VDOT contract C0000128729N01 bid tabulation

2027 plant mix - primary. Let by Virginia DOT on July 22, 2026, Madison, Culpeper. 3 bids received; low bid $2,241,640 by Chemung Contracting Corporation.

Owner
Virginia DOT
Letting
22 JUL 2026
Pay items
13
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Chemung Contracting Corporation$2,241,640Low
2S. L. Williamson Company, Incorporated$2,358,304+5.0%
3Superior Paving Corporation$2,580,046+15%
VDOT contract C0000128729N01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Chemung Contracting Corporation2. S. L. Williamson Company, Incorporated3. Superior Paving Corporation
0001-0010Tack coat (310SD20-0001)GAL19,936.10$0.01$0.05$0.01
0001-0020Rumble strip sinusoidal asphalt (315SD20-0052)LF63,472$0.26$0.26$0.36
0001-0030Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049)TON16,981.48$91.00$111.00$110.00
0001-0040Travel lane patching (patch mix type) IM-19.0A (323SD20-0030)TON608$91.00$95.00$147.50
0001-0050Flagger service (512SD20-0027)HR793$35.00$32.00$35.00
0001-0060Temp. PVMT MRKG TY. A, 4" (512SD20-0046)LF498,635$0.01$0.05$0.01
0001-0070Maintenance of traffic (512SP20-0002)LS1$55,000$15,000$85,000
0001-0080Flexible pave.planing 0"-2" (515SD20-0013)SY194,073.86$1.40$0.35$1.35
0001-0090Type B class I PVMT line MRKG 4" (704SD20-0006)LF249,318$0.90$0.90$0.77
0001-0100Type B class I PVMT line MRKG 6" (704SD20-0007)LF175$1.83$1.85$2.40
0001-0110Type B class I PVMT line MRKG 24" (704SD20-0010)LF411$11.42$11.45$10.33
0001-0120Inlaid pavement marker asphalt (704SD20-0032)EACH844$39.65$39.65$25.00
0001-0130PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047)EACH13$152.73$152.75$144.00
VDOT contract C0000128729N01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy