VDOT contract C0000128438N01 bid tabulation
Rural rustic road improvements. Let by Virginia DOT on March 25, 2026, Floyd, Salem. 4 bids received; low bid $1,043,179 by Allegheny Construction Company, Inc..
- Owner
- Virginia DOT
- Letting
- 25 MAR 2026
- Pay items
- 44
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Allegheny Construction Company, Inc. | $1,043,179 | Low |
| 2 | C. R. Henderson Company | $1,119,463 | +7.0% |
| 3 | Gardner, Inc. | $1,141,317 | +9.0% |
| 4 | Jones Road & Bridge, Inc. | $1,182,954 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allegheny Construction Company, Inc. | 2. C. R. Henderson Company | 3. Gardner, Inc. | 4. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | 18" pipe (302SD20-0028) | LF | 302 | $110.00 | $75.00 | $70.00 | $150.00 |
| 0001-0020 | 36" pipe (302SD20-0057) | LF | 90 | $230.00 | $125.00 | $120.00 | $300.00 |
| 0001-0030 | 42" pipe (302SD20-0062) | LF | 60 | $260.00 | $170.00 | $150.00 | $350.00 |
| 0001-0040 | 45" X 29" elliptical conc. pipe (302SD20-0143) | LF | 30 | $460.00 | $500.00 | $233.33 | $550.00 |
| 0001-0050 | Grading (303SD20-0004) | LS | 1 | $255,000 | $502,920 | $600,000 | $200,000 |
| 0001-0060 | Extra excavation (303SD20-0006) | CY | 154 | $60.00 | $10.00 | $10.00 | $60.00 |
| 0001-0070 | Check dam rock TY. II (303SD20-0023) | EACH | 26 | $1,000.00 | $500.00 | $400.00 | $550.00 |
| 0001-0080 | Siltation control excavation (303SD20-0029) | CY | 440 | $0.01 | $10.00 | $10.00 | $0.10 |
| 0001-0090 | Temp. silt fence type A (303SD20-0034) | LF | 2,499 | $5.00 | $3.00 | $4.00 | $7.00 |
| 0001-0100 | Borrow excavation (305SD20-0001) | CY | 156 | $100.00 | $30.00 | $35.00 | $90.00 |
| 0001-0110 | Aggr. matl. no. 1 (308SD20-0001) | TON | 1,440 | $55.00 | $50.00 | $50.00 | $80.00 |
| 0001-0120 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 2,960 | $54.00 | $40.00 | $43.00 | $70.00 |
| 0001-0130 | Blotted seal coat TY. D (314SP20-0004) | SY | 6,709 | $17.00 | $15.00 | $10.00 | $21.00 |
| 0001-0140 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 16 | $13.00 | $20.00 | $20.00 | $10.00 |
| 0001-0150 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 6 | $100.00 | $75.00 | $60.00 | $100.00 |
| 0001-0160 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 23 | $100.00 | $60.00 | $60.00 | $100.00 |
| 0001-0170 | Concrete class A3 misc. (504SD20-0001) | CY | 29 | $2,200.00 | $1,000.00 | $925.00 | $2,500.00 |
| 0001-0180 | Fence FE-W1 (507SD20-0001) | LF | 870 | $24.00 | $18.00 | $12.00 | $28.00 |
| 0001-0190 | Line brace unit FE-W1 or FE-W2 (507SD20-0003) | EACH | 2 | $600.00 | $800.00 | $75.00 | $600.00 |
| 0001-0200 | Corner brace unit FE-W1 or FE-W2 (507SD20-0004) | EACH | 2 | $600.00 | $1,000.00 | $75.00 | $600.00 |
| 0001-0210 | Gate FE-G 12' (507SD20-0021) | EACH | 1 | $2,000.00 | $500.00 | $500.00 | $2,300.00 |
| 0001-0220 | Demo. of pavement flexible (508SD20-0004) | SY | 185 | $24.00 | $10.00 | $10.00 | $30.00 |
| 0001-0230 | NS reset exist. mailbox (510SX20-0029) | EACH | 5 | $350.00 | $250.00 | $50.00 | $600.00 |
| 0001-0240 | NS remove exist. mailbox (510SX20-0040) | EACH | 1 | $150.00 | $25.00 | $50.00 | $500.00 |
| 0001-0250 | Allaying dust (511SD20-0001) | HR | 140 | $40.00 | $70.00 | $100.00 | $20.00 |
| 0001-0260 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $550.00 | $250.00 | $250.00 | $800.00 |
| 0001-0270 | Temporary sign (512SD20-0014) | SF | 286 | $22.00 | $10.00 | $5.00 | $30.00 |
| 0001-0280 | Aggregate material no. 25 or 26 (512SD20-0015) | TON | 67 | $54.00 | $36.00 | $35.00 | $70.00 |
| 0001-0290 | Flagger service (512SD20-0027) | HR | 1,120 | $30.00 | $30.00 | $25.00 | $35.00 |
| 0001-0300 | Mobilization (513SD20-0001) | LS | 1 | $80,000 | $70,000 | $35,000 | $85,000 |
| 0001-0310 | Construction surveying constr. (517SD20-0001) | LS | 1 | $15,000 | $15,000 | $15,000 | $40,000 |
| 0001-0320 | Topsoil class A (602SD20-0002) | CY | 24 | $110.00 | $50.00 | $200.00 | $60.00 |
| 0001-0330 | Temporary seed (603SD20-0002) | LB | 117 | $20.00 | $5.00 | $8.00 | $15.00 |
| 0001-0340 | Regular seed (603SD20-0003) | LB | 314 | $15.00 | $7.00 | $8.00 | $15.00 |
| 0001-0350 | Overseeding (603SD20-0004) | LB | 252 | $8.00 | $7.00 | $8.00 | $15.00 |
| 0001-0360 | Legume seed (603SD20-0005) | LB | 15 | $40.00 | $20.00 | $15.00 | $20.00 |
| 0001-0370 | Legume overseeding (603SD20-0006) | LB | 12 | $40.00 | $20.00 | $15.00 | $20.00 |
| 0001-0380 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 12,741 | $1.25 | $1.60 | $2.07 | $1.75 |
| 0001-0390 | Fertilizer nitrogen - N (603SD20-0014) | LB | 117 | $3.00 | $4.00 | $5.00 | $4.00 |
| 0001-0400 | Fertilizer phosphorous - P (603SD20-0015) | LB | 82 | $3.00 | $4.00 | $5.00 | $4.00 |
| 0001-0410 | Fertilizer potassium - K (603SD20-0016) | LB | 82 | $3.00 | $3.00 | $5.00 | $4.00 |
| 0001-0420 | Lime (603SD20-0017) | TON | 6.44 | $300.00 | $325.00 | $450.00 | $300.00 |
| 0001-0430 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 1,446 | $3.50 | $2.75 | $2.50 | $5.00 |
| 0001-0440 | Road edge del. ED-2 (702SD20-0003) | EACH | 16 | $440.00 | $800.00 | $700.00 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of March 25, 2026. Compiled by Mirage Metrics.