Performance Signs, LLC: VDOT bid record

Performance Signs, LLC submitted 10 bids on Virginia DOT contracts in the data, from 14 NOV 2018 to 22 OCT 2025, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +12% above the low bid.

Owner
Virginia DOT
Low bid volume
$1,193,829
Latest bid
22 OCT 2025
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

10Bids
2Low bids
20Win rate, percent
+12%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20183133%
2019200%
2020100%
20213133%
2025100%
Performance Signs, LLC, VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Northern Virginia400%
Staunton100%
Culpeper11100%
Hampton Roads100%
Bristol100%
Salem11100%
Lynchburg100%
Performance Signs, LLC, VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Truck mounted attenuator512SD20-0023HR96 (67%)$23.32$20.00
Sign post STP-1, 2 1/2", 10 gauge700SD20-0036LF66 (100%)$19.90$30.00
Sign post STP-1, 2", 14 gauge700SD20-0034LF94 (44%)$14.00$24.00
NS mobilization on-call task order greater than $25,000 northern region513SX20-0001EACH74 (57%)$3,800.00$5,788.09
Sign panel701SD20-0001SF103 (30%)$35.00$34.00
Flagger service512SD20-0027HR93 (33%)$55.00$20.00
Remove existing 1 post sign structure700SD20-0003EACH63 (50%)$135.00$312.50
Sign post STP-1, 2 1/2", 12 gauge700SD20-0037LF53 (60%)$15.00$30.00
Remove existing 1 post sign panel700SD20-0007EACH53 (60%)$40.00$169.78
Electronic arrow board512SD20-0026HR71 (14%)$5.00$5.00
Performance Signs, LLC, VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Ces Consulting, LLC75 of 7
Ramirez Contracting, L.L.C.31 of 3
El-X Enterprises21 of 2
McClain & Co., Inc.22 of 2
Paynes Parking Designs, Inc.21 of 2
Mullen'S Markings, Inc.11 of 1
Richardson-Wayland-Ferreira, LLC10 of 1
North Construction, Inc.10 of 1
Davis H. Elliot Construction Company, Inc.10 of 1
L-M-C Safety Barricade Corporation10 of 1
Performance Signs, LLC, VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 2025C0000127217N01StauntonSafety improvements - sign installation3 of 6$1,957,166+9.0%
22 SEP 2021C0000117211N01SalemCurve delineation safety improvements1 of 3$552,738Low, 19% under the second
22 SEP 2021C0000118029N01LynchburgOn-call sign installation3 of 3$262,752+30%
22 SEP 2021C000118533N01BNorthern VirginiaOn-call signing and pavement markings2 of 3$559,865+3.0%
21 OCT 2020C0000117661N01Northern VirginiaSign and pavement marking improvements2 of 3$505,979+22%
24 JUL 2019C0000107121N01BristolRoadway warning signs and chevrons2 of 3$1,370,785+4.0%
26 JUN 2019C0000107196N01Northern VirginiaRoadway departure - curve countermeasures2 of 3$397,533+8.0%
14 NOV 2018C0000110895N01CulpeperOn-call sign contract1 of 3$641,091Low, 10% under the second
14 NOV 2018C0000112893N01Northern VirginiaCrossover mutcd compliance signing3 of 3$468,028+15%
14 NOV 2018C000109618N01Hampton RoadsReplace overhead sign structures (idsp locations)3 of 3$449,998+55%
Performance Signs, LLC: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy