Quigg Bros., Inc.: WSDOT bid record
Quigg Bros., Inc. submitted 78 bids on Washington State DOT contracts in the data, from 15 MAR 2000 to 01 FEB 2023, and was the low bidder on 12 of them (15%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $39,369,129
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 2 | 0 | 0% |
| 2002 | 2 | 0 | 0% |
| 2003 | 1 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2006 | 2 | 1 | 50% |
| 2007 | 1 | 1 | 100% |
| 2008 | 4 | 1 | 25% |
| 2009 | 4 | 0 | 0% |
| 2010 | 6 | 0 | 0% |
| 2011 | 3 | 1 | 33% |
| 2012 | 6 | 1 | 17% |
| 2013 | 8 | 2 | 25% |
| 2014 | 4 | 0 | 0% |
| 2015 | 3 | 0 | 0% |
| 2016 | 10 | 1 | 10% |
| 2017 | 3 | 1 | 33% |
| 2018 | 5 | 0 | 0% |
| 2019 | 7 | 3 | 43% |
| 2020 | 1 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 40 | 8 | 20% |
| SWR region | 14 | 1 | 7% |
| Region 9 | 11 | 2 | 18% |
| NWR region | 5 | 1 | 20% |
| NCR region | 4 | 0 | 0% |
| SCR region | 3 | 0 | 0% |
| ER region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Recessed pavement marker | HUND | 23 | 9 (39%) | $12,500 | $1,500.00 | |
| Planing bituminous pavement | SY | 27 | 7 (26%) | $16.00 | $4.75 | |
| Removing guardrail | LF | 22 | 7 (32%) | $5.50 | $5.00 | |
| Paint line | LF | 44 | 6 (14%) | $1.10 | $0.25 | |
| Crushed surfacing base course | TON | 40 | 6 (15%) | $35.00 | $26.44 | |
| High visibility fence | LF | 36 | 6 (17%) | $3.00 | $3.09 | |
| Beam guardrail type 31 | LF | 24 | 6 (25%) | $30.00 | $26.32 | |
| Silt fence | LF | 23 | 6 (26%) | $5.00 | $4.50 | |
| Quarry spalls | TON | 22 | 6 (27%) | $52.50 | $39.00 | |
| Embankment compaction | CY | 13 | 6 (46%) | $2.50 | $3.50 | |
| Other traffic control labor | HR | 11 | 6 (55%) | $50.00 | $49.00 | |
| Construction signs class A | SF | 26 | 5 (19%) | $22.50 | $16.21 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rognlin'S, Inc. | 40 | 16 of 40 |
| Cascade Bridge LLC | 15 | 13 of 15 |
| Mowat Construction Company | 15 | 8 of 15 |
| Granite Construction Company | 14 | 3 of 14 |
| Ceccanti, Inc. | 14 | 3 of 14 |
| Scarsella Bros., Inc. | 12 | 10 of 12 |
| M.J. Hughes Construction, Inc. | 12 | 7 of 12 |
| Interwest Construction, Inc. | 10 | 8 of 10 |
| Selby Bridge Company, Inc. | 9 | 4 of 9 |
| American Construction Co., Inc | 9 | 7 of 9 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009930 | SWR region | I-5 koontz road bridge emergency bridge repair | 3 of 5 | $1,056,312 | +11% |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 7 of 8 | $668,554 | +115% |
| 06 APR 2022 | 009789 | OR region | Us 101 may cr in vic of dowans cr rd ground anchor load testing | 3 of 3 | $1,415,196 | +59% |
| 06 APR 2022 | 009795 | SWR region | Sr 506 1.5 miles n of frontage rd to i-5 emergency bridge repair | 6 of 8 | $1,070,562 | +29% |
| 16 MAR 2022 | 009794 | OR region | Sr112 jim creek west emergency repair | 4 of 5 | $1,525,761 | +50% |
| 18 MAR 2020 | 009529 | SWR region | I-5/ woodland vicinity horseshoe lake upgrade pump system | 4 of 8 | $1,633,033 | +20% |
| 10 APR 2019 | 009419 | SWR region | Sr 506 lacamas creek bridge replacement | 4 of 8 | $3,872,972 | +20% |
| 03 APR 2019 | 009414 | SWR region | Sr 6 salmon creek fish passage | 1 of 4 | $1,186,934 | Low, 4.0% under the second |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 1 of 7 | $15,542,998 | Low, 2.0% under the second |
| 27 MAR 2019 | 009403 | OR region | Us 101 chehalis river bridge scour repair | 1 of 3 | $1,638,803 | Low, 4.0% under the second |
| 27 MAR 2019 | 009412 | SWR region | Sr 6 south branch fronia creek and fronia creek - fish passage | 3 of 6 | $1,542,156 | +11% |
| 13 MAR 2019 | 009396 | SCR region | Us 12 white pass vicinity major drainage phase 2 | 3 of 3 | $1,019,588 | +58% |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 4 of 10 | $19,808,783 | +1.0% |
| 25 APR 2018 | 009265 | SWR region | Us 101 d st vicinity to water street paving and ada | 4 of 4 | $1,572,397 | +15% |
| 04 APR 2018 | 009238 | SWR region | Us 101 / sr 6 raymond drainage and sr 6 roundabout | 2 of 3 | $2,907,805 | +9.0% |
| 28 FEB 2018 | 009215 | OR region | Sr 112 olsen creek in vicinity of vista dr remove fish barrier | 4 of 4 | $2,299,205 | +37% |
| 22 FEB 2018 | 009211 | OR region | Us 12 unnamed tributary to wynoochee river remove fish barrier | 3 of 6 | $3,133,650 | +18% |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 4 of 10 | $5,339,523 | +7.0% |
| 26 APR 2017 | 009075 | Region 9 | Systemwide on-call off-shore maintenance | 2 of 4 | $1,136,778 | +2.0% |
| 19 APR 2017 | 009070 | OR region | Us 101 n of lower salmon cr culvert replacement | 1 of 3 | $130,119 | Low, 1.0% under the second |
| 15 FEB 2017 | 009023 | SWR region | I-5 sb cowlitz river bridge repair bridge | 7 of 7 | $485,004 | +89% |
| 13 APR 2016 | 008869 | OR region | Sr 161 south creek remove fish barrier 14c508 | 3 of 5 | $790,067 | +13% |
| 13 APR 2016 | 008874 | NCR region | Sr 112 joe creek remove fish barrier 16b004 | 4 of 4 | $1,264,993 | +19% |
| 06 APR 2016 | 008867 | OR region | Sr 507 lacamas crk trib. to muck crk remove fish barrier 15c515 | 2 of 6 | $1,109,988 | +3.0% |
| 06 APR 2016 | 008873 | SCR region | Us 12 palisades viewpoint to wildcat cr vic emergency repairs stage 2 16y003 | 4 of 4 | $2,209,046 | +44% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.