W. C. English, Incorporated submitted 61 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 24 JUN 2026, and was the low bidder on 11 of them (18%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $41,826,683
- Latest bid
- 24 JUN 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 3 | 1 | 33% |
| 2003 | 7 | 1 | 14% |
| 2004 | 12 | 4 | 33% |
| 2005 | 2 | 0 | 0% |
| 2006 | 3 | 0 | 0% |
| 2007 | 7 | 2 | 29% |
| 2008 | 4 | 0 | 0% |
| 2009 | 1 | 0 | 0% |
| 2010 | 2 | 0 | 0% |
| 2011 | 3 | 1 | 33% |
| 2014 | 2 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2018 | 2 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 4 | 1 | 25% |
| 2021 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lynchburg | 22 | 3 | 14% |
| Richmond | 13 | 1 | 8% |
| Salem | 8 | 3 | 38% |
| Hampton Roads | 6 | 1 | 17% |
| Bristol | 4 | 1 | 25% |
| Staunton | 3 | 1 | 33% |
| Culpeper | 3 | 1 | 33% |
| Fredericksburg | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Group 2 channelizing devices | 512SD20-0024 | DAY | 49 | 19 (39%) | $1.00 | $1.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 48 | 17 (35%) | $3.00 | $3.00 |
| Regular seed | 603SD20-0003 | LB | 47 | 17 (36%) | $13.20 | $13.50 |
| Lime | 603SD20-0017 | TON | 48 | 16 (33%) | $200.00 | $200.00 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 55 | 15 (27%) | $2,200.00 | $2,000.00 |
| Slope drain | 303SD20-0018 | EACH | 23 | 15 (65%) | $375.00 | $577.35 |
| Truck mounted attenuator | 512SD20-0023 | HR | 18 | 15 (83%) | $10.00 | $20.00 |
| Flagger service | 512SD20-0027 | HR | 45 | 14 (31%) | $20.00 | $20.00 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 45 | 14 (31%) | $300.00 | $250.00 |
| Dewatering basin EC-8 | 303SD20-0028 | EACH | 35 | 13 (37%) | $1,021.00 | $1,000.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 34 | 13 (38%) | $22.00 | $26.00 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 31 | 13 (42%) | $50.00 | $54.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| DLB, Inc. | 8 | 4 of 8 |
| Burleigh Construction Co., Inc. | 7 | 4 of 7 |
| Key Construction Company, Incorporated | 5 | 3 of 5 |
| Haymes Brothers, Inc. | 4 | 3 of 4 |
| Allegheny Construction Company, Inc. | 4 | 2 of 4 |
| Curtis Contracting, Inc. | 4 | 3 of 4 |
| Pearson Construction, Inc. | 4 | 4 of 4 |
| Suburban Grading & Utilities, Inc. | 3 | 2 of 3 |
| Clary Construction Co., Inc. | 3 | 3 of 3 |
| Bishop and Settle Construction Company, Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUN 2026 | C0000123944C01 | Lynchburg | Smart scale - roadway improvements | 2 of 2 | $3,813,066 | +33% |
| 22 APR 2026 | C0000119163C01 | Lynchburg | Smart scale - roundabout | 2 of 2 | $7,909,222 | +3.0% |
| 04 FEB 2026 | C0000119451M01 | Salem | Smart scale - intersection improvements | 1 of 3 | $4,512,140 | Low, 7.0% under the second |
| 04 FEB 2026 | C0000119190C01 | Richmond | Smart scale - intersection improvements | 2 of 2 | $3,476,232 | +34% |
| 17 DEC 2025 | C0000119452C50 | Salem | Smart scale - intersection improvements/ lane addition | 5 of 5 | $3,455,500 | +39% |
| 27 OCT 2021 | C000109550C01B | Lynchburg | Smart scale - road reconstruction | 2 of 2 | $4,505,934 | +37% |
| 16 DEC 2020 | C0000104946C01 | Lynchburg | Smart scale - grade, drain and pave: passing lane | 3 of 3 | $15,830,940 | +12% |
| 18 NOV 2020 | C0000109419C01 | Bristol | Smart scale* - i-81 exit 17 interchange improvements | 3 of 3 | $16,240,080 | +25% |
| 21 OCT 2020 | C0000101043B60 | Lynchburg | Bridge rehabilitation over williams run | 2 of 3 | $921,817 | +22% |
| 26 FEB 2020 | C0000108907C01 | Salem | Smart scale - road realignment | 1 of 3 | $9,579,065 | Low, 16% under the second |
| 18 DEC 2019 | C0000108906C01 | Salem | Smart scale*-auxiliary lane additions & interstate paving | 2 of 2 | $32,391,250 | +19% |
| 28 MAR 2018 | C000108909M01 | Salem | Route 460 at franklin street eb ramp construction | 3 of 3 | $1,196,993 | +11% |
| 24 JAN 2018 | C0000103815M01 | Lynchburg | Median barrier upgrade rte. 29 business (madison heights) | 3 of 3 | $2,859,755 | +8.0% |
| 26 OCT 2016 | C0000107867C01 | Richmond | Bridge replacement rte. 5 (e.main st.) | 2 of 2 | $4,550,626 | +69% |
| 25 FEB 2015 | C00075910C02 | Salem | Route 11, 220, 220a access management at i-81, exit 150 | 2 of 3 | $18,054,470 | +1.0% |
| 17 DEC 2014 | C00077385C01 | Staunton | Route 29/route 666 interchange | 3 of 3 | $20,498,080 | +10% |
| 23 JUL 2014 | C00086836C01 | Richmond | Town of victoria rte 40/49 roadway improvements | 2 of 3 | $1,710,930 | +6.0% |
| 22 JUN 2011 | C00081562DB2 | Richmond | Rte 5- virginia capital trail-sherwood forest phase | 3 of 3 | $12,080,500 | +37% |
| 25 MAY 2011 | C00093095B34 | Richmond | Bh-br04(235)(nfo)0156-043-738,m501,b634 | 2 of 3 | $595,706 | +5.0% |
| 27 APR 2011 | C00017508C01 | Bristol | 0.52 mi. grade, drain, asp. pave. & utilities | 1 of 3 | $2,029,088 | Low, 10% under the second |
| 27 OCT 2010 | C00088763C01 | Bristol | 0.519 mi. grade, drain, asp. pave. & util. | 3 of 3 | $2,797,101 | +46% |
| 27 JAN 2010 | C0015487C01 | Culpeper | Construct new 2 lane road with pedestrian path | 3 of 3 | $3,480,835 | +3.0% |
| 08 JUL 2009 | C00013511C01 | Lynchburg | Franklin turnpike extension; grade, drain, asphalt pave | 2 of 3 | $18,544,260 | +1.0% |
| 22 OCT 2008 | C00081853M01 | Fredericksburg | Construct left turn lane | 2 of 3 | $320,826 | +3.0% |
| 26 MAR 2008 | C0085212N01 | Lynchburg | 0.389 mi. grade, drain, asp. pave. , & temp br. | 2 of 3 | $1,293,542 | +15% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.