VDOT contract CM426PMM127945 bid tabulation

2026 plant mix - primary/secondary. Let by Virginia DOT on January 14, 2026, Mecklenburg, Richmond. 1 bid received; low bid $6,952,278 by Adams Construction Company.

Owner
Virginia DOT
Letting
14 JAN 2026
Pay items
32
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Adams Construction Company$6,952,278Low
VDOT contract CM426PMM127945: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Adams Construction Company
0001-0010Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003)TON696.95$53.00
0001-0020Tack coat (310SD20-0001)GAL42,651$0.01
0001-0030Rumble strip sinusoidal asphalt (315SD20-0052)LF174,551$0.24
0001-0040Pavement shoulder wedge prep. const (315SP20-0006)LF75,187$0.20
0001-0050Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049)TON4,354.01$114.00
0001-0060Asph. conc. BMD P+VO SM- 12.5D (315SP20-0051)TON40,945.96$110.00
0001-0070Travel lane patching (patch mix type) IM-19.0D (323SD20-0030)TON1,678.35$155.00
0001-0080Flagger service (512SD20-0027)HR1,675$40.00
0001-0090Eradicate linear PVMT MRKG (512SD20-0042)LF41,675$0.36
0001-0100Eradicate nonlinear PVMT MRKG (512SD20-0043)SF193$19.00
0001-0110Temp. PVMT MRKG TY. A, 4" (512SD20-0046)LF278,290$0.14
0001-0120Temp. PVMT MRKG TY. A, 6" (512SD20-0047)LF355,889$0.17
0001-0130Temp. PVMT MRKG TY. A, 8" (512SD20-0048)LF1,675$0.55
0001-0140Temp. PVMT MRKG TY. A, 12" (512SD20-0049)LF4,600$0.65
0001-0150NS maintenance of traffic maintenance of traffic (512SP20-0002)LS1$373,000
0001-0160Flex. pave. tie-in planing 0"-2" (515SD20-0011)SY1,440.02$6.00
0001-0170Flexible pave.planing 0"-2" (515SD20-0013)SY392,078.70$1.70
0001-0180Type B class I PVMT line MRKG 4" (704SD20-0006)LF180,491$0.71
0001-0190Type B class I PVMT line MRKG 6" (704SD20-0007)LF175,755$0.78
0001-0200Type B class I PVMT line MRKG 8" (704SD20-0008)LF1,585$5.00
0001-0210Type B class I PVMT line MRKG 12" (704SD20-0009)LF2,180$8.00
0001-0220Type B class I PVMT line MRKG 24" (704SD20-0010)LF1,898$14.00
0001-0230Inlaid pavement marker asphalt (704SD20-0032)EACH737$31.00
0001-0240PVMT MSG. mark. R/R crossing TY. B, CL. I (704SD20-0041)EACH2$1,050.00
0001-0250PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047)EACH61$120.00
0001-0260DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050)EACH5$215.00
0001-0270Symb MRKG lane reduction arr TY B CL I (704SD20-0059)EACH2$205.00
0001-0280PVMT MSG. mark. “only” TY B, CL. I, 8’ (704SD20-0107)EACH2$550.00
0001-0290PVMT MSG. mark. “school” TY B, CL I, 8’ (704SD20-0110)EACH3$600.00
0001-0300PVMT MSG. mark. “school” TY B, CL I, 10' (704SD20-0123)EACH2$750.00
0001-0310NS pavement marking thermoplastic rumble strip (704SX20-0001)LF690$7.00
0002-0320NS select material alternate shoulder material (305SX20-0006)TON1$53.00
VDOT contract CM426PMM127945: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of January 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy