VDOT contract CM626PMK127625 bid tabulation
2026 plant mix - primary/secondary. Let by Virginia DOT on February 4, 2026, King George, Stafford, Westmoreland, Fredericksburg. 3 bids received; low bid $4,776,260 by Superior Paving Corporation.
- Owner
- Virginia DOT
- Letting
- 04 FEB 2026
- Pay items
- 36
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Superior Paving Corporation | $4,776,260 | Low |
| 2 | EUROVIA ATLANTIC COAST LLC dba VIRGINIA | $4,887,634 | +2.0% |
| 3 | Allan Myers Va, Inc. | $4,977,777 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Paving Corporation | 2. EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 3. Allan Myers Va, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 28.39 | $300.00 | $90.00 | $180.00 |
| 0001-0020 | Tack coat (310SD20-0001) | GAL | 29,535 | $0.01 | $0.01 | $0.01 |
| 0001-0030 | Rumble strip cylindrical asphalt (315SD20-0015) | LF | 27,571 | $0.23 | $0.68 | $0.23 |
| 0001-0040 | Rumble strip sinusoidal asphalt (315SD20-0052) | LF | 81,574 | $0.23 | $0.68 | $0.23 |
| 0001-0050 | Pavement shoulder wedge prep. const (315SP20-0006) | LF | 51,744 | $0.01 | $0.01 | $0.01 |
| 0001-0060 | Asph. conc. BMD P+VO SM- 12.5D (315SP20-0051) | TON | 35,977.26 | $99.00 | $93.00 | $109.98 |
| 0001-0070 | Asph. conc. TY. IM-19.0A T maint (321SD20-0001) | TON | 1,695.94 | $126.50 | $101.75 | $110.00 |
| 0001-0080 | Travel lane patching (patch mix type) IM-19.0A patching (323SD20-0030) | TON | 1,046 | $190.00 | $135.00 | $180.00 |
| 0001-0090 | Flagger service (512SD20-0027) | HR | 1,333 | $32.00 | $34.50 | $29.00 |
| 0001-0100 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 2,290 | $1.50 | $1.50 | $1.50 |
| 0001-0110 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 464,951 | $0.01 | $0.01 | $0.01 |
| 0001-0120 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 2,526 | $2.32 | $2.30 | $2.32 |
| 0001-0130 | NS maintenance of traffic plant mix (512SP20-0002) | LS | 1 | $110,000 | $186,000 | $10,294 |
| 0001-0140 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 318,907.35 | $0.25 | $1.20 | $0.10 |
| 0001-0150 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 29,016 | $1.00 | $1.00 | $1.00 |
| 0001-0160 | Conduit PVC 1" (700SD20-0182) | LF | 320 | $5.00 | $5.00 | $5.00 |
| 0001-0170 | Loop saw cut 3/8" (703SD20-0042) | LF | 8,658 | $12.00 | $12.00 | $12.00 |
| 0001-0180 | Loop saw cut 5/8" (703SD20-0043) | LF | 1,770 | $35.00 | $35.00 | $35.00 |
| 0001-0190 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 62,454 | $0.68 | $0.70 | $0.68 |
| 0001-0200 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 183,854 | $0.86 | $0.86 | $0.86 |
| 0001-0210 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 610 | $1.73 | $1.75 | $1.73 |
| 0001-0220 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 4,149 | $8.36 | $8.40 | $8.36 |
| 0001-0230 | Type B class VI contrast PVMT line MRKG 6" (704SD20-0031) | LF | 2,290 | $9.52 | $9.55 | $9.52 |
| 0001-0240 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 1,368 | $27.72 | $27.75 | $27.72 |
| 0001-0250 | PVMT MSG. mark. R/R crossing TY. B, CL. I (704SD20-0041) | EACH | 1 | $825.41 | $825.50 | $825.41 |
| 0001-0260 | PVMT symb MRKG thru arrow TY B, CL I (704SD20-0044) | EACH | 5 | $137.53 | $137.50 | $137.53 |
| 0001-0270 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 148 | $111.39 | $111.50 | $111.39 |
| 0001-0280 | DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050) | EACH | 8 | $185.59 | $185.75 | $185.59 |
| 0001-0290 | Symb MRKG lane reduction arr TY B CL I (704SD20-0059) | EACH | 2 | $652.49 | $652.50 | $652.49 |
| 0001-0300 | PVMT MSG. mark. “only” TY B, CL. I, 8’ (704SD20-0107) | EACH | 5 | $324.94 | $325.00 | $324.94 |
| 0001-0310 | PVMT MSG. mark. “school” TY B, CL I, 10' (704SD20-0123) | EACH | 2 | $651.14 | $651.25 | $651.14 |
| 0001-0320 | NS pavement marking transverse raised rumblestrips (704SX20-0002) | EACH | 2 | $711.58 | $711.75 | $711.58 |
| 0001-0330 | NS pave. message marking signal ahead TY. B. CL. I (704SX20-0005) | EACH | 1 | $1,295.17 | $1,295.00 | $1,295.17 |
| 0001-0340 | NS pave. message marking stop ahead TY. B. CL. I (704SX20-0005) | EACH | 1 | $675.59 | $680.00 | $675.59 |
| 0001-0350 | NS pave. message marking stop TY. B. CL. I (704SX20-0005) | EACH | 1 | $556.70 | $556.75 | $556.70 |
| 0002-0360 | NS select material alternate shoulder material (305SX20-0006) | TON | 1 | $300.00 | $85.00 | $178.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.