VDOT contract C0000124205C01B bid tabulation
Smart scale - off ramp improvements. Let by Virginia DOT on October 28, 2026, Waynesboro, Staunton. 3 bids received; low bid $2,111,507 by S. L. Williamson Company, Incorporated.
- Owner
- Virginia DOT
- Letting
- 28 OCT 2026
- Pay items
- 106
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S. L. Williamson Company, Incorporated | $2,111,507 | Low |
| 2 | Lumin8 Transportation Technologies, LLC | $2,256,658 | +7.0% |
| 3 | Rogers Group, Inc. | $2,262,190 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S. L. Williamson Company, Incorporated | 2. Lumin8 Transportation Technologies, LLC | 3. Rogers Group, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $85,000 | $10,989 | $110,900 |
| 0001-0020 | Endwall EW-12 (302SD20-0013) | EACH | 3 | $800.00 | $5,030.00 | $552.50 |
| 0001-0030 | 30" pipe (302SD20-0047) | LF | 20 | $1,200.00 | $2,029.00 | $807.00 |
| 0001-0040 | Regular excavation (303SD20-0001) | CY | 2,809 | $82.00 | $21.50 | $46.75 |
| 0001-0050 | Temporary diversion dike (303SD20-0021) | LF | 1,214 | $15.00 | $17.60 | $37.00 |
| 0001-0060 | Check dam rock TY. II (303SD20-0023) | EACH | 24 | $400.00 | $1,024.00 | $1,000.00 |
| 0001-0070 | Dewatering basin EC-8 (303SD20-0028) | EACH | 1 | $12,500 | $7,326.00 | $8,875.00 |
| 0001-0080 | Siltation control excavation (303SD20-0029) | CY | 425 | $1.00 | $51.00 | $46.00 |
| 0001-0090 | Temp. silt fence type A (303SD20-0034) | LF | 2,467 | $3.00 | $14.70 | $8.50 |
| 0001-0100 | Borrow excavation (305SD20-0001) | CY | 519 | $110.00 | $81.00 | $136.25 |
| 0001-0110 | Geotextile subgrade stab. (305SD20-0009) | SY | 154 | $15.00 | $22.00 | $13.00 |
| 0001-0120 | Aggr. matl. no. 1 (305SD20-0010) | TON | 40 | $100.00 | $110.00 | $165.50 |
| 0001-0130 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 1,731 | $80.00 | $22.00 | $71.75 |
| 0001-0140 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 310 | $215.00 | $330.00 | $171.75 |
| 0001-0150 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 509 | $210.00 | $322.00 | $142.50 |
| 0001-0160 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 647 | $160.00 | $330.00 | $141.00 |
| 0001-0170 | Saw-cut asphalt concrete (full depth) (315SD20-0104) | LF | 1,075 | $0.25 | $3.90 | $5.00 |
| 0001-0180 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0002) | SY | 7 | $500.00 | $147.00 | $940.00 |
| 0001-0190 | Underdrain UD-4 (501SD20-0004) | LF | 921 | $25.00 | $89.00 | $38.00 |
| 0001-0200 | Outlet pipe (501SD20-0009) | LF | 57 | $20.00 | $458.00 | $178.00 |
| 0001-0210 | Concrete class A3 misc. (504SD20-0001) | CY | 3 | $1,500.00 | $11,186 | $663.00 |
| 0001-0220 | Guardrail GR-MGS1 (505SD20-0011) | LF | 75 | $39.00 | $51.00 | $37.00 |
| 0001-0230 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 297 | $49.00 | $66.00 | $47.50 |
| 0001-0240 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 75 | $46.00 | $59.00 | $42.00 |
| 0001-0250 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 1 | $4,550.00 | $5,861.00 | $4,215.00 |
| 0001-0260 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 2 | $1,800.00 | $2,198.00 | $1,600.00 |
| 0001-0270 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $1,600.00 | $2,198.00 | $1,600.00 |
| 0001-0280 | Remove existing guardrail (505SD20-0073) | LF | 691 | $12.50 | $14.70 | $10.50 |
| 0001-0290 | NS guardrail guardrail terminal site preparation (6-FT moderate) (505SX20-0058) | EACH | 1 | $3,000.00 | $2,198.00 | $6,850.00 |
| 0001-0300 | Fence FE-W1 (507SD20-0001) | LF | 192 | $75.00 | $51.00 | $39.50 |
| 0001-0310 | Line brace unit FE-W1 or FE-W2 (507SD20-0003) | EACH | 2 | $1,500.00 | $2,198.00 | $263.50 |
