Ken Construction Co., Inc.: VDOT bid record
Ken Construction Co., Inc. submitted 116 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 22 JUL 2026, and was the low bidder on 33 of them (28%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $11,740,564
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 14 | 4 | 29% |
| 2003 | 11 | 4 | 36% |
| 2004 | 9 | 4 | 44% |
| 2005 | 8 | 3 | 38% |
| 2006 | 11 | 0 | 0% |
| 2007 | 7 | 2 | 29% |
| 2008 | 3 | 1 | 33% |
| 2009 | 2 | 1 | 50% |
| 2010 | 4 | 1 | 25% |
| 2011 | 5 | 2 | 40% |
| 2012 | 4 | 1 | 25% |
| 2013 | 10 | 5 | 50% |
| 2015 | 4 | 1 | 25% |
| 2016 | 9 | 2 | 22% |
| 2017 | 4 | 0 | 0% |
| 2018 | 2 | 0 | 0% |
| 2019 | 3 | 1 | 33% |
| 2020 | 3 | 1 | 33% |
| 2021 | 1 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt concrete TY. SM-12.5A | 315SD20-0001 | TON | 70 | 40 (57%) | $200.00 | $137.70 |
| Guardrail GR-2 | 505SD20-0030 | LF | 60 | 37 (62%) | $18.60 | $18.00 |
| Alt.breakaway cable term. GR-9 | 505SD20-0038 | EACH | 62 | 36 (58%) | $2,500.00 | $2,425.00 |
| Concrete substruct. surface repair | 412SD20-0061 | SY | 40 | 27 (68%) | $800.00 | $1,000.00 |
| Fixed object attach. GR-foa-1 TY. I | 505SD20-0045 | EACH | 51 | 26 (51%) | $2,300.00 | $2,000.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 71 | 22 (31%) | $1.00 | $1.00 |
| Rad. guardrail GR-2 | 505SD20-0034 | LF | 42 | 22 (52%) | $19.85 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 75 | 20 (27%) | $4.00 | $3.00 |
| Legume seed | 603SD20-0005 | LB | 23 | 20 (87%) | $18.00 | $21.00 |
| Asphalt concrete BM-25.0 | 315SD20-0010 | TON | 33 | 18 (55%) | $160.00 | $124.00 |
| Lime | 603SD20-0017 | TON | 30 | 17 (57%) | $125.00 | $200.00 |
| Warning light TY. A | 512SD20-0028 | DAY | 38 | 16 (42%) | $0.50 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elk Knob, Inc. | 66 | 41 of 66 |
| Patrick Construction, Inc. | 30 | 21 of 30 |
| Cleco Corporation | 18 | 10 of 18 |
| Estes Bros. Const., Inc. | 16 | 11 of 16 |
| Crossroads Bridge Inc | 14 | 6 of 14 |
| Lanford Brothers Company, Incorporated | 13 | 5 of 13 |
| Fort Chiswell Construction Corporation | 7 | 1 of 7 |
| W-L Construction & Paving, Inc. | 7 | 5 of 7 |
| Glass Machinery and Excavation, Inc. | 6 | 5 of 6 |
| King General Contractors, Inc. | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000121138B52 | Bristol | Sgr - bridge replacment over n.f. clinch river | 3 of 5 | $1,539,324 | +23% |
| 22 APR 2026 | C0000117081B10 | Bristol | Sgr - bridge rehabilitation | 4 of 5 | $1,003,045 | +84% |
| 15 DEC 2021 | C0000113885N01 | Bristol | Sgr - bridge rehab over north fork holston river | 3 of 3 | $516,394 | +30% |
| 16 DEC 2020 | C0000113878B08 | Bristol | Sgr - bridge superstructure replacement | 3 of 3 | $368,591 | +9.0% |
| 26 AUG 2020 | C0000113875B01 | Bristol | Sgr - bridge replacement over bluestone river | 3 of 3 | $408,181 | +15% |
| 22 JUL 2020 | C0000113877B04 | Bristol | Sgr - bridge replacement on pisgah rd. over fairground creek | 1 of 3 | $474,216 | Low, 14% under the second |
| 23 OCT 2019 | C0000110951B52 | Bristol | Bridge replacement over big wilson creek | 3 of 3 | $590,477 | +1.0% |
| 26 JUN 2019 | C0000111264B61 | Bristol | Sgr - bridge superstr. replacement over s. fork clinch river | 2 of 3 | $696,316 | +20% |
| 27 FEB 2019 | C000109672B08B | Bristol | Bridge replacement over laurel branch | 1 of 3 | $437,184 | Low, 6.0% under the second |
| 14 NOV 2018 | C0000104773B54 | Bristol | Deck replacement over little river | 2 of 3 | $1,372,297 | +3.0% |
| 26 SEP 2018 | C000105145B671 | Bristol | Bridge replacement - over wolf creek | 2 of 3 | $1,076,300 | +6.0% |
| 26 APR 2017 | C000109861N01 | Bristol | On-call ada compliance curb ramp improvements | 3 of 3 | $206,294 | +39% |
| 25 JAN 2017 | C0000103500B46 | Bristol | Bridge replacement on rte. 671 over valley creek road | 3 of 3 | $589,659 | +51% |
| 25 JAN 2017 | C0000103557B11 | Bristol | Superstructure replacement rt. 16 over slemp creek | 3 of 3 | $507,243 | +8.0% |
| 25 JAN 2017 | C000105559B64 | Bristol | Superstr. repl. - rte. 58 over town branch at jonesville | 3 of 3 | $516,148 | +39% |
| 21 DEC 2016 | C0000103553B61 | Bristol | Proposed bridge on rte 637 (carlock road) over carlock creek | 2 of 3 | $775,052 | +23% |
| 21 DEC 2016 | C0000104449B55 | Bristol | Superstructure replacement rte. 623 over little creek | 1 of 3 | $242,386 | Low, 34% under the second |
| 21 DEC 2016 | C000103501B59 | Bristol | Superstr. repl. - rte. 610 over tributary to mchenry creek | 3 of 3 | $344,563 | +58% |
| 21 DEC 2016 | C000103552B53 | Bristol | Superstructure replacement - rte. 16 over jacobs fork creek | 1 of 2 | $426,347 | Low, 7.0% under the second |
| 16 NOV 2016 | C00101383C01 | Bristol | Bridge replacement over little walker creek | 2 of 3 | $987,489 | +1.0% |
| 27 JUL 2016 | C000081334C501 | Bristol | Road realignment along palmer ave. in saltville | 2 of 3 | $334,951 | 0.0% |
| 25 MAY 2016 | C000103502B45 | Bristol | Rte. 102 - bridge replacement over laurel fork | 2 of 3 | $1,310,238 | +36% |
| 03 FEB 2016 | C0000086479B64 | Bristol | Superstructure replacement on route 611 | 3 of 3 | $523,402 | +21% |
| 03 FEB 2016 | C0000086596B39 | Bristol | Bridge replacement over little walker creek and approaches | 2 of 3 | $1,182,280 | +11% |
| 16 DEC 2015 | C0000104447B49 | Bristol | Superstructure replacement over maiden spring creek and appr | 1 of 3 | $316,221 | Low, 12% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.