8/3 conductor cable, VDOT 700SD20-0108

Low bidders on VDOT contracts carried a median of $11.68 per LF for this item, over the 24 months to 28 OCT 2026, across 6 low bids. Half of all 11 bids fell between $8.00 and $13.55.

Owner
Virginia DOT
Item
700SD20-0108
Unit
LF
Data through
28 OCT 2026

VDOT has bid this work under more than one code: 51598 on lettings from 23 APR 2002 to 25 AUG 2021 (151 bids); 700SD20-0108 on lettings from 17 DEC 2025 to 22 JUL 2026 (11 bids). They are combined here into one trend.

$11.68Low bidder's median, per LF
$11.00Median of all bids, per LF
6Contracts in the window

By year of letting

8/3 conductor cable, VDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
200211$2.203$2.20
200322$2.005$1.10
200433$3.009$3.00
200522$3.334$2.66
200644$2.3111$2.25
200711$5.302$5.20
200822$3.086$2.60
200922$2.506$2.50
201077$2.5020$2.52
201122$2.546$2.51
201222$1.804$2.60
201322$3.625$2.50
201466$3.6717$3.00
201522$2.304$2.38
201655$8.5013$6.50
201733$4.339$1.95
201811$8.403$8.60
201944$3.139$2.72
202055$3.1511$3.15
202122$4.044$4.05
202511$4.702$7.35
202655$12.109$11.25

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Richmond17$2.5045$2.50
Hampton Roads18$2.6745$2.54
Staunton9$6.0020$4.33
Salem8$7.5519$5.30
Bristol4$3.1511$3.30
Fredericksburg3$3.009$3.00
Northern Virginia3$3.007$3.00
8/3 conductor cable, VDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Quantity (LF)Low bidsLow-bid median
10 to 4016$2.75
40 to 7016$3.00
70 to 13016$3.73
145 to 4,33516$3.58
8/3 conductor cable, VDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

BidderLines bidLowest on the line
Blakemore Construction Corporation75 (71%)
Howard Brothers Contractor, Inc.74 (57%)
W-L Construction & Paving, Inc.54 (80%)
Branscome Inc.93 (33%)
Curtis Contracting, Inc.53 (60%)
Allegheny Construction Company, Inc.53 (60%)
8/3 conductor cable, VDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
22 JUL 2026C0000120611C01Salem70$11.25$11.251Branch Civil, Inc.VDOT
24 JUN 2026C0000108810C01Staunton470$17.46$14.232A & J Development and Excavation, Inc.VDOT
24 JUN 2026C0000119655C01BStaunton210$26.66$26.661Richardson-Wayland-Ferreira, LLCVDOT
27 MAY 2026C0000119644C01Staunton195$6.00$5.002Arthur Construction Co., Inc.VDOT
04 FEB 2026C0000119451M01Salem10$12.10$12.103W. C. English, IncorporatedVDOT
17 DEC 2025C0000119474C01Salem130$4.70$7.352Richardson-Wayland-Ferreira, LLCVDOT
25 AUG 2021C0000111047T01Staunton300$6.20$6.201Ces Consulting, LLCVDOT
20 JAN 2021C0000109481C01Hampton Roads130$1.87$1.903Henry S. Branscome, L.L.C.VDOT
22 JUL 2020C0000109440C01Bristol1,525$1.75$1.692Jones Road & Bridge, Inc.VDOT
22 APR 2020C0000111707C01Hampton Roads55$5.15$14.112Curtis Contracting, Inc.VDOT
25 MAR 2020C0000018003C01Staunton275$3.15$4.582General Excavation, Inc.VDOT
25 MAR 2020C0000109466M01Fredericksburg25$3.00$3.003Howard Brothers Contractor, Inc.VDOT
22 JAN 2020C000111370C01BSalem40$6.60$4.302Allegheny Construction Company, Inc.VDOT
23 OCT 2019C0000102944M01Hampton Roads40$3.74$3.743Henry S. Branscome, L.L.C.VDOT
24 JUL 2019C0000100921C01Hampton Roads60$2.52$2.523Branscome Inc.VDOT
Latest VDOT contracts carrying 8/3 conductor cable

Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.

How these prices were read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the VDOT letting of 28 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way