00 | $3,500.00 | $6,000.00 |
| 0001-0300 | Guardrail GR-10 (505SD20-0040) | LF | 50 | $60.00 | $50.00 | $60.00 |
| 0001-0310 | Fixed object attach. GR- foa-1 TY. I (505SD20-0045) | EACH | 2 | $2,700.00 | $3,600.00 | $4,000.00 |
| 0001-0320 | Fixed object attach. GR- foa-1 TY. II (505SD20-0046) | EACH | 1 | $700.00 | $600.00 | $1,000.00 |
| 0001-0330 | Fixed object attach. GR- foa-3 TY. I (505SD20-0047) | EACH | 1 | $2,700.00 | $2,600.00 | $4,000.00 |
| 0001-0340 | Fixed object attach. GR- foa-3 TY.II (505SD20-0048) | EACH | 1 | $800.00 | $600.00 | $1,000.00 |
| 0001-0350 | Fixed object attach. GR- foa-4 TY. I (505SD20-0050) | EACH | 1 | $4,500.00 | $500.00 | $6,000.00 |
| 0001-0360 | Fixed object attach. GR- foa-4 TY. II (505SD20-0051) | EACH | 1 | $3,700.00 | $500.00 | $5,000.00 |
| 0001-0370 | Fixed object attach. GR- foa-2 TY. I (505SD20-0053) | EACH | 4 | $3,200.00 | $3,600.00 | $4,000.00 |
| 0001-0380 | Fixed object attach. GR- foa-2 TY. II (505SD20-0054) | EACH | 2 | $800.00 | $600.00 | $1,000.00 |
| 0001-0390 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 2 | $4,000.00 | $5,800.00 | $5,000.00 |
| 0001-0400 | Median barrier MB-3 (505SD20-0059) | LF | 50 | $60.00 | $55.00 | $75.00 |
| 0001-0410 | Guardrail beam (505SD20-0071) | LF | 500 | $30.00 | $10.00 | $45.00 |
| 0001-0420 | Remove existing guardrail (505SD20-0073) | LF | 5,800 | $2.50 | $2.00 | $10.00 |
| 0001-0430 | Guardrail, thrie beam (505SD20-0074) | LF | 75 | $35.00 | $20.00 | $60.00 |
| 0001-0440 | W beam end sect rounded (505SP20-0005) | EACH | 5 | $72.00 | $80.00 | $100.00 |
| 0001-0450 | Rub rail (505SP20-0008) | LF | 50 | $20.00 | $5.00 | $50.00 |
| 0001-0460 | Offset block (505SP20-0012) | EACH | 10 | $100.00 | $45.00 | $50.00 |
| 0001-0470 | NS guardrail post leave out (505SX20-0004) | EACH | 100 | $40.00 | $25.00 | $200.00 |
| 0001-0480 | NS guardrail ter. site preparation 4-FT moderate (505SX20-0004) | EACH | 10 | $500.00 | $150.00 | $2,000.00 |
| 0001-0490 | NS guardrail ter. site preparation 6-FT moderate (505SX20-0004) | EACH | 15 | $600.00 | $150.00 | $2,000.00 |
| 0001-0500 | NS guardrail ter. site preparation minor (505SX20-0004) | EACH | 20 | $600.00 | $150.00 | $2,000.00 |
| 0001-0510 | NS guardrail beam bridge rail (505SX20-0005) | LF | 75 | $70.00 | $45.00 | $200.00 |
| 0001-0520 | NS guardrail GR-2, 10' post (505SX20-0005) | LF | 40 | $40.00 | $30.00 | $80.00 |
| 0001-0530 | NS SP. des. GR.BR.attach BR-GR type 1 (run on) (505SX20-0044) | EACH | 1 | $6,500.00 | $9,800.00 | $10,000 |
| 0001-0540 | NS SP. des. GR.BR.attach BR-GR type 2 (run off) (505SX20-0044) | EACH | 3 | $3,000.00 | $500.00 | $2,000.00 |
| 0001-0550 | NS guardrail bull nose barrier (gore) (505SX20-0058) | EACH | 1 | $10,000 | $2,500.00 | $15,000 |
| 0001-0560 | NS guardrail bull nose barrier (median) (505SX20-0058) | EACH | 1 | $10,000 | $2,500.00 | $15,000 |
| 0001-0570 | NS guardrail post 10' (505SX20-0058) | EACH | 5 | $145.00 | $100.00 | $225.00 |
| 0001-0580 | NS guardrail post 6' (505SX20-0058) | EACH | 5 | $90.00 | $105.00 | $150.00 |
| 0001-0590 | NS guardrail post 8' (505SX20-0058) | EACH | 5 | $110.00 | $110.00 | $175.00 |
| 0001-0600 | NS guardrail post 9' (505SX20-0058) | EACH | 5 | $135.00 | $130.00 | $200.00 |
| 0001-0610 | NS guardrail terminal cat 350 (505SX20-0058) | EACH | 1 | $6,500.00 | $5,000.00 | $10,000 |
| 0001-0620 | Remove comb. curb and gutter (510SX20-0002) | LF | 125 | $25.00 | $35.00 | $100.00 |
| 0001-0630 | NS relocate exist. ground mounted sign STR. & sign panel (510SX20-0042) | EACH | 2 | $500.00 | $350.00 | $2,500.00 |
| 0001-0640 | Truck mounted attenuator (512SD20-0023) | HR | 2,000 | $0.01 | $0.01 | $50.00 |
| 0001-0650 | Group 2 channelizing devices (512SD20-0024) | DAY | 2,000 | $0.01 | $0.01 | $10.00 |
| 0001-0660 | Port.changeable mess. sign (512SD20-0025) | HR | 50 | $0.01 | $5.00 | $10.00 |
| 0001-0670 | Electronic arrow board (512SD20-0026) | HR | 50 | $0.01 | $0.01 | $10.00 |
| 0001-0680 | Flagger service (512SD20-0027) | HR | 250 | $50.00 | $55.00 | $50.00 |
| 0001-0690 | Portable temporary rumble strip array (512SP20-0001) | DAY | 50 | $100.00 | $5.00 | $500.00 |
| 0001-0700 | NS police patrol uniformed flaggers (512SX20-0040) | HR | 8 | $85.00 | $150.00 | $250.00 |
| 0001-0710 | NS mobilization on-call task order greater than $75,000.00 (eastern shore) (513SX20-0001) | EACH | 2 | $2,500.00 | $2,500.00 | $3,750.00 |
| 0001-0720 | NS mobilization on-call task order greater than $75,000.00 (hampton roads) (513SX20-0001) | EACH | 2 | $2,500.00 | $0.01 | $3,750.00 |
| 0001-0730 | NS mobilization on-call task order less than $75,000.00 (eastern shore) (513SX20-0001) | EACH | 4 | $2,500.00 | $2,500.00 | $7,500.00 |
| 0001-0740 | NS mobilization on-call task order less than $75,000.00 (hampton roads) (513SX20-0001) | EACH | 2 | $2,500.00 | $0.01 | $7,500.00 |
| 0001-0750 | NS utilities hand dig and install guardrail post (520SX20-0013) | EACH | 25 | $250.00 | $425.00 | $500.00 |
| 0001-0760 | NS utilities test pit excavation (non paved areas) (520SX20-0013) | EACH | 3 | $250.00 | $50.00 | $500.00 |
| 0001-0770 | NS utilities test pit excavation (paved areas) (520SX20-0013) | EACH | 3 | $250.00 | $50.00 | $500.00 |
| 0001-0780 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 250 | $2.00 | $0.30 | $20.00 |
| 0001-0790 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 2 | $1,500.00 | $600.00 | $2,500.00 |
| 0001-0800 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 2 | $1,500.00 | $600.00 | $2,500.00 |
| 0001-0810 | Guardrail delineator (702SD20-0001) | EACH | 25 | $15.00 | $35.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.