VDOT contract C0000127852N01 bid tabulation
Shoulder widening, rumble strips and guardrail installation. Let by Virginia DOT on April 22, 2026, Augusta, Staunton. 3 bids received; low bid $2,009,518 by B & S Contracting, Inc..
- Owner
- Virginia DOT
- Letting
- 22 APR 2026
- Pay items
- 30
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | B & S Contracting, Inc. | $2,009,518 | Low |
| 2 | Adams Construction Company | $2,555,778 | +27% |
| 3 | S. L. Williamson Company, Incorporated | $2,684,672 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. B & S Contracting, Inc. | 2. Adams Construction Company | 3. S. L. Williamson Company, Incorporated |
|---|---|---|---|---|---|---|
| 0001-0010 | Siltation control excavation (303SD20-0029) | CY | 225 | $1.00 | $1.00 | $1.00 |
| 0001-0020 | Temp. silt fence type A (303SD20-0034) | LF | 1,500 | $1.00 | $1.00 | $1.00 |
| 0001-0030 | Machining shoulders (305SP20-0005) | LF | 3,162 | $10.50 | $11.07 | $11.00 |
| 0001-0040 | Aggr. base matl. TY. I no. 21B (309SD20-0010) | TON | 6,896 | $52.00 | $52.00 | $60.00 |
| 0001-0050 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 3,206 | $106.25 | $142.50 | $125.00 |
| 0001-0060 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 5,802 | $99.50 | $151.75 | $170.00 |
| 0001-0070 | Rumble strip cylindrical asphalt (315SD20-0015) | LF | 116,522 | $0.25 | $0.25 | $0.25 |
| 0001-0080 | Guardrail GR-MGS1 (505SD20-0011) | LF | 2,200 | $37.25 | $38.75 | $40.00 |
| 0001-0090 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 212.50 | $53.00 | $55.36 | $60.00 |
| 0001-0100 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 50 | $42.50 | $44.28 | $50.00 |
| 0001-0110 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 25 | $4,250.00 | $4,428.43 | $4,500.00 |
| 0001-0120 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 2 | $1,600.00 | $1,660.66 | $1,750.00 |
| 0001-0130 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 18 | $1,600.00 | $1,660.66 | $1,750.00 |
| 0001-0140 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 37.50 | $212.75 | $221.42 | $210.00 |
| 0001-0150 | Guardrail GR-2 (505SD20-0030) | LF | 425 | $37.25 | $38.75 | $45.00 |
| 0001-0160 | Alt.breakaway cable term. GR-9 (505SD20-0038) | EACH | 4 | $4,250.00 | $4,428.43 | $4,500.00 |
| 0001-0170 | Guardrail GR-10 (505SD20-0040) | LF | 50 | $48.00 | $49.82 | $55.00 |
| 0001-0180 | Remove existing guardrail (505SD20-0073) | LF | 4,900 | $10.50 | $11.07 | $15.00 |
| 0001-0190 | NS guardrail guardrail end terminal site preparation, 4’ moderate (505SX20-0004) | EACH | 29 | $800.00 | $830.33 | $1,000.00 |
| 0001-0200 | Truck mounted attenuator (512SD20-0023) | HR | 200 | $15.00 | $2.50 | $10.00 |
| 0001-0210 | Group 2 channelizing devices (512SD20-0024) | DAY | 100 | $1.00 | $1.00 | $25.00 |
| 0001-0220 | Port.changeable mess. sign (512SD20-0025) | HR | 2,000 | $5.00 | $7.50 | $10.00 |
| 0001-0230 | Electronic arrow board (512SD20-0026) | HR | 200 | $5.00 | $0.01 | $5.00 |
| 0001-0240 | Flagger service (512SD20-0027) | HR | 1,200 | $54.00 | $47.50 | $40.00 |
| 0001-0250 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 140,343 | $0.05 | $0.24 | $0.20 |
| 0001-0260 | Portable temporary rumble strip array (512SP20-0001) | DAY | 100 | $1.00 | $2.50 | $1.00 |
| 0001-0270 | Mobilization (513SD20-0001) | LS | 1 | $91,459 | $90,094 | $164,001 |
| 0001-0280 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 12,947 | $2.25 | $8.67 | $3.00 |
| 0001-0290 | Mailbox post, single (521SD20-0001) | EACH | 8 | $1.00 | $100.00 | $50.00 |
| 0001-0300 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 140,343 | $0.79 | $0.84 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of April 22, 2026. Compiled by Mirage Metrics.