VDOT contract C0000119467C01 bid tabulation
Smart scale - road improvements/ lanes addition. Let by Virginia DOT on June 24, 2026, Franklin, Salem. 2 bids received; low bid $2,432,572 by Haymes Brothers, Inc..
- Owner
- Virginia DOT
- Letting
- 24 JUN 2026
- Pay items
- 85
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Haymes Brothers, Inc. | $2,432,572 | Low |
| 2 | F & B Contractors, LTD. | $2,489,451 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haymes Brothers, Inc. | 2. F & B Contractors, LTD. |
|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $150,000 | $124,505 |
| 0001-0020 | Bedding matl. aggr. no. 57 (302SD20-0002) | TON | 182 | $125.00 | $61.20 |
| 0001-0030 | Structural steel JB-1 (302SD20-0008) | LB | 3,488.13 | $5.00 | $9.20 |
| 0001-0040 | 15" storm sewer pipe (302SD20-0027) | LF | 102 | $200.00 | $157.50 |
| 0001-0050 | 24" conc. pipe (302SD20-0039) | LF | 8 | $250.00 | $291.60 |
| 0001-0060 | 30" storm sewer pipe (302SD20-0051) | LF | 11 | $300.00 | $348.90 |
| 0001-0070 | 54" storm sewer pipe (302SD20-0078) | LF | 378 | $660.00 | $463.60 |
| 0001-0080 | Drop inlet DI-5 (302SD20-0446) | EACH | 1 | $15,000 | $12,914 |
| 0001-0090 | Drop inlet DI-13 TY.I (302SD20-0655) | EACH | 2 | $15,000 | $7,892.00 |
| 0001-0100 | Frame & cover MH-1 (302SD20-0663) | EACH | 3 | $1,500.00 | $882.20 |
| 0001-0110 | Pipe rehabilitation (54", method B, category D) (302SP20-0001) | LF | 64 | $572.00 | $1,248.50 |
| 0001-0120 | Regular excavation (303SD20-0001) | CY | 1,138 | $175.00 | $179.30 |
| 0001-0130 | Borrow excavation (303SD20-0007) | CY | 2,598 | $50.00 | $61.20 |
| 0001-0140 | Minor STR. excav. pipe culvert (303SD20-0016) | CY | 361 | $150.00 | $74.20 |
| 0001-0150 | Check dam rock TY. II (303SD20-0023) | EACH | 5 | $5,000.00 | $695.10 |
| 0001-0160 | Check dam sediment retention roll 18" (303SD20-0024) | EACH | 3 | $2,500.00 | $425.00 |
| 0001-0170 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $1,000.00 | $4,375.00 |
| 0001-0180 | Siltation control excavation (303SD20-0029) | CY | 443 | $20.00 | $0.10 |
| 0001-0190 | Inlet protection type A (303SD20-0030) | EACH | 2 | $5,000.00 | $443.70 |
| 0001-0200 | Inlet protection type B (303SD20-0031) | EACH | 2 | $5,000.00 | $347.40 |
| 0001-0210 | Temp. silt fence type A (303SD20-0034) | LF | 2,196 | $3.47 | $6.60 |
| 0001-0220 | Geotextile subgrade stab. (305SD20-0009) | SY | 1,091 | $5.00 | $10.00 |
| 0001-0230 | Aggr. matl. no. 1 (308SD20-0001) | TON | 260.20 | $150.00 | $75.00 |
| 0001-0240 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 306.50 | $150.00 | $97.50 |
| 0001-0250 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 844.70 | $324.50 | $307.00 |
| 0001-0260 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 408 | $357.50 | $359.80 |
| 0001-0270 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 321.30 | $319.00 | $301.00 |
| 0001-0280 | Asph.conc.curb backup matl. const (315SD20-0018) | TON | 14.60 | $1,155.00 | $1,261.00 |
| 0001-0290 | Saw-cut asphalt concrete full depth (315SD20-0104) | LF | 886 | $15.00 | $6.20 |
| 0001-0300 | Cofferdam (401SD20-0007) | EACH | 5 | $5,000.00 | $21,588 |
| 0001-0310 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0002) | SY | 4 | $250.00 | $67.90 |
| 0001-0320 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0004) | SY | 39 | $250.00 | $71.30 |
| 0001-0330 | Curb, asphalt MC-3B (502SD20-0020) | LF | 353 | $71.50 | $79.00 |
| 0001-0340 | Concrete class A3 misc. (504SD20-0001) | CY | 24.49 | $1,000.00 | $2,498.92 |
| 0001-0350 | Guardrail GR-MGS1 (505SD20-0011) | LF | 362.50 | $37.40 | $43.00 |
| 0001-0360 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 87.50 | $41.80 | $49.00 |
| 0001-0370 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 1 | $4,400.00 | $4,801.00 |
| 0001-0380 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $1,650.00 | $1,801.00 |
| 0001-0390 | Remove existing guardrail (505SD20-0073) | LF | 287 | $11.00 | $8.90 |
