VDOT contract C0000128015P01 bid tabulation
2026 plant mix - secondary. Let by Virginia DOT on November 19, 2025, Prince William, Northern Virginia. 6 bids received; low bid $3,433,555 by Julius Branscome, Inc..
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 20
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Julius Branscome, Inc. | $3,433,555 | Low |
| 2 | Superior Paving Corporation | $3,647,077 | +6.0% |
| 3 | Arthur Construction Co., Inc. | $3,765,551 | +10% |
| 4 | Chemung Contracting Corporation | $4,206,980 | +23% |
| 5 | Allan Myers Va, Inc. | $4,999,777 | +46% |
| 6 | EUROVIA ATLANTIC COAST LLC dba VIRGINIA | $5,062,741 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Julius Branscome, Inc. | 2. Superior Paving Corporation | 3. Arthur Construction Co., Inc. | 4. Chemung Contracting Corporation | 5. Allan Myers Va, Inc. | 6. EUROVIA ATLANTIC COAST LLC dba VIRGINIA |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Inlet protection type B (303SD20-0031) | EACH | 72 | $0.01 | $1.00 | $5.00 | $15.00 | $1.00 | $125.00 |
| 0001-0020 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 445 | $38.00 | $67.00 | $50.00 | $50.00 | $84.44 | $65.00 |
| 0001-0030 | Tack coat (310SD20-0001) | GAL | 20,586 | $0.01 | $0.01 | $0.01 | $0.01 | $2.46 | $0.01 |
| 0001-0040 | Asph. conc. TY. IM-19.0A maint (315SD20-0040) | TON | 3,527.93 | $84.00 | $91.00 | $90.00 | $87.00 | $92.00 | $116.50 |
| 0001-0050 | Asph. conc. BMD P+VO SM- 9.5A (315SP20-0048) | TON | 27,832.37 | $91.25 | $95.00 | $92.00 | $92.00 | $150.22 | $126.00 |
| 0001-0060 | Surface preparation and restoration type II (323SD20-0041) | TON | 1,488 | $70.00 | $65.00 | $85.00 | $104.00 | $88.00 | $224.44 |
| 0001-0070 | Flagger service (512SD20-0027) | HR | 1,775 | $30.00 | $31.00 | $25.00 | $35.00 | $28.79 | $38.00 |
| 0001-0080 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 47,671 | $0.47 | $0.46 | $0.25 | $0.46 | $0.49 | $0.55 |
| 0001-0090 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 200 | $0.48 | $0.47 | $0.50 | $0.47 | $0.50 | $0.55 |
| 0001-0100 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 200 | $0.50 | $0.49 | $0.50 | $0.49 | $0.52 | $0.60 |
| 0001-0110 | Temp. PVMT MRKG TY. A, 24" (512SD20-0050) | LF | 248 | $12.24 | $12.00 | $13.00 | $12.00 | $12.65 | $13.25 |
| 0001-0120 | NS maintenance of traffic MOT (512SP20-0002) | LS | 1 | $28,000 | $85,000 | $107,613 | $280,000 | $29,994 | $100,000 |
| 0001-0130 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 242,033.44 | $1.00 | $1.00 | $1.65 | $2.55 | $0.25 | $1.60 |
| 0001-0140 | Flexible pavement planing above 2"-4" (515SD20-0014) | SY | 28,799.46 | $1.22 | $2.00 | $2.50 | $3.00 | $0.40 | $3.00 |
| 0001-0150 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 47,671 | $1.53 | $1.50 | $1.65 | $1.50 | $1.58 | $1.70 |
| 0001-0160 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 200 | $7.14 | $7.00 | $7.50 | $7.00 | $7.38 | $7.75 |
| 0001-0170 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 200 | $7.14 | $7.00 | $7.50 | $7.00 | $7.38 | $7.75 |
| 0001-0180 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 768 | $19.38 | $19.00 | $21.00 | $19.00 | $20.04 | $21.00 |
| 0001-0190 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 11 | $132.60 | $130.00 | $145.00 | $130.00 | $137.09 | $145.00 |
| 0002-0200 | NS select material alternate shoulder materials (305SX20-0006) | TON | 1 | $38.00 | $65.00 | $100.00 | $50.00 | $0.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.