VDOT contract C0000119474C01 bid tabulation
Smart scale - intersection turn improvements. Let by Virginia DOT on December 17, 2025, Salem. 2 bids received; low bid $1,406,888 by Richardson-Wayland-Ferreira, LLC.
- Owner
- Virginia DOT
- Letting
- 17 DEC 2025
- Pay items
- 98
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Richardson-Wayland-Ferreira, LLC | $1,406,888 | Low |
| 2 | Allegheny Construction Company, Inc. | $1,632,293 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Richardson-Wayland-Ferreira, LLC | 2. Allegheny Construction Company, Inc. |
|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $18,439 | $175,000 |
| 0001-0020 | 12" conc. pipe (302SD20-0020) | LF | 57 | $364.68 | $400.00 |
| 0001-0030 | 23" X 14" elliptical conc. pipe (302SD20-0133) | LF | 73 | $571.32 | $570.00 |
| 0001-0040 | 12" end section ES-1 (302SD20-0197) | EACH | 2 | $9,820.70 | $2,700.00 |
| 0001-0050 | 23" X 14" end section ES-1A (302SD20-0221) | EACH | 2 | $12,744 | $3,000.00 |
| 0001-0060 | Regular excavation (303SD20-0001) | CY | 232 | $295.09 | $465.00 |
| 0001-0070 | Check dam rock TY. I (303SD20-0022) | EACH | 14 | $1,856.55 | $1,200.00 |
| 0001-0080 | Siltation control excavation (303SD20-0029) | CY | 66 | $531.90 | $1.00 |
| 0001-0090 | Aggr. matl. no. 1 (305SD20-0010) | TON | 85 | $267.75 | $140.00 |
| 0001-0100 | Aggr.base mat.TY. I no.21A or 21B (308SD20-0009) | TON | 59 | $183.39 | $200.00 |
| 0001-0110 | Tack coat (310SD20-0001) | GAL | 230 | $3.89 | $5.00 |
| 0001-0120 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 101 | $460.27 | $275.00 |
| 0001-0130 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 315 | $228.34 | $270.00 |
| 0001-0140 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 88 | $239.73 | $300.00 |
| 0001-0150 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 332 | $39.17 | $15.00 |
| 0001-0160 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 1.60 | $227.83 | $250.00 |
| 0001-0170 | Demo. of pavement flexible (508SD20-0004) | SY | 62 | $153.32 | $100.00 |
| 0001-0180 | NS modify exist. controller (510SX20-0031) | EACH | 1 | $5,191.99 | $8,000.00 |
| 0001-0185 | NS install install street name sign (510SX20-0012) | LF | 4 | $1,692.90 | $200.00 |
| 0001-0200 | Allaying dust (511SD20-0001) | HR | 60 | $134.39 | $75.00 |
| 0001-0210 | Type 3 barricade 4' (512SD20-0012) | EACH | 2 | $392.43 | $500.00 |
| 0001-0220 | Type 3 barricade 8' (512SD20-0013) | EACH | 5 | $432.33 | $600.00 |
| 0001-0230 | Temporary sign (512SD20-0014) | SF | 187 | $78.88 | $27.00 |
| 0001-0240 | Group 2 channelizing devices (512SD20-0024) | DAY | 9,083 | $0.33 | $4.00 |
| 0001-0250 | Port.changeable mess. sign (512SD20-0025) | HR | 672 | $11.81 | $15.00 |
| 0001-0260 | Flagger service (512SD20-0027) | HR | 50 | $38.37 | $70.00 |
| 0001-0270 | Warning light TY. B (512SD20-0029) | DAY | 24 | $2.67 | $5.00 |
| 0001-0280 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 1,650 | $1.92 | $3.00 |
| 0001-0290 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 384 | $7.25 | $10.00 |
| 0001-0300 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 670 | $6.24 | $6.00 |
| 0001-0310 | Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061) | LF | 1,517 | $4.76 | $5.00 |
| 0001-0320 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 525 | $6.48 | $6.50 |
| 0001-0330 | Temp. PVMT MRKG TY. D, CL. III, 24" (512SD20-0065) | LF | 22 | $10.49 | $34.00 |
| 0001-0340 | NS police patrol uniformed flaggers (512SX20-0040) | HR | 50 | $83.79 | $120.00 |
| 0001-0350 | Mobilization (513SD20-0001) | LS | 1 | $125,000 | $110,000 |
| 0001-0360 | Field office TY.I (514SD20-0001) | MO | 9 | $5,213.67 | $5,000.00 |
| 0001-0370 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 1,922 | $15.76 | $25.00 |
| 0001-0380 | Flexible pavement planing above 4" (515SD20-0015) | SY | 373 | $22.77 | $35.00 |
| 0001-0390 | Construction surveying constr. (517SD20-0001) | LS | 1 | $29,966 | $62,000 |
| 0001-0400 | Mailbox post, single (521SD20-0001) | EACH | 1 | $877.48 | $900.00 |
| 0001-0410 | Topsoil class B topsoil CL. B 3" (602SD20-0004) | CY | 29 | $1,250.98 | $200.00 |
| 0001-0420 | Temporary seed (603SD20-0002) | LB | 17 | $59.93 | $50.00 |
| 0001-0430 | Regular seed (603SD20-0003) | LB | 21 | $65.92 | $40.00 |
| 0001-0440 | Overseeding (603SD20-0004) | LB | 17 | $65.92 | $30.00 |
| 0001-0450 | Legume seed (603SD20-0005) | LB | 1 | $71.92 | $55.00 |
| 0001-0460 | Legume overseeding (603SD20-0006) | LB | 1 | $71.92 | $55.00 |
| 0001-0470 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 442 | $1.80 | $4.00 |
| 0001-0480 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 353 | $2.40 | $5.00 |
| 0001-0490 | Fertilizer nitrogen - N (603SD20-0014) | LB | 7 | $5.99 | $5.00 |
| 0001-0500 | Fertilizer phosphorous - P (603SD20-0015) | LB | 5 | $5.99 | $5.00 |
| 0001-0510 | Fertilizer potassium - K (603SD20-0016) | LB | 5 | $5.99 | $5.00 |
| 0001-0520 | Lime (603SD20-0017) | TON | 0.40 | $299.65 | $350.00 |
| 0001-0530 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 335 | $6.60 | $5.00 |
| 0001-0540 | Mowing (608SD20-0001) | HR | 20 | $395.60 | $125.00 |
| 0001-0550 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 2 | $353.52 | $500.00 |
| 0001-0560 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 1 | $265.16 | $350.00 |
| 0001-0570 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 55 | $39.83 | $32.00 |
| 0001-0580 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 3 | $728.36 | $2,000.00 |
| 0001-0590 | Electrical service SE-5 (700SD20-0060) | EACH | 1 | $16,445 | $13,000 |
| 0001-0600 | Conc. found. PF-8 (700SD20-0068) | CY | 40 | $2,833.29 | $2,800.00 |
| 0001-0610 | Conc. found. CF-4 (700SD20-0074) | EACH | 1 | $8,221.40 | $2,000.00 |
| 0001-0620 | Signal mast arm pole MP- 3, TY. C (700SD20-0093) | EACH | 2 | $28,239 | $37,000 |
| 0001-0630 | Mast arm 40' (700SD20-0099) | EACH | 2 | $11,688 | $17,000 |
| 0001-0640 | Mast arm 60' (700SD20-0101) | EACH | 2 | $12,401 | $24,000 |
| 0001-0650 | 8/3 conductor cable (700SD20-0108) | LF | 130 | $4.70 | $10.00 |
