VDOT contract C000121648C501B bid tabulation

Safety improvements - interchange lighting. Let by Virginia DOT on June 24, 2026, Augusta, Staunton. 3 bids received; low bid $2,263,907 by Creative Design Concepts, Inc..

Owner
Virginia DOT
Letting
24 JUN 2026
Pay items
37
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Creative Design Concepts, Inc.$2,263,907Low
2Lumin8 Transportation Technologies, LLC$2,761,113+22%
3Richardson-Wayland-Ferreira, LLC$2,895,386+28%
VDOT contract C000121648C501B: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Creative Design Concepts, Inc.2. Lumin8 Transportation Technologies, LLC3. Richardson-Wayland-Ferreira, LLC
0001-0010Clearing and grubbing (301SD20-0001)LS1$42,598$32,904$7,529.10
0001-0020Temp. silt fence type A (303SD20-0034)LF2,500$15.00$7.20$4.28
0001-0030Rock excavation (303SX20-0005)CY100$2,241.00$556.00$2,000.00
0001-0040Salvage EX. guardrail (505SD20-0001)LF125$115.00$86.00$26.25
0001-0050Install salv. guardrail (505SD20-0004)LF125$145.00$165.00$52.50
0001-0060NS modify exist. transformer connection (510SX20-0031)EACH1$9,082.00$2,142.00$6,242.88
0001-0070NS install vdot furnished field ethernet switch (510SX20-0070)EACH1$2,765.00$325.00$1,264.10
0001-0080NS install vdot furnished field router (510SX20-0070)EACH1$2,980.00$650.00$1,264.10
0001-0090NS install vdot furnished inclement weather lighting programable logic controller (510SX20-0070)EACH1$8,864.00$1,319.00$2,528.17
0001-0100NS install vdot furnished SFP module (510SX20-0070)EACH2$2,248.00$56.00$1,264.09
0001-0110Maintenance of traffic lighting at exit 99 (512SP20-0002)LS1$95,678$360,881$330,000
0001-0120Mobilization (513SD20-0001)LS1$65,939$246,341$320,000
0001-0130Construction surveying constr. (517SD20-0001)LS1$45,500$21,936$26,250
0001-0140NS asbestos removal management of naturally-ocurring asbestos (522SX20-0004)LS1$185,980$209,763$516,414
0001-01501 conductor cable (700SD20-0140)LF45$15.00$10.30$39.74
0001-01604 conductor cable (700SD20-0142)LF8,745$8.00$4.40$4.98
0001-01706 conductor cable (700SD20-0143)LF6,770$7.00$3.10$3.44
0001-018010 conductor cable (700SD20-0145)LF3,985$5.00$1.50$3.23
0001-01908 conductor cable egc (700SD20-0148)LF1,115$6.00$3.90$3.52
0001-0200Conc. found. LF-1, TY. A (700SD20-0149)EACH35$5,580.00$4,000.00$10,009
0001-0210Lighting pole LP-2 type C (700SD20-0155)EACH6$7,098.00$5,884.00$6,190.57
0001-0220Lighting pole LP-2 type D (700SD20-0156)EACH3$7,455.00$6,314.00$6,507.89
0001-0230Electrical service work pad (700SD20-0174)EACH1$2,852.00$812.00$1,602.38
0001-0240Junction box JB-S2 (700SD20-0178)EACH38$2,788.00$1,424.00$4,083.54
0001-0250Elect. ser. GRD. electrode 10' (700SD20-0181)EACH6$225.00$140.00$296.71
0001-0260Bored conduit 2" (700SD20-0191)LF11,120$55.00$102.00$35.00
0001-0270Conduit PVC 2" (700SD20-0194)LF670$20.00$11.20$5.58
0001-0280Conduit PVC 3" (700SD20-0195)LF15$26.00$25.40$8.97
0001-0290Trench excavation eci-1 (700SD20-0197)LF685$45.00$28.90$18.90
0001-0300Lighting pole LP-1 25' MNTG HT (700SD20-0217)EACH26$6,990.00$4,830.00$6,088.64
0001-0310Luminaire arm 18' (700SD20-0225)EACH26$2,432.00$2,550.00$4,150.10
0001-0320NS concrete foundation lighting control center foundation (700SX20-0023)CY2$4,988.00$7,954.00$6,032.40
0001-0330NS luminaire type 4, 119 watt (705SX20-0001)EACH36$1,188.00$1,092.00$1,831.14
0001-0340NS lighting control center (705SX20-0002)EACH1$25,990$46,273$51,821
0001-0350Fiber optic cable 24 strand (808SD20-0001)LF120$20.00$9.20$14.30
0001-0360Pre-terminated fiber patch panel (808SD20-0005)EACH1$4,323.00$1,143.00$2,265.41
0001-0370Underground splice enclosure (808SD20-0006)EACH1$4,242.00$1,959.00$3,853.31
VDOT contract C000121648C501B: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of June 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy