C. R. Henderson Company: VDOT bid record
C. R. Henderson Company submitted 29 bids on Virginia DOT contracts in the data, from 19 NOV 2002 to 25 MAR 2026, and was the low bidder on 15 of them (52%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $6,925,065
- Latest bid
- 25 MAR 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 2 | 1 | 50% |
| 2004 | 3 | 1 | 33% |
| 2005 | 2 | 2 | 100% |
| 2006 | 4 | 2 | 50% |
| 2007 | 3 | 2 | 67% |
| 2008 | 1 | 1 | 100% |
| 2010 | 2 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 1 | 1 | 100% |
| 2014 | 1 | 0 | 0% |
| 2017 | 1 | 1 | 100% |
| 2018 | 2 | 1 | 50% |
| 2019 | 3 | 2 | 67% |
| 2021 | 2 | 1 | 50% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 28 | 15 | 54% |
| Bristol | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 26 | 25 (96%) | $16.00 | $26.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 26 | 22 (85%) | $1.75 | $3.00 |
| Siltation control excavation | 303SD20-0029 | CY | 24 | 22 (92%) | $1.00 | $3.50 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 26 | 21 (81%) | $67.50 | $250.00 |
| 24" pipe | 302SD20-0037 | LF | 22 | 17 (77%) | $30.00 | $50.00 |
| Allaying dust | 511SD20-0001 | HR | 22 | 16 (73%) | $12.50 | $22.00 |
| 15" pipe | 1150 | LF | 19 | 16 (84%) | $20.00 | $35.00 |
| Flagger service | 512SD20-0027 | HR | 26 | 15 (58%) | $15.00 | $20.00 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 25 | 15 (60%) | $30.00 | $54.00 |
| CR. run aggr. no. 25 or 26 | 24260 | TON | 16 | 15 (94%) | $16.00 | $25.00 |
| 18" pipe | 302SD20-0028 | LF | 23 | 14 (61%) | $25.00 | $37.00 |
| Overseeding | 603SD20-0004 | LB | 27 | 13 (48%) | $4.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sowers Construction Co., Inc. | 7 | 2 of 7 |
| Boring Contractors, Inc. | 5 | 1 of 5 |
| Simpson Construction Company, Inc. | 4 | 2 of 4 |
| Elk Knob, Inc. | 4 | 3 of 4 |
| Dci/Shires, Inc. | 4 | 2 of 4 |
| Allegheny Construction Company, Inc. | 3 | 2 of 3 |
| Fort Chiswell Construction Corporation | 3 | 0 of 3 |
| A. R. Coffey and Sons, Inc. | 3 | 3 of 3 |
| Jones Road & Bridge, Inc. | 2 | 1 of 2 |
| J. C. Joyce Trucking and Paving Company, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 MAR 2026 | C0000128438N01 | Salem | Rural rustic road improvements | 2 of 4 | $1,119,463 | +7.0% |
| 27 OCT 2021 | C0000105964N01 | Salem | Resurface unpaved road | 1 of 1 | $988,194 | Low |
| 26 MAY 2021 | C0000110367N01 | Salem | Resurface unpaved road | 2 of 3 | $1,068,304 | +19% |
| 13 NOV 2019 | C0000104245N01 | Salem | Spot widening & hardsurface roadway | 3 of 3 | $985,000 | +58% |
| 24 APR 2019 | C0000110366N01 | Salem | Route 606 surface treatment | 1 of 3 | $724,450 | Low, 16% under the second |
| 24 APR 2019 | C0000112182N01 | Salem | Route 727 surface treatment | 1 of 3 | $654,279 | Low, 2.0% under the second |
| 28 MAR 2018 | 0000110318N01 | Salem | Surface treat unpaved road | 1 of 2 | $299,592 | Low, 30% under the second |
| 28 FEB 2018 | C0000110323N01 | Salem | Rural rustic road reconstruction and surface treatment | 2 of 3 | $382,044 | +22% |
| 22 MAR 2017 | C0000105947N01 | Salem | Rte 625 - pave unpaved road (rural rustic) | 1 of 3 | $449,952 | Low, 33% under the second |
| 22 JAN 2014 | C00051059N01 | Salem | Rte 638 - reconstruct & surface treat | 2 of 2 | $555,530 | +9.0% |
| 24 APR 2013 | C00094741N01 | Salem | Rte 643 - reconstruct & pave non-hardsurfaced road | 1 of 3 | $360,108 | Low, 22% under the second |
| 22 FEB 2012 | C00094738N01 | Salem | Rte. 609 - reconstruct & surface treat non-hardsurfaced road | 2 of 3 | $196,563 | +18% |
| 24 MAR 2010 | C00051140N01 | Salem | Rte. 778 reconstruction & pave non-hardsurfaced road | 3 of 3 | $654,740 | +16% |
| 24 MAR 2010 | C00056297N01 | Salem | Rte. 667 reconstruct & surface treat non-hardsurfaced rd. | 3 of 3 | $197,119 | +20% |
| 23 APR 2008 | C00051141N01 | Salem | 0.77 mi. grade, drain, pave & incidentals | 1 of 3 | $348,036 | Low, 24% under the second |
| 19 DEC 2007 | C00016958N01 | Bristol | 2.14 mi. grade, drain, stabilize roadway & incidentals | 2 of 3 | $1,531,022 | +6.0% |
| 27 JUN 2007 | C00073139N01 | Salem | None0695-077-211, n501 | 1 of 3 | $236,407 | Low, 14% under the second |
| 28 MAR 2007 | C00058893N01 | Salem | Grade, drain & asp. s. t. pave | 1 of 2 | $653,351 | Low, 83% under the second |
| 27 SEP 2006 | C00017495N02 | Salem | Reconstruct non-hardsurfaced road | 1 of 3 | $643,238 | Low, 35% under the second |
| 27 SEP 2006 | C00015525N01 | Salem | Reconstruct non-hardsurfaced road | 3 of 3 | $805,575 | +9.0% |
| 22 FEB 2006 | C00018724M01 | Salem | Reconstruct rte. 613, providing a paved surface | 1 of 2 | $614,876 | Low, 71% under the second |
| 22 FEB 2006 | C00017238N01 | Salem | 1.52 mi. grade, drain, stab., surface treat & incidentals | 2 of 3 | $471,046 | +1.0% |
| 22 JUN 2005 | C00071638M01 | Salem | 0.17 mi. grade, drain, & asphalt patching | 1 of 1 | $224,487 | Low |
| 25 MAY 2005 | C00073645A01 | Salem | Shift exist. roadway away from slope failure | 1 of 2 | $234,770 | Low, 9.0% under the second |
| 15 DEC 2004 | C00073138N02 | Salem | 1.40 mi. grade, drain, & asp. pave | 2 of 3 | $356,921 | 0.0% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.