| 0001-0660 | 14/4 conductor cable (700SD20-0112) | LF | 1,200 | $7.82 | $6.00 |
| 0001-0670 | 14/7 conductor cable (700SD20-0114) | LF | 800 | $6.87 | $6.50 |
| 0001-0680 | Conc. found. LF-1, TY. A (700SD20-0149) | EACH | 2 | $5,843.22 | $6,000.00 |
| 0001-0690 | Electrical service work pad (700SD20-0174) | EACH | 1 | $1,569.61 | $1,500.00 |
| 0001-0700 | Junction box JB-S2 (700SD20-0178) | EACH | 6 | $2,997.95 | $3,400.00 |
| 0001-0710 | Junction box JB-S3 (700SD20-0179) | EACH | 1 | $4,628.15 | $3,200.00 |
| 0001-0720 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 5 | $364.90 | $225.00 |
| 0001-0730 | Bored conduit 2" (700SD20-0191) | LF | 60 | $137.45 | $65.00 |
| 0001-0740 | Bored conduit 3" (700SD20-0192) | LF | 255 | $153.26 | $85.00 |
| 0001-0750 | Conduit PVC 2" (700SD20-0194) | LF | 105 | $18.15 | $15.00 |
| 0001-0760 | Conduit PVC 3" (700SD20-0195) | LF | 150 | $24.53 | $15.00 |
| 0001-0770 | Trench excavation eci-1 (700SD20-0197) | LF | 170 | $27.94 | $30.00 |
| 0001-0780 | Test bore (700SD20-0199) | EACH | 4 | $4,826.04 | $10,000 |
| 0001-0790 | NS conductor cable 14/3 (epcl) (700SX20-0007) | LF | 785 | $4.72 | $6.00 |
| 0001-0800 | NS traffic signalization antenna cable (700SX20-0009) | LF | 250 | $19.91 | $5.00 |
| 0001-0810 | NS traffic signalization econolite cobalt controller (700SX20-0010) | EACH | 1 | $6,610.56 | $24,000 |
| 0001-0820 | NS traffic signalization TS2 econolite cabinet - 2 door configuration (700SX20-0010) | EACH | 1 | $27,058 | $40,000 |
| 0001-0830 | Sign panel (701SD20-0001) | SF | 52.50 | $115.34 | $75.00 |
| 0001-0840 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 36 | $534.30 | $725.00 |
| 0001-0850 | Video detection camera (703SD20-0014) | EACH | 4 | $10,228 | $12,000 |
| 0001-0860 | Video detection cable (703SD20-0015) | LF | 785 | $6.87 | $5.00 |
| 0001-0870 | Evp detection system 4- way (703SD20-0023) | EACH | 1 | $9,534.48 | $13,500 |
| 0001-0880 | Evp detector cable (703SD20-0024) | LF | 785 | $6.29 | $5.00 |
| 0001-0890 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 10 | $776.43 | $1,100.00 |
| 0001-0900 | Uninterrupt. PWR supply type 2 (703SD20-0053) | EACH | 1 | $7,498.33 | $13,000 |
| 0001-0910 | Uninterrupt. PWR supply battery pac (703SD20-0054) | EACH | 1 | $3,734.27 | $5,000.00 |
| 0001-0920 | Uninterrupt. PWR supply cabinet att (703SD20-0055) | EACH | 1 | $6,049.35 | $10,000 |
| 0001-0930 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 4,205 | $2.93 | $3.00 |
| 0001-0940 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 170 | $34.67 | $35.00 |
| 0001-0950 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 10 | $582.41 | $585.00 |
| 0001-0960 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 2 | $1,015.77 | $1,000.00 |
| 0001-0970 | Cellular/PCS wireless modem (807SD20-0001) | EACH | 2 | $5,605.31 | $3,900.00 |
| 0001-0980 | 5.8 GHZ wireless broadband radio (807SD20-0003) | EACH | 2 | $8,104.08 | $11,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of December 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.