VDOT contract C0000117418B28 bid tabulation
Bridge rehabilitation. Let by Virginia DOT on February 25, 2026, Virginia Beach City, Hampton Roads. 4 bids received; low bid $1,898,250 by OTB ASSOCIATES, LLC dba OTB CONTRACTING.
- Owner
- Virginia DOT
- Letting
- 25 FEB 2026
- Pay items
- 38
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | OTB ASSOCIATES, LLC dba OTB CONTRACTING | $1,898,250 | Low |
| 2 | Freyssinet, Inc. | $2,370,083 | +25% |
| 3 | Curtis Contracting, Inc. | $2,889,865 | +52% |
| 4 | Allan Myers Va, Inc. | $2,957,775 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. OTB ASSOCIATES, LLC dba OTB CONTRACTING | 2. Freyssinet, Inc. | 3. Curtis Contracting, Inc. | 4. Allan Myers Va, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | NS struct. steel struct. steel ASTM A709 grade 36 - span C beam 20 web crack and flange repair (407SX20-0003) | LS | 1 | $100,000 | $75,600 | $101,051 | $105,000 |
| 0001-0020 | NS struct. steel struc. steel ASTM A709 grade 36 - span C bay 19 diaphragm connec. plate replace. (407SX20-0006) | LB | 1 | $15,000 | $4,740.00 | $41,531 | $40,000 |
| 0001-0030 | NS struct. steel struct. steel ASTM A709 grade 36 - span C bay 9 diaphragm connec. plate replace (407SX20-0006) | LB | 1 | $15,000 | $5,590.00 | $41,893 | $40,000 |
| 0001-0040 | NS pre. & spot coat EX. STR. failing coating and impact damaged coating, scrapes and gouges on span C bay 19 (411SX20-0001) | SF | 761 | $150.00 | $220.00 | $120.00 | $150.00 |
| 0001-0050 | NS pre. & spot coat EX. STR. span C beam 10 bottom flange and span C bay 9 diaphragm connection plate repairs (411SX20-0001) | SF | 24 | $150.00 | $220.00 | $114.00 | $150.00 |
| 0001-0060 | NS pre. & spot coat EX. STR. span C beam 20 web crack repair and flange repair (411SX20-0001) | SF | 93 | $150.00 | $220.00 | $125.00 | $150.00 |
| 0001-0070 | NS zone coat. EX. STR. coat beam ends per plan including beams stiffeners and diaphragms (411SX20-0002) | LS | 1 | $215,000 | $206,000 | $350,000 | $226,998 |
| 0001-0080 | NS disposal of material (STR. no. 22232) (411SX20-0006) | LS | 1 | $12,500 | $31,600 | $16,262 | $95,000 |
| 0001-0090 | Anchor bolt replacement (412SD20-0010) | EACH | 2 | $4,500.00 | $540.00 | $8,757.91 | $15,000 |
| 0001-0100 | Crack repair type B (412SD20-0013) | LF | 147 | $100.00 | $125.00 | $159.04 | $500.00 |
| 0001-0110 | Embedded galvanic anodes (412SD20-0017) | EACH | 637 | $50.00 | $110.00 | $77.57 | $110.00 |
| 0001-0120 | Concrete substruct. surface repair (412SD20-0061) | SY | 44 | $2,000.00 | $3,130.00 | $5,653.28 | $8,000.00 |
| 0001-0130 | NS BR.superstr. wid./repair grinding minor defect on span C beam 10 bottom flange (412SX20-0009) | EACH | 1 | $4,000.00 | $675.00 | $13,143 | $15,000 |
| 0001-0140 | NS BR.superstr. wid./repair grinding minor defect over right travel lane (412SX20-0009) | EACH | 2 | $2,000.00 | $675.00 | $13,143 | $15,000 |
| 0001-0150 | NS BR.superstr. wid./repair jacking and blocking beam - for type B1 bearing repair and anchor bolt replace (412SX20-0009) | EACH | 12 | $15,000 | $12,700 | $20,000 | $25,000 |
| 0001-0160 | NS BR.superstr. wid./repair jacking and blocking beam - span C beam 20 at pier 3 (412SX20-0009) | EACH | 1 | $30,000 | $11,900 | $21,097 | $40,000 |
| 0001-0170 | NS BR.superstr. wid./repair reinstall existing diaphragm - span C bay 19 first intermediate diaphragm (412SX20-0012) | LB | 300 | $20.00 | $6.50 | $200.30 | $30.00 |
| 0001-0180 | NS BR.superstr. wid./repair reinstall existing diaphragms - span C bay 19 second intermediate diaphragm (412SX20-0012) | LB | 300 | $20.00 | $6.50 | $200.30 | $30.00 |
| 0001-0190 | NS BR.superstr. wid./repair reinstall existing diaphragms - span C bay 9 first intermediate diaphragm (412SX20-0012) | LB | 200 | $20.00 | $7.00 | $302.27 | $55.00 |
| 0001-0200 | NS BR.superstr. wid./repair structural steel heat-straightening - span C beam 20 (412SX20-0013) | LS | 1 | $200,000 | $430,000 | $100,000 | $135,000 |
| 0001-0210 | NS BR.superstr. wid./repair structural steel heat-straightening - span C beam 20 over left turn lane (412SX20-0013) | LS | 1 | $115,000 | $361,000 | $100,000 | $135,000 |
| 0001-0220 | NS env.& worker protect. (STR. no. 22232) (413SX20-0003) | LS | 1 | $25,000 | $63,300 | $32,525 | $35,000 |
| 0001-0230 | NS rem. port.of EX.STR. material removal for span beam 20 web crack repair and flange repair (413SX20-0005) | LS | 1 | $15,000 | $2,700.00 | $62,653 | $5,000.00 |
| 0001-0240 | NS rem. port.of EX.STR. material removal for span C bay 9 diaphragm connection plate replacement (413SX20-0005) | LS | 1 | $10,000 | $450.00 | $11,598 | $10,000 |
| 0001-0250 | NS rem. port.of EX.STR. structural steel removal for other repairs (413SX20-0005) | LS | 1 | $45,000 | $3.00 | $11,598 | $108,257 |
| 0001-0260 | Replace bearing (426SD20-0001) | EACH | 1 | $70,000 | $116,865 | $87,174 | $100,000 |
| 0001-0270 | Reset exist. rocker expn. bearing (426SD20-0002) | EACH | 12 | $4,500.00 | $4,680.00 | $21,520 | $7,500.00 |
| 0001-0280 | Grinding minor defect (426SD20-0005) | EACH | 10 | $2,000.00 | $675.00 | $5,798.83 | $3,000.00 |
| 0001-0290 | Partial beam/girder replacement beam 20 web window repair (426SD20-0009) | LB | 30 | $50.00 | $58.00 | $444.05 | $2,500.00 |
| 0001-0300 | NS field welding-full penetration groove beam 20 web repair weld (426SX20-0004) | LF | 3 | $15,000 | $4,220.00 | $3,252.47 | $5,000.00 |
| 0001-0310 | NS nbis access, under bridge (STR. no. 22232) (430SX20-0001) | DAY | 4 | $4,000.00 | $965.00 | $3,370.53 | $4,000.00 |
| 0001-0320 | Temporary sign (512SD20-0014) | SF | 1,400 | $20.00 | $35.00 | $56.92 | $35.00 |
| 0001-0330 | Truck mounted attenuator (512SD20-0023) | HR | 1,400 | $80.00 | $79.00 | $10.00 | $175.00 |
| 0001-0340 | Group 2 channelizing devices (512SD20-0024) | DAY | 37,000 | $2.00 | $0.50 | $0.43 | $1.25 |
| 0001-0350 | Port.changeable mess. sign (512SD20-0025) | HR | 1,400 | $25.00 | $14.00 | $25.00 | $20.00 |
| 0001-0360 | Electronic arrow board (512SD20-0026) | HR | 1,400 | $15.00 | $8.50 | $8.13 | $20.00 |
| 0001-0370 | Mobilization (513SD20-0001) | LS | 1 | $135,000 | $116,135 | $174,000 | $179,000 |
| 0001-0380 | Construction surveying constr. (517SD20-0001) | LS | 1 | $10,000 | $73,300 | $324,918 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.