VDOT contract CM226PMZ126927 bid tabulation

2026 plant mix - secondary. Let by Virginia DOT on November 19, 2025, Bedford, Franklin, Salem. 2 bids received; low bid $5,461,416 by Adams Construction Company.

Owner
Virginia DOT
Letting
19 NOV 2025
Pay items
15
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Adams Construction Company$5,461,416Low
2Superior Paving Corporation$5,990,476+10%
VDOT contract CM226PMZ126927: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Adams Construction Company2. Superior Paving Corporation
0001-0010Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003)TON6,322.80$65.00$59.30
0001-0020Tack coat (310SD20-0001)GAL40,021$3.00$3.00
0001-0030Asph. conc. TY. IM-19.0D maint (315SD20-0043)TON3,776.44$100.00$118.50
0001-0040Pavement shoulder wedge prep. const (315SP20-0006)LF221,443$0.10$0.20
0001-0050Asph. conc. BMD P+VO SM- 9.5A (315SP20-0048)TON33,583.20$105.00$120.00
0001-0060Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049)TON3,580.88$115.00$124.00
0001-0070Flagger service (512SD20-0027)HR2,805$35.00$38.00
0001-0080Eradicate nonlinear PVMT MRKG (512SD20-0043)SF197$12.50$25.00
0001-0090Temp. PVMT MRKG TY. A, 4" (512SD20-0046)LF361,153$0.12$0.16
0001-0100NS maintenance of traffic plant mix (512SP20-0002)LS1$200,000$137,900
0001-0110Flex. pave. tie-in planing 0"-2" (515SD20-0011)SY7,942.29$15.00$12.00
0001-0120Type A PVMT line MRKG 4" (704SD20-0001)LF334,543$0.35$0.32
0001-0130Type B class II PVMT line MRKG 12" (704SD20-0014)LF220$14.75$32.00
0001-0140NS pavement marking preformed thermo pave. line mark. rumble strips 4" TY. B. CL. II (704SX20-0001)LF260$35.00$50.00
0002-0150NS select material alternate shoulder material (305SX20-0006)TON1$0.00$60.00
VDOT contract CM226PMZ126927: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy