VDOT contract C0000119451M01 bid tabulation
Smart scale - intersection improvements. Let by Virginia DOT on February 4, 2026, Patrick, Salem. 3 bids received; low bid $4,512,140 by W. C. English, Incorporated.
- Owner
- Virginia DOT
- Letting
- 04 FEB 2026
- Pay items
- 120
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | W. C. English, Incorporated | $4,512,140 | Low |
| 2 | Haymes Brothers, Inc. | $4,825,320 | +7.0% |
| 3 | Jones Road & Bridge, Inc. | $5,950,816 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. W. C. English, Incorporated | 2. Haymes Brothers, Inc. | 3. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $665,301 | $300,000 | $500,000 |
| 0001-0020 | Bedding matl.aggr.no. 25 or 26 (302SD20-0001) | TON | 45.50 | $70.85 | $75.00 | $120.00 |
| 0001-0030 | Concrete class A4 box culvert (302SD20-0004) | CY | 18 | $8,000.00 | $12,500 | $7,000.00 |
| 0001-0040 | Reinf. steel (302SD20-0005) | LB | 1,560 | $0.01 | $3.00 | $10.00 |
| 0001-0050 | 24" pipe (302SD20-0037) | LF | 105 | $197.45 | $325.00 | $350.00 |
| 0001-0060 | 48" pipe (302SD20-0067) | LF | 136 | $294.05 | $400.00 | $550.00 |
| 0001-0070 | 78" pipe (302SD20-0097) | LF | 155 | $659.65 | $2,000.00 | $2,000.00 |
| 0001-0080 | 24" end section ES-1 or 2 (302SD20-0204) | EACH | 1 | $2,958.00 | $750.00 | $2,500.00 |
| 0001-0090 | Pipe spillout PS-3 (302SD20-0669) | EACH | 2 | $1,250.00 | $25,000 | $5,000.00 |
| 0001-0100 | Temp. dive. channel lining CL. A (302SD20-0670) | SY | 66 | $24.70 | $25.00 | $45.00 |
| 0001-0110 | Temp. dive. channel lining CL. B (302SD20-0671) | SY | 553 | $19.65 | $125.00 | $55.00 |
| 0001-0120 | Temp. dive. channel excavation (302SD20-0672) | CY | 218 | $33.45 | $85.00 | $90.00 |
| 0001-0130 | Regular excavation (303SD20-0001) | CY | 1,938 | $40.40 | $60.00 | $100.00 |
| 0001-0140 | Borrow excavation (303SD20-0007) | CY | 5,919 | $34.40 | $30.00 | $98.00 |
| 0001-0150 | Geotextile embankment stab. (303SD20-0013) | SY | 1,100 | $8.90 | $3.00 | $15.00 |
| 0001-0160 | Minor STR. excav. pipe culvert (303SD20-0016) | CY | 1,651 | $33.00 | $100.00 | $100.00 |
| 0001-0170 | Minor STR. excav. box culvert (303SD20-0017) | CY | 24 | $235.00 | $700.00 | $120.00 |
| 0001-0180 | Slope drain (303SD20-0018) | EACH | 1 | $793.55 | $2,800.00 | $10,000 |
| 0001-0190 | Erosion control mulch (303SD20-0019) | SY | 442 | $12.50 | $1.40 | $5.00 |
| 0001-0200 | Temporary diversion dike (303SD20-0021) | LF | 186 | $6.15 | $24.00 | $10.00 |
| 0001-0210 | Check dam rock TY. I (303SD20-0022) | EACH | 2 | $598.00 | $1,000.00 | $1,000.00 |
| 0001-0220 | Dewatering basin EC-8 (303SD20-0028) | EACH | 7 | $989.00 | $500.00 | $10,000 |
| 0001-0230 | Siltation control excavation (303SD20-0029) | CY | 458 | $0.01 | $15.00 | $0.01 |
| 0001-0240 | Temp. silt fence type B (303SD20-0033) | LF | 239 | $8.30 | $7.00 | $15.00 |
| 0001-0250 | Temp. silt fence type A (303SD20-0034) | LF | 1,880 | $4.65 | $6.00 | $10.00 |
| 0001-0260 | Rock excavation (303SX20-0005) | CY | 300 | $360.75 | $125.00 | $300.00 |
| 0001-0270 | Utility test pit unpaved (303SX20-0012) | EACH | 5 | $1,521.75 | $1,850.00 | $1,000.00 |
| 0001-0280 | NS rockfill NS rockfill no. 1 aggregate (303SX20-0015) | TON | 141.30 | $85.15 | $140.00 | $120.00 |
| 0001-0290 | Temp.veh.watercourse crossing (303SX20-0024) | EACH | 3 | $14,896 | $7,500.00 | $30,000 |
| 0001-0300 | Aggr. matl. no. 3 (305SD20-0013) | TON | 489 | $90.50 | $75.00 | $99.00 |
| 0001-0310 | Aggr. matl. no. 21B (308SD20-0007) | TON | 55 | $116.15 | $75.00 | $95.00 |
| 0001-0320 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 1,521 | $74.60 | $75.00 | $95.00 |
| 0001-0330 | Crusher run aggr. no. 25 or 26 (308SX20-0003) | TON | 242 | $68.95 | $75.00 | $85.00 |
| 0001-0340 | Tack coat (310SD20-0001) | GAL | 161 | $6.25 | $10.00 | $10.00 |
| 0001-0350 | Prime coat (311SD20-0001) | GAL | 32 | $18.75 | $10.00 | $10.00 |
| 0001-0360 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 144 | $750.00 | $330.00 | $450.00 |
| 0001-0370 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 358 | $481.25 | $315.00 | $375.00 |
| 0001-0380 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 384 | $437.50 | $300.00 | $350.00 |
| 0001-0390 | NS saw-cut asph conc full depth saw-cut (315SX20-0011) | LF | 568 | $9.50 | $15.00 | $20.00 |
| 0001-0400 | Cofferdam (401SD20-0007) | EACH | 7 | $22,000 | $25,000 | $30,000 |
| 0001-0410 | NS temp support of excavation (for 78" culvert) (402SX20-0002) | LS | 1 | $896,000 | $725,000 | $400,000 |
| 0001-0420 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 3 | $412.40 | $145.00 | $100.00 |
| 0001-0430 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 170 | $101.00 | $125.00 | $100.00 |
| 0001-0440 | Dry riprap CL. AI (414SD20-0008) | TON | 840 | $91.00 | $125.00 | $125.00 |
| 0001-0450 | Energy dissipator EG-1 (502SD20-0001) | EACH | 2 | $3,431.50 | $10,000 | $10,000 |
| 0001-0460 | Paved ditch PG-2A (502SD20-0003) | SY | 15 | $302.65 | $330.00 | $300.00 |
| 0001-0470 | Paved ditch PG-5 (502SD20-0004) | SY | 22 | $410.10 | $330.00 | $400.00 |
| 0001-0480 | Paved flume PG-4 (502SD20-0005) | SY | 16.10 | $752.50 | $330.00 | $425.00 |
| 0001-0490 | NS paved ditch (modified PG-2A) (502SX20-0006) | SY | 34 | $258.90 | $330.00 | $325.00 |
| 0001-0500 | Concrete class A3 misc. (504SD20-0001) | CY | 17.73 | $1,102.30 | $1,000.00 | $3,000.00 |
| 0001-0510 | Guardrail GR-MGS1 (505SD20-0011) | LF | 325 | $43.75 | $30.00 | $50.00 |
| 0001-0520 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 100 | $50.00 | $33.00 | $55.00 |
| 0001-0530 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 3 | $6,250.00 | $3,850.00 | $7,500.00 |
| 0001-0540 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 3 | $2,500.00 | $2,750.00 | $3,000.00 |
| 0001-0550 | Impact attenuator IA-2 (505SD20-0068) | EACH | 1 | $42,493 | $30,000 | $35,000 |
| 0001-0560 | Remove existing guardrail (505SD20-0073) | LF | 387 | $12.50 | $3.30 | $15.00 |
| 0001-0570 | NS hand dig guardrail post holes (505SX20-0001) | EACH | 10 | $1,250.00 | $330.00 | $750.00 |
| 0001-0580 | High visibility fence, 4 feet (507SD20-0027) | LF | 308 | $4.55 | $8.50 | $20.00 |
| 0001-0590 | Demo. of pavement flexible (508SD20-0004) | SY | 822 | $25.60 | $18.00 | $50.00 |
| 0001-0600 | Flowable backfill (509SD20-0001) | CY | 70 | $388.45 | $550.00 | $500.00 |
| 0001-0610 | Adjust exist. valve & box (510SD20-0038) | EACH | 1 | $3,098.00 | $2,500.00 | $1,500.00 |
| 0001-0620 | Connect to exist. A/C pipe (510SX20-0009) | EACH | 2 | $6,672.00 | $2,500.00 | $3,500.00 |
| 0001-0630 | Remove exist. A/C pipe (510SX20-0010) | LF | 136 | $29.15 | $70.00 | $250.00 |
| 0001-0640 | NS rem. exist. paved ditch (temporary) (510SX20-0015) | SY | 8.10 | $67.40 | $250.00 | $120.00 |
| 0001-0650 | NS remove exist. endwall (temporary) (510SX20-0028) | EACH | 2 | $273.00 | $2,500.00 | $2,000.00 |
| 0001-0660 | NS remove exist. pipe culvert (42" and 48") (510SX20-0039) | LF | 152 | $20.30 | $150.00 | $1,000.00 |
| 0001-0670 | Allaying dust (511SD20-0001) | HR | 150 | $0.01 | $100.00 | $30.00 |
| 0001-0680 | Type 3 barricade 8' (512SD20-0013) | EACH | 6 | $343.75 | $550.00 | $1,000.00 |
| 0001-0690 | Temporary sign (512SD20-0014) | SF | 181 | $20.00 | $28.00 | $40.00 |
| 0001-0700 | Group 2 channelizing devices (512SD20-0024) | DAY | 5,000 | $1.20 | $1.00 | $3.00 |
| 0001-0710 | Port.changeable mess. sign (512SD20-0025) | HR | 700 | $3.85 | $10.00 | $10.00 |
| 0001-0720 | Flagger service (512SD20-0027) | HR | 400 | $47.90 | $100.00 | $50.00 |
| 0001-0730 | Warning light TY. B (512SD20-0029) | DAY | 500 | $2.50 | $5.00 | $2.00 |
| 0001-0740 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 100 | $7.10 | $61.00 | $75.00 |
| 0001-0750 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 100 | $8.80 | $46.00 | $65.00 |
| 0001-0760 | Temp. PVMT MRKG TY. D, CL. III, 24" (512SD20-0065) | LF | 30 | $39.00 | $54.00 | $65.00 |
| 0001-0770 | Traffic barrier service conc. (512SD20-0066) | LF | 645 | $95.00 | $115.00 | $75.00 |
| 0001-0780 | Portable temporary rumble strip array (512SP20-0001) | DAY | 100 | $103.30 | $50.00 | $200.00 |
| 0001-0790 | Mobilization (513SD20-0001) | LS | 1 | $255,000 | $218,000 | $287,000 |
| 0001-0800 | Field office TY.I (514SD20-0001) | MO | 10 | $4,250.00 | $4,800.00 | $5,000.00 |
| 0001-0810 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 1,609 | $31.25 | $14.00 | $20.00 |
| 0001-0820 | Construction surveying constr. (517SD20-0001) | LS | 1 | $59,544 | $120,000 | $400,000 |
| 0001-0830 | 6" DI water main (520SD20-0014) | LF | 153 | $244.70 | $400.00 | $250.00 |
| 0001-0840 | 6" gate valve & box (520SD20-0089) | EACH | 1 | $7,315.00 | $3,250.00 | $5,000.00 |
| 0001-0850 | Mailbox post, double (521SD20-0002) | EACH | 1 | $1,090.00 | $350.00 | $800.00 |
| 0001-0860 | NS storm water management temporary pump around (at 4 locations) (523SP20-0005) | LS | 1 | $68,525 | $500,000 | $400,000 |
| 0001-0870 | NS soil NS soil clay plug (523SX20-0002) | CY | 9.60 | $1,007.00 | $500.00 | $400.00 |
| 0001-0880 | Topsoil class B 3" (602SD20-0004) | CY | 375 | $195.00 | $200.00 | $400.00 |
| 0001-0890 | Temporary seed (603SD20-0002) | LB | 206 | $20.00 | $18.00 | $20.00 |
| 0001-0900 | Regular seed (603SD20-0003) | LB | 320 | $21.25 | $19.00 | $22.00 |
| 0001-0910 | Overseeding (603SD20-0004) | LB | 255 | $21.25 | $19.00 | $22.00 |
| 0001-0920 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 1,510 | $1.20 | $1.10 | $4.00 |
| 0001-0930 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 8,230 | $1.40 | $1.20 | $4.00 |
| 0001-0940 | Sediment retention roll 18" min (603SD20-0011) | LF | 392 | $21.80 | $25.00 | $30.00 |
| 0001-0950 | Fertilizer nitrogen - N (603SD20-0014) | LB | 90 | $2.50 | $2.20 | $4.00 |
| 0001-0960 | Fertilizer phosphorous - P (603SD20-0015) | LB | 63 | $2.50 | $2.20 | $4.00 |
| 0001-0970 | Fertilizer potassium - K (603SD20-0016) | LB | 63 | $2.50 | $2.20 | $4.00 |
| 0001-0980 | Lime (603SD20-0017) | TON | 4.92 | $187.50 | $165.00 | $200.00 |
| 0001-0990 | Rolled erosion CTRL product EC-2 type 4 (606SD20-0004) | SY | 2,478 | $6.60 | $5.85 | $10.00 |
| 0001-1000 | Rolled erosion CTRL product EC-3 type 1 (606SD20-0005) | SY | 160 | $10.00 | $8.80 | $12.00 |
| 0001-1010 | Mowing (608SD20-0001) | HR | 20 | $125.00 | $50.00 | $30.00 |
| 0001-1020 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 9 | $576.00 | $520.00 | $500.00 |
| 0001-1030 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 120 | $57.30 | $50.00 | $30.00 |
| 0001-1040 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 9 | $1,532.95 | $1,400.00 | $800.00 |
| 0001-1050 | 8/3 conductor cable (700SD20-0108) | LF | 10 | $12.10 | $11.00 | $15.00 |
| 0001-1060 | 14/4 conductor cable (700SD20-0112) | LF | 50 | $6.35 | $6.00 | $9.00 |
| 0001-1070 | Electrical service SE-4, TY. A (700SD20-0134) | EACH | 1 | $4,864.00 | $4,400.00 | $5,200.00 |
| 0001-1080 | Junction box JB-S2 (700SD20-0178) | EACH | 1 | $3,059.80 | $2,850.00 | $3,500.00 |
| 0001-1090 | Conduit PVC 3" (700SD20-0195) | LF | 60 | $11.20 | $11.00 | $15.00 |
| 0001-1100 | Trench excavation eci-1 (700SD20-0197) | LF | 60 | $10.90 | $11.00 | $15.00 |
| 0001-1110 | NS traffic signalization solar powered flashing beacon warning system assembly (700SX20-0010) | EACH | 1 | $29,684 | $40,000 | $35,000 |
| 0001-1120 | Sign panel (701SD20-0001) | SF | 100 | $75.30 | $68.00 | $40.00 |
| 0001-1130 | Flashing beacon FB-2 (703SD20-0005) | EACH | 1 | $16,945 | $21,000 | $20,000 |
| 0001-1140 | Flasher (703SD20-0006) | EACH | 1 | $4,365.00 | $4,400.00 | $5,000.00 |
| 0001-1150 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 1,480 | $13.20 | $5.50 | $7.00 |
| 0001-1160 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 1,250 | $15.20 | $5.60 | $8.00 |
| 0001-1170 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 150 | $36.45 | $38.00 | $45.00 |
| 0001-1180 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 2 | $1,202.75 | $550.00 | $625.00 |
| 0001-1190 | ITS controller cabinet pole mounted (801SD20-0002) | EACH | 1 | $15,439 | $15,000 | $20,000 |
| 0001-1200 | Uninterruptible power supply ITS-CC (802SD20-0001) | EACH | 1 | $9,667.00 | $12,000 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 4, 2026. Compiled by Mirage Metrics.