| 0001-0320 | Demo. of pavement flexible (508SD20-0004) | SY | 1,415 | $19.00 | $10.30 | $25.00 |
| 0001-0330 | NS modify exist. controller (510SX20-0031) | EACH | 1 | $2,600.00 | $351.00 | $6,000.00 |
| 0001-0340 | Allaying dust (511SD20-0001) | HR | 520 | $15.00 | $92.60 | $26.00 |
| 0001-0350 | Traffic barrier service MB-11A (512SD20-0003) | LF | 938 | $70.00 | $94.00 | $84.50 |
| 0001-0360 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 2 | $4,000.00 | $157.00 | $16,162 |
| 0001-0370 | Type 3 barricade 8' (512SD20-0013) | EACH | 3 | $850.00 | $793.00 | $843.00 |
| 0001-0380 | Temporary sign (512SD20-0014) | SF | 994 | $45.00 | $23.00 | $42.25 |
| 0001-0390 | Truck mounted attenuator (512SD20-0023) | HR | 360 | $30.00 | $157.00 | $100.00 |
| 0001-0400 | Group 2 channelizing devices (512SD20-0024) | DAY | 21,360 | $0.80 | $9.90 | $0.80 |
| 0001-0410 | Port.changeable mess. sign (512SD20-0025) | HR | 540 | $10.00 | $39.20 | $12.75 |
| 0001-0420 | Electronic arrow board (512SD20-0026) | HR | 240 | $10.00 | $31.00 | $10.50 |
| 0001-0430 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 527 | $13.50 | $19.00 | $13.75 |
| 0001-0440 | Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052) | EACH | 2 | $3,250.00 | $4,396.00 | $3,175.00 |
| 0001-0450 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 1,307 | $9.50 | $13.20 | $9.50 |
| 0001-0460 | Uniformed flaggers (512SP20-0003) | HR | 48 | $250.00 | $256.00 | $63.25 |
| 0001-0470 | Mobilization (513SD20-0001) | LS | 1 | $134,000 | $163,627 | $414,650 |
| 0001-0480 | Flex. pave. tie-in planing 0"-2" (515SD20-0011) | SY | 1,989 | $5.00 | $10.30 | $12.00 |
| 0001-0490 | Construction surveying constr. (517SD20-0001) | LS | 1 | $170,000 | $32,089 | $35,830 |
| 0001-0500 | Topsoil class B (602SD20-0006) | CY | 327 | $120.00 | $66.00 | $168.50 |
| 0001-0510 | Temporary seed (603SD20-0002) | LB | 81 | $12.50 | $29.00 | $5.50 |
| 0001-0520 | Regular seed (603SD20-0003) | LB | 324 | $11.00 | $22.00 | $6.50 |
| 0001-0530 | Overseeding (603SD20-0004) | LB | 260 | $6.00 | $15.00 | $7.75 |
| 0001-0540 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 3,570 | $1.75 | $1.80 | $0.60 |
| 0001-0550 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 5,191 | $2.00 | $2.20 | $1.00 |
| 0001-0560 | Fertilizer nitrogen - N (603SD20-0014) | LB | 81 | $4.50 | $5.90 | $1.75 |
| 0001-0570 | Fertilizer phosphorous - P (603SD20-0015) | LB | 57 | $4.50 | $5.90 | $1.75 |
| 0001-0580 | Fertilizer potassium - K (603SD20-0016) | LB | 57 | $4.50 | $5.90 | $1.75 |
| 0001-0590 | Lime (603SD20-0017) | TON | 5 | $450.00 | $659.00 | $341.50 |
| 0001-0600 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 630 | $3.00 | $14.70 | $2.75 |
| 0001-0610 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 2 | $147.00 | $187.00 | $311.00 |
| 0001-0620 | Remove existing 2 post sign structure (700SD20-0004) | EACH | 6 | $430.00 | $373.00 | $466.00 |
| 0001-0630 | Remove exist overhead signal sign panel (700SD20-0010) | EACH | 2 | $300.00 | $124.00 | $1,222.00 |
| 0001-0640 | Relocate EX. 2 post GRND mount SGN panel (700SD20-0013) | EACH | 4 | $23.00 | $476.00 | $758.00 |
| 0001-0650 | Via sign post W12 X 14 (700SD20-0021) | LF | 68 | $300.00 | $32.20 | $201.00 |
| 0001-0660 | Via sign post W12 X 16 (700SD20-0022) | LF | 76 | $325.00 | $34.70 | $193.00 |
| 0001-0670 | Via sign post W12 X 19 (700SD20-0023) | LF | 39 | $350.00 | $44.80 | $200.00 |
| 0001-0680 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 13 | $23.00 | $85.00 | $33.00 |
| 0001-0690 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 18 | $47.00 | $84.00 | $40.75 |
| 0001-0700 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 48 | $40.00 | $84.00 | $42.25 |
