VDOT contract C0000121138B52 bid tabulation
Sgr - bridge replacment over n.f. clinch river. Let by Virginia DOT on July 22, 2026, Scott, Bristol. 5 bids received; low bid $1,248,910 by Elk Knob, Inc..
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 60
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Elk Knob, Inc. | $1,248,910 | Low |
| 2 | King General Contractors, Inc. | $1,535,251 | +23% |
| 3 | Ken Construction Co., Inc. | $1,539,324 | +23% |
| 4 | Glass Machinery and Excavation, Inc. | $1,624,146 | +30% |
| 5 | Jones Road & Bridge, Inc. | $1,887,921 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Elk Knob, Inc. | 2. King General Contractors, Inc. | 3. Ken Construction Co., Inc. | 4. Glass Machinery and Excavation, Inc. | 5. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $2,500.00 | $80,630 | $40,000 | $40,000 | $9,799.00 |
| 0001-0020 | Bedding matl. aggr. no. 57 (302SD20-0002) | TON | 614 | $39.00 | $73.36 | $29.54 | $54.00 | $68.00 |
| 0001-0030 | 24" pipe (302SD20-0037) | LF | 27 | $240.00 | $228.27 | $111.77 | $130.90 | $189.00 |
| 0001-0040 | 30" pipe (302SD20-0047) | LF | 22 | $375.00 | $264.86 | $95.67 | $164.19 | $221.00 |
| 0001-0050 | 24" end section ES-1 or 2 (302SD20-0204) | EACH | 2 | $500.00 | $505.90 | $500.00 | $2,515.82 | $1,881.00 |
| 0001-0060 | 30" end section ES-1 or 2 (302SD20-0208) | EACH | 2 | $750.00 | $937.02 | $750.00 | $2,901.19 | $2,201.00 |
| 0001-0070 | Regular excavation (303SD20-0001) | CY | 383 | $40.00 | $95.29 | $35.00 | $29.60 | $88.00 |
| 0001-0080 | Borrow excavation (303SD20-0007) | CY | 824 | $65.00 | $47.69 | $35.00 | $30.25 | $88.00 |
| 0001-0090 | Check dam rock TY. II (303SD20-0023) | EACH | 12 | $500.00 | $613.43 | $250.00 | $547.80 | $1,200.00 |
| 0001-0100 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $2,500.00 | $1,876.48 | $2,500.00 | $4,000.00 | $1,000.00 |
| 0001-0110 | Siltation control excavation (303SD20-0029) | CY | 133 | $1.00 | $6.60 | $1.00 | $5.00 | $0.01 |
| 0001-0120 | Temp. silt fence type A (303SD20-0034) | LF | 760 | $5.00 | $14.21 | $7.00 | $7.33 | $5.00 |
| 0001-0130 | Aggr. base matl. TY. I no. 21A (308SD20-0011) | TON | 415 | $53.00 | $88.90 | $35.64 | $50.26 | $69.00 |
| 0001-0140 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 15 | $1,187.21 | $403.15 | $1,032.35 | $275.00 | $800.00 |
| 0001-0150 | Structure excavation const. (401SD20-0001) | CY | 796 | $75.00 | $87.96 | $39.00 | $87.43 | $80.00 |
| 0001-0160 | Select backfill abutment zone (401SD20-0002) | TON | 335 | $46.00 | $56.65 | $36.64 | $65.00 | $68.00 |
| 0001-0170 | Geocomposite wall drain (401SD20-0004) | SY | 78 | $45.00 | $83.56 | $104.00 | $28.40 | $35.00 |
| 0001-0180 | Pipe underdrain 6" const. (401SD20-0005) | LF | 42 | $32.00 | $46.18 | $20.00 | $47.56 | $60.00 |
| 0001-0190 | Cofferdam (401SD20-0007) | EACH | 2 | $17,500 | $104,819 | $24,750 | $18,000 | $10,000 |
| 0001-0200 | Conc. CL. A4 mod. low shrink., SPR. struct. const. (404SD20-0005) | CY | 80.20 | $2,400.00 | $2,225.86 | $2,985.31 | $4,300.00 | $6,300.00 |
| 0001-0210 | Bridge deck grooving const. (404SD20-0009) | SY | 125 | $55.20 | $61.57 | $75.00 | $62.40 | $50.00 |
| 0001-0220 | Cover depth survey const. (404SD20-0010) | SY | 125 | $50.00 | $33.42 | $15.00 | $26.68 | $20.00 |
| 0001-0230 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 121 | $1,850.00 | $687.36 | $1,200.00 | $2,100.00 | $2,800.00 |
| 0001-0240 | NS concrete class A3 - subfooter (404SX20-0001) | CY | 31.60 | $1,200.00 | $360.64 | $790.00 | $1,000.00 | $1,900.00 |
| 0001-0250 | CR reinf. steel CL. I SPR. struct. const. (406SD20-0003) | LB | 18,980 | $4.25 | $3.08 | $5.00 | $3.95 | $10.00 |
| 0001-0260 | Reinforcing steel substruct. const. (406SD20-0006) | LB | 6,590 | $2.00 | $1.74 | $3.95 | $3.10 | $10.50 |
| 0001-0270 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 3,790 | $4.00 | $3.36 | $5.00 | $3.95 | $11.00 |
| 0001-0280 | NS dism. & rem. exist. STR. structure number 6039 (413SX20-0002) | LS | 1 | $69,500 | $87,960 | $369,480 | $168,310 | $5,000.00 |
| 0001-0290 | NS env.& worker protect. structure number 6039 (413SX20-0003) | LS | 1 | $10,350 | $10,995 | $15,000 | $11,050 | $5,000.00 |
| 0001-0300 | NS material disposal structure number 6039, type B (413SX20-0004) | LS | 1 | $3,450.00 | $7,330.00 | $8,000.00 | $1,950.00 | $5,000.00 |
| 0001-0310 | Dry riprap CL.II 38" (414SD20-0057) | TON | 456 | $58.75 | $92.06 | $42.00 | $62.98 | $200.00 |
| 0001-0320 | Guardrail, thrie beam (505SD20-0074) | LF | 188 | $395.00 | $586.40 | $275.00 | $500.00 | $200.00 |
| 0001-0330 | Fence FE-W1 (507SD20-0001) | LF | 296 | $34.50 | $43.98 | $10.00 | $33.00 | $55.00 |
| 0001-0340 | Line brace unit FE-W1 or FE-W2 (507SD20-0003) | EACH | 3 | $2,300.00 | $2,932.00 | $200.00 | $2,200.00 | $1,000.00 |
| 0001-0350 | Corner brace unit FE-W1 or FE-W2 (507SD20-0004) | EACH | 4 | $2,300.00 | $2,932.00 | $250.00 | $2,200.00 | $1,000.00 |
| 0001-0360 | Gate FE-G 16' (507SD20-0023) | EACH | 1 | $4,025.00 | $5,131.00 | $320.00 | $3,850.00 | $1,000.00 |
| 0001-0370 | Allaying dust (511SD20-0001) | HR | 150 | $30.00 | $7.33 | $1.00 | $20.00 | $20.00 |
| 0001-0380 | Type 3 barricade 4' (512SD20-0012) | EACH | 4 | $500.00 | $489.64 | $600.00 | $292.50 | $600.00 |
| 0001-0390 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $650.00 | $567.34 | $600.00 | $364.00 | $900.00 |
| 0001-0400 | Temporary sign (512SD20-0014) | SF | 382 | $40.00 | $30.79 | $27.00 | $25.00 | $32.00 |
| 0001-0410 | Group 2 channelizing devices (512SD20-0024) | DAY | 1,000 | $4.00 | $5.13 | $1.00 | $2.50 | $2.00 |
| 0001-0420 | Warning light TY. B (512SD20-0029) | DAY | 2,160 | $4.00 | $8.94 | $5.00 | $3.00 | $1.00 |
| 0001-0430 | Mobilization (513SD20-0001) | LS | 1 | $90,000 | $157,302 | $193,000 | $150,000 | $80,000 |
| 0001-0440 | Construction surveying constr. (517SD20-0001) | LS | 1 | $15,000 | $36,650 | $15,000 | $35,000 | $12,000 |
| 0001-0450 | Topsoil class A (602SD20-0002) | CY | 30 | $100.00 | $265.35 | $30.00 | $38.50 | $90.00 |
| 0001-0460 | Topsoil class B (602SD20-0004) | CY | 30 | $200.00 | $302.00 | $30.00 | $38.50 | $90.00 |
| 0001-0470 | Temporary seed (603SD20-0002) | LB | 300 | $13.80 | $18.47 | $12.00 | $13.20 | $12.00 |
| 0001-0480 | Regular seed (603SD20-0003) | LB | 300 | $13.80 | $18.47 | $12.00 | $13.20 | $12.00 |
| 0001-0490 | Overseeding (603SD20-0004) | LB | 12 | $13.80 | $18.47 | $12.00 | $13.20 | $12.00 |
| 0001-0500 | Legume seed (603SD20-0005) | LB | 1 | $20.70 | $27.72 | $18.00 | $19.80 | $18.00 |
| 0001-0510 | Legume overseeding (603SD20-0006) | LB | 1 | $20.70 | $27.72 | $18.00 | $19.80 | $18.00 |
| 0001-0520 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 10,104 | $1.00 | $1.16 | $0.75 | $0.83 | $2.00 |
| 0001-0530 | Fertilizer nitrogen - N (603SD20-0014) | LB | 46 | $2.59 | $3.42 | $2.25 | $2.48 | $5.00 |
| 0001-0540 | Fertilizer phosphorous - P (603SD20-0015) | LB | 44 | $2.59 | $3.42 | $2.25 | $2.48 | $5.00 |
| 0001-0550 | Fertilizer potassium - K (603SD20-0016) | LB | 44 | $2.59 | $3.42 | $2.25 | $2.48 | $5.00 |
| 0001-0560 | Lime (603SD20-0017) | TON | 4.24 | $161.00 | $215.56 | $140.00 | $154.00 | $400.00 |
| 0001-0570 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 141 | $6.00 | $6.93 | $4.50 | $4.95 | $6.00 |
| 0001-0580 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 40 | $22.88 | $35.46 | $19.80 | $25.86 | $40.00 |
| 0001-0590 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 4 | $680.80 | $394.76 | $592.00 | $769.60 | $550.00 |
| 0001-0600 | Sign panel (701SD20-0001) | SF | 12 | $36.42 | $30.42 | $31.67 | $41.17 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.