American Construction Co., Inc: WSDOT bid record
American Construction Co., Inc submitted 22 bids on Washington State DOT contracts in the data, from 31 JAN 2001 to 05 JAN 2022, and was the low bidder on 8 of them (36%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $15,280,754
- Latest bid
- 05 JAN 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 1 | 0 | 0% |
| 2004 | 1 | 1 | 100% |
| 2005 | 1 | 0 | 0% |
| 2006 | 2 | 2 | 100% |
| 2009 | 1 | 1 | 100% |
| 2010 | 5 | 0 | 0% |
| 2011 | 2 | 1 | 50% |
| 2012 | 3 | 1 | 33% |
| 2015 | 2 | 1 | 50% |
| 2016 | 1 | 0 | 0% |
| 2017 | 1 | 1 | 100% |
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 9 | 20 | 6 | 30% |
| NWR region | 1 | 1 | 100% |
| SWR region | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Epoxy-coated steel reinf. bar | LB | 5 | 2 (40%) | $3.50 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Manson Construction Co. | 17 | 3 of 17 |
| Quigg Bros., Inc. | 9 | 2 of 9 |
| General Construction Company | 7 | 3 of 7 |
| Pacific Pile & Marine, L.P. | 7 | 2 of 7 |
| Epic Construction, LLC | 5 | 2 of 5 |
| McClure & Sons, Inc. | 5 | 2 of 5 |
| Redside Construction, LLC | 4 | 2 of 4 |
| Razz Construction, Inc. | 4 | 1 of 4 |
| Culbertson Marine Construction | 4 | 0 of 4 |
| Mowat Construction Company | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 JAN 2022 | 009737 | Region 9 | Sr 305 bainbridge ferry terminal ohl walkway replacement & cab rehab | 2 of 9 | $22,915,393 | +6.0% |
| 14 APR 2021 | 009663 | Region 9 | Systemwide on-call off-shore maintenance | 2 of 3 | $1,662,403 | +3.0% |
| 26 APR 2017 | 009075 | Region 9 | Systemwide on-call off-shore maintenance | 1 of 4 | $1,110,948 | Low, 2.0% under the second |
| 07 DEC 2016 | 008985 | Region 9 | Sr519 seattle ferry terminal timber pile preservation 16x161 | 2 of 4 | $445,298 | +2.0% |
| 15 APR 2015 | 008736 | Region 9 | Sr 20 spur anacortes tml tie-up slips dolphin & wingwall replacement 11w014 | 2 of 5 | $3,442,724 | 0.0% |
| 07 JAN 2015 | 008694 | Region 9 | Sr 20 coupeville ferry terminal apron replacement 15w091 | 1 of 5 | $423,499 | Low, 8.0% under the second |
| 04 APR 2012 | 008264 | Region 9 | Sr 305 eagle harbor maintenance facility slip e mech rehab & seismic retrofit | 2 of 5 | $274,499 | +21% |
| 14 MAR 2012 | 008254 | Region 9 | Sr 20 port townsend ferry terminal slip 1 transfer span fabrication | 1 of 4 | $2,027,079 | Low, 6.0% under the second |
| 11 JAN 2012 | 008235 | Region 9 | Sr 20 spur lopez island ferry terminal floating wingwall rehabilitation | 5 of 6 | $2,640,099 | +35% |
| 27 APR 2011 | 008125 | Region 9 | Eagle harbor maintenance building bent 11 pile cap repair | 3 of 3 | $157,395 | +98% |
| 12 JAN 2011 | 008078 | SWR region | I-5 columbia river bridge temporary pile test program | 1 of 3 | $811,204 | Low, 5.0% under the second |
| 01 DEC 2010 | 008044 | Region 9 | Bremerton ferry terminal slip 1 seismic retrofit | 2 of 10 | $69,599 | +25% |
| 01 DEC 2010 | 008043 | Region 9 | Coupeville ferry terminal seismic retrofit | 2 of 9 | $34,499 | +13% |
| 14 APR 2010 | 007922 | Region 9 | Shaw island ferry terminal dolphin replacement | 2 of 5 | $1,895,028 | +1.0% |
| 03 MAR 2010 | 007898 | Region 9 | Seattle ferry terminal anchor chain replacment | 6 of 7 | $230,749 | +57% |
| 24 FEB 2010 | 007888 | Region 9 | Bainbridge island ferry terminal slip 1 seismic retrofit | 3 of 8 | $54,299 | +9.0% |
| 02 DEC 2009 | 007851 | Region 9 | Keystone ferry terminal wingwall replacement | 1 of 4 | $987,617 | Low, 8.0% under the second |
| 29 MAR 2006 | 007119 | NWR region | Sr 539 ten mile rd to sr 546 - test piles | 1 of 4 | $397,969 | Low, 2.0% under the second |
| 11 JAN 2006 | 007077 | Region 9 | Bainbridge island ferry terminal timber overhead walkway repairs | 1 of 6 | $137,199 | Low, 21% under the second |
| 21 DEC 2005 | 007068 | Region 9 | Southworth ferry terminal deck replacement | 5 of 7 | $878,696 | +19% |
| 31 MAR 2004 | 006737 | Region 9 | Friday harbor ferry terminal preservation | 1 of 5 | $9,385,240 | Low, 0.0% under the second |
| 31 JAN 2001 | 005987 | Region 9 | Eagle harbor marine maintenance | 4 of 4 | $548,699 | +82% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.