White'S Construction Company, Inc. submitted 35 bids on Virginia DOT contracts in the data, from 19 NOV 2002 to 22 JUL 2026, and was the low bidder on 13 of them (37%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $13,775,870
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 0 | 0% |
| 2004 | 6 | 3 | 50% |
| 2007 | 2 | 1 | 50% |
| 2008 | 3 | 1 | 33% |
| 2009 | 2 | 1 | 50% |
| 2010 | 3 | 1 | 33% |
| 2011 | 2 | 0 | 0% |
| 2013 | 2 | 1 | 50% |
| 2014 | 1 | 0 | 0% |
| 2015 | 2 | 2 | 100% |
| 2016 | 3 | 1 | 33% |
| 2018 | 1 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2021 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lynchburg | 31 | 11 | 35% |
| Richmond | 3 | 2 | 67% |
| Salem | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Overseeding | 603SD20-0004 | LB | 30 | 15 (50%) | $3.49 | $5.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 25 | 13 (52%) | $1.00 | $1.00 |
| Flagger service | 512SD20-0027 | HR | 21 | 12 (57%) | $16.00 | $20.00 |
| Lime | 603SD20-0017 | TON | 30 | 9 (30%) | $181.00 | $200.00 |
| Allaying dust | 511SD20-0001 | HR | 23 | 9 (39%) | $30.00 | $22.00 |
| Regular seed | 603SD20-0003 | LB | 30 | 7 (23%) | $12.52 | $13.50 |
| Temp. silt fence type A | 303SD20-0034 | LF | 23 | 7 (30%) | $3.00 | $3.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 12 | 7 (58%) | $6.25 | $9.00 |
| Borrow excavation | 305SD20-0001 | CY | 10 | 7 (70%) | $9.00 | $20.00 |
| 15" pipe | 1150 | LF | 22 | 6 (27%) | $32.67 | $35.00 |
| 18" pipe | 302SD20-0028 | LF | 15 | 6 (40%) | $43.39 | $37.00 |
| Sign panel | 701SD20-0001 | SF | 12 | 6 (50%) | $30.80 | $34.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Crews Construction Company, Inc. | 7 | 4 of 7 |
| Pearson Construction, Inc. | 7 | 5 of 7 |
| Adams Construction Company | 4 | 3 of 4 |
| DLB, Inc. | 4 | 1 of 4 |
| Haymes Brothers, Inc. | 4 | 2 of 4 |
| Lanco Paving, Inc. | 3 | 1 of 3 |
| W. C. English, Incorporated | 3 | 0 of 3 |
| Ramirez Contracting, L.L.C. | 3 | 2 of 3 |
| Superior Paving Corporation | 2 | 2 of 2 |
| Apac-Atlantic, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | CM327PMG128967 | Lynchburg | 2027 plant mix - secondary | 3 of 3 | $2,295,635 | +28% |
| 25 MAR 2026 | C0000126012N01 | Lynchburg | Shoulder improvements | 1 of 2 | $3,455,483 | Low, 13% under the second |
| 04 FEB 2026 | C0000126013N01 | Lynchburg | Shoulder improvements | 4 of 4 | $8,884,180 | +16% |
| 17 DEC 2025 | C0000126197N01 | Lynchburg | 2026 plant mix - primary / rubblization | 3 of 3 | $10,797,401 | +25% |
| 24 FEB 2021 | C0000110203M01 | Lynchburg | Roadway realignment and safety improvements | 3 of 3 | $889,754 | +22% |
| 24 JUN 2020 | C0000109530M01 | Lynchburg | Smart scale - roadway alignment improvements | 1 of 3 | $1,391,827 | Low, 21% under the second |
| 22 JAN 2020 | C0000104947C01 | Lynchburg | Smart scale - shoulder widening | 2 of 3 | $1,149,781 | +15% |
| 23 MAY 2018 | C0000107014N01B | Lynchburg | Shoulder widening and safety improvements | 2 of 2 | $1,440,661 | +31% |
| 22 JUN 2016 | C000104678M01 | Lynchburg | Route 460 - construct offset right turn lane | 1 of 2 | $434,412 | Low, 13% under the second |
| 25 MAY 2016 | CN216STA106191 | Salem | Rt 936 greenhouse road rural-rustic surface treat | 3 of 3 | $453,550 | +3.0% |
| 24 FEB 2016 | C0000104945M01 | Lynchburg | Rte 501 - construct right turn lanes at rte 40 & rte 632 | 3 of 3 | $245,337 | -78% |
| 25 MAR 2015 | C00080008C01 | Lynchburg | Rte 643 - reconstruction | 1 of 3 | $1,160,574 | Low, 19% under the second |
| 25 MAR 2015 | C00104116C02B | Richmond | Adding acceleration lane | 1 of 2 | $934,439 | Low, 3.0% under the second |
| 17 DEC 2014 | C00000954C01 | Lynchburg | Grading, paving, drainage & incidentals | 2 of 3 | $3,499,465 | +7.0% |
| 20 NOV 2013 | C00015215C01 | Lynchburg | Grade, pave, drain (meadville road) | 2 of 3 | $2,387,819 | +5.0% |
| 27 FEB 2013 | C00087617C01 | Richmond | Route 137 (dundas road) bridge removal | 1 of 3 | $650,301 | Low, 5.0% under the second |
| 25 MAY 2011 | C00087994M01 | Lynchburg | Grade, drain, & asphalt pave | 3 of 3 | $387,400 | +28% |
| 26 JAN 2011 | C00092573N01 | Lynchburg | Grade, drain,& asphalt pave | 3 of 3 | $221,402 | +22% |
| 25 AUG 2010 | C00096607N01 | Lynchburg | Grade, drain, & surface treat | 1 of 3 | $73,072 | Low, 3.0% under the second |
| 28 APR 2010 | C00081238N01 | Lynchburg | Grade, drain, & asphalt pave | 2 of 3 | $198,268 | +59% |
| 08 MAR 2010 | C00096164N01 | Lynchburg | Pipe replacement, grading & incidentals | 2 of 3 | $354,527 | +13% |
| 27 MAY 2009 | C00080050N01 | Lynchburg | Rte. 831 pave in place | 1 of 3 | $464,551 | Low, 2.0% under the second |
| 25 MAR 2009 | C00080047N01 | Lynchburg | Reconstruct, surface treat, drainage structure | 2 of 3 | $424,904 | +7.0% |
| 21 MAY 2008 | C00017044M01 | Richmond | Reconstruct and surface treat non-hard surfaced road | 2 of 3 | $453,973 | +14% |
| 26 MAR 2008 | C00012564N01 | Lynchburg | Grade, drain, & asp. s. t. pave | 3 of 3 | $683,244 | +15% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.