VDOT contract C0000128729N01 bid tabulation
2027 plant mix - primary. Let by Virginia DOT on July 22, 2026, Madison, Culpeper. 3 bids received; low bid $2,241,640 by Chemung Contracting Corporation.
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 13
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chemung Contracting Corporation | $2,241,640 | Low |
| 2 | S. L. Williamson Company, Incorporated | $2,358,304 | +5.0% |
| 3 | Superior Paving Corporation | $2,580,046 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chemung Contracting Corporation | 2. S. L. Williamson Company, Incorporated | 3. Superior Paving Corporation |
|---|---|---|---|---|---|---|
| 0001-0010 | Tack coat (310SD20-0001) | GAL | 19,936.10 | $0.01 | $0.05 | $0.01 |
| 0001-0020 | Rumble strip sinusoidal asphalt (315SD20-0052) | LF | 63,472 | $0.26 | $0.26 | $0.36 |
| 0001-0030 | Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049) | TON | 16,981.48 | $91.00 | $111.00 | $110.00 |
| 0001-0040 | Travel lane patching (patch mix type) IM-19.0A (323SD20-0030) | TON | 608 | $91.00 | $95.00 | $147.50 |
| 0001-0050 | Flagger service (512SD20-0027) | HR | 793 | $35.00 | $32.00 | $35.00 |
| 0001-0060 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 498,635 | $0.01 | $0.05 | $0.01 |
| 0001-0070 | Maintenance of traffic (512SP20-0002) | LS | 1 | $55,000 | $15,000 | $85,000 |
| 0001-0080 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 194,073.86 | $1.40 | $0.35 | $1.35 |
| 0001-0090 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 249,318 | $0.90 | $0.90 | $0.77 |
| 0001-0100 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 175 | $1.83 | $1.85 | $2.40 |
| 0001-0110 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 411 | $11.42 | $11.45 | $10.33 |
| 0001-0120 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 844 | $39.65 | $39.65 | $25.00 |
| 0001-0130 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 13 | $152.73 | $152.75 | $144.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.