| 0001-0400 | Demo. of pavement flexible (508SD20-0004) | SY | 205 | $25.00 | $64.70 |
| 0001-0410 | Adjust exist. valve & box (510SD20-0038) | EACH | 1 | $7,500.00 | $2,515.80 |
| 0001-0420 | NS adjust exist. drop inlet modify inlet (510SX20-0033) | EACH | 1 | $5,000.00 | $2,216.00 |
| 0001-0430 | Allaying dust (511SD20-0001) | HR | 291 | $50.00 | $65.00 |
| 0001-0440 | Traffic barrier service MB-11A (512SD20-0003) | LF | 480 | $75.00 | $65.70 |
| 0001-0450 | Temporary sign (512SD20-0014) | SF | 1,225 | $28.60 | $31.40 |
| 0001-0460 | Truck mounted attenuator (512SD20-0023) | HR | 347 | $50.00 | $75.00 |
| 0001-0470 | Group 2 channelizing devices (512SD20-0024) | DAY | 9,962 | $2.00 | $1.50 |
| 0001-0480 | Port.changeable mess. sign (512SD20-0025) | HR | 1,008 | $25.00 | $7.70 |
| 0001-0490 | Electronic arrow board (512SD20-0026) | HR | 565 | $25.00 | $7.00 |
| 0001-0500 | Flagger service (512SD20-0027) | HR | 392 | $40.00 | $65.00 |
| 0001-0510 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 3,390 | $4.41 | $5.80 |
| 0001-0520 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 2,400 | $7.28 | $8.90 |
| 0001-0530 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 990 | $8.57 | $10.30 |
| 0001-0540 | NS police patrol (uniformed flaggers) (512SX20-0040) | HR | 100 | $150.00 | $100.00 |
| 0001-0550 | Mobilization (513SD20-0001) | LS | 1 | $120,000 | $152,000 |
| 0001-0560 | Field office TY.II (514SD20-0002) | MO | 12 | $4,000.00 | $3,686.70 |
| 0001-0570 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 3,300 | $13.20 | $18.80 |
| 0001-0580 | Flexible pave. planing above 2"-4" (515SD20-0005) | SY | 3,300 | $16.50 | $19.00 |
| 0001-0590 | Construction surveying constr. (517SD20-0001) | LS | 1 | $24,200 | $40,440 |
| 0001-0600 | 6" water main (520SD20-0013) | LF | 10 | $300.00 | $383.50 |
| 0001-0610 | 6" gate valve & box (520SD20-0089) | EACH | 1 | $7,500.00 | $2,710.20 |
| 0001-0620 | Fire hydrant (520SD20-0162) | EACH | 1 | $10,000 | $7,436.20 |
| 0001-0630 | Topsoil class B (602SD20-0004) | CY | 564 | $75.00 | $113.10 |
| 0001-0640 | Temporary seed (603SD20-0002) | LB | 140 | $4.95 | $15.40 |
| 0001-0650 | Regular seed (603SD20-0003) | LB | 376 | $4.40 | $15.40 |
| 0001-0660 | Overseeding (603SD20-0004) | LB | 301 | $4.95 | $15.40 |
| 0001-0670 | Legume seed (603SD20-0005) | LB | 18 | $33.00 | $22.60 |
| 0001-0680 | Legume overseeding (603SD20-0006) | LB | 14 | $33.00 | $22.60 |
| 0001-0690 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 6,665 | $1.21 | $1.70 |
| 0001-0700 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 8,591 | $1.32 | $1.90 |
| 0001-0710 | Fertilizer nitrogen - N (603SD20-0014) | LB | 140 | $6.60 | $3.70 |
| 0001-0720 | Fertilizer phosphorous - P (603SD20-0015) | LB | 98 | $6.60 | $3.70 |
| 0001-0730 | Fertilizer potassium - K (603SD20-0016) | LB | 98 | $6.60 | $3.70 |
| 0001-0740 | Lime (603SD20-0017) | TON | 7.70 | $132.00 | $169.00 |
| 0001-0750 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 398 | $1.87 | $6.10 |
| 0001-0760 | Mowing (608SD20-0001) | HR | 192 | $50.00 | $65.00 |
| 0001-0770 | Sign post wood 4" X 4" (700SD20-0001) | LF | 440 | $11.00 | $4.60 |
| 0001-0780 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 6 | $191.40 | $209.80 |
| 0001-0790 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 80 | $19.62 | $22.40 |
| 0001-0800 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 8 | $749.10 | $818.20 |
| 0001-0810 | Sign panel (701SD20-0001) | SF | 68 | $32.79 | $36.80 |
| 0001-0820 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 930 | $2.72 | $4.00 |
| 0001-0830 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 3,129 | $2.99 | $4.30 |
| 0001-0840 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 18 | $23.43 | $26.60 |
| 0001-0850 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 4 | $392.54 | $429.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of June 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.