| 0001-0710 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 25 | $32.00 | $84.00 | $37.00 |
| 0001-0720 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 3 | $890.00 | $284.00 | $700.00 |
| 0001-0730 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 3 | $1,580.00 | $566.00 | $1,475.00 |
| 0001-0740 | Conc. found. SSP-via, 3' dia. X 7' deep (700SD20-0049) | EACH | 10 | $6,000.00 | $6,770.00 | $6,232.25 |
| 0001-0750 | Conc. found. PF-8 (700SD20-0068) | CY | 14 | $2,250.00 | $2,363.00 | $3,015.00 |
| 0001-0760 | Signal mast arm pole MP- 3, TY. B1 (700SD20-0091) | EACH | 1 | $25,000 | $30,111 | $31,775 |
| 0001-0770 | Signal mast arm pole MP- 3, TY. C (700SD20-0093) | EACH | 1 | $31,500 | $37,699 | $32,571 |
| 0001-0780 | Mast arm 60' (700SD20-0101) | EACH | 2 | $15,200 | $17,736 | $16,695 |
| 0001-0790 | Mast arm 70' (700SD20-0103) | EACH | 1 | $20,500 | $21,767 | $19,000 |
| 0001-0800 | 14/7 conductor cable (700SD20-0114) | LF | 2,424 | $6.00 | $4.80 | $4.75 |
| 0001-0810 | Cat 5E direct burial cable (700SD20-0124) | LF | 815 | $5.00 | $2.60 | $3.75 |
| 0001-0820 | 8 conductor cable egc (700SD20-0148) | LF | 436 | $5.00 | $2.20 | $3.50 |
| 0001-0830 | Junction box JB-S2 (700SD20-0178) | EACH | 1 | $2,500.00 | $1,221.00 | $4,700.00 |
| 0001-0840 | Bored conduit 3" (700SD20-0192) | LF | 73 | $54.00 | $81.00 | $111.25 |
| 0001-0850 | Conduit PVC 3" (700SD20-0195) | LF | 37 | $10.00 | $23.20 | $8.25 |
| 0001-0860 | Trench excavation eci-1 (700SD20-0197) | LF | 37 | $11.00 | $26.60 | $55.00 |
| 0001-0870 | Test bore (700SD20-0199) | EACH | 2 | $25,000 | $6,593.00 | $8,950.00 |
| 0001-0880 | NS traffic signalization modify existing junction box (700SX20-0010) | EACH | 4 | $2,000.00 | $359.00 | $2,600.00 |
| 0001-0890 | NS traffic signalization modify existing signal (700SX20-0010) | EACH | 1 | $7,500.00 | $2,052.00 | $5,955.00 |
| 0001-0900 | Sign panel (701SD20-0001) | SF | 371 | $67.00 | $34.90 | $70.00 |
| 0001-0910 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 29 | $520.00 | $446.00 | $668.50 |
| 0001-0920 | Video detection camera (703SD20-0014) | EACH | 3 | $11,500 | $13,629 | $9,321.50 |
| 0001-0930 | Video detection system (703SD20-0016) | EACH | 1 | $24,750 | $11,206 | $8,985.00 |
| 0001-0940 | Evp detection system 3- way (703SD20-0022) | EACH | 1 | $13,250 | $10,007 | $15,242 |
| 0001-0950 | Evp detector cable (703SD20-0024) | LF | 753 | $7.00 | $3.60 | $5.00 |
| 0001-0960 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 9 | $700.00 | $867.00 | $797.50 |
| 0001-0970 | Remove existing pole (703SD20-0044) | EACH | 3 | $2,500.00 | $1,017.00 | $2,115.00 |
| 0001-0980 | Remove existing foundation (703SD20-0045) | EACH | 3 | $3,000.00 | $585.00 | $2,940.00 |
| 0001-0990 | Remove existing signal head (703SD20-0046) | EACH | 7 | $225.00 | $249.00 | $793.50 |
| 0001-1000 | Remove existing manhole/junction box (703SD20-0048) | EACH | 4 | $560.00 | $330.00 | $1,645.00 |
| 0001-1010 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 3,113 | $4.00 | $5.50 | $4.00 |
| 0001-1020 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 129 | $4.00 | $5.50 | $4.00 |
| 0001-1030 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 68 | $42.00 | $58.60 | $42.00 |
| 0001-1040 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 6 | $1,200.00 | $1,612.00 | $1,160.00 |
| 0001-1050 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 6 | $375.00 | $513.00 | $369.00 |
| 0001-1060 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 3 | $675.00 | $952.00 | $685.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of October 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.