Rognlin'S, Inc.: WSDOT bid record
Rognlin'S, Inc. submitted 62 bids on Washington State DOT contracts in the data, from 15 MAR 2000 to 01 FEB 2023, and was the low bidder on 10 of them (16%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $38,528,238
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 5 | 0 | 0% |
| 2002 | 2 | 0 | 0% |
| 2003 | 2 | 0 | 0% |
| 2004 | 2 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2007 | 2 | 1 | 50% |
| 2008 | 4 | 0 | 0% |
| 2009 | 4 | 0 | 0% |
| 2010 | 2 | 0 | 0% |
| 2011 | 3 | 0 | 0% |
| 2012 | 5 | 0 | 0% |
| 2013 | 4 | 1 | 25% |
| 2014 | 1 | 0 | 0% |
| 2016 | 6 | 1 | 17% |
| 2017 | 4 | 0 | 0% |
| 2018 | 4 | 2 | 50% |
| 2019 | 4 | 1 | 25% |
| 2020 | 1 | 1 | 100% |
| 2021 | 2 | 1 | 50% |
| 2022 | 1 | 1 | 100% |
| 2023 | 2 | 1 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 42 | 8 | 19% |
| SWR region | 10 | 1 | 10% |
| NCR region | 5 | 1 | 20% |
| Region 0 | 3 | 0 | 0% |
| NWR region | 1 | 0 | 0% |
| Region 9 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| High visibility fence | LF | 27 | 7 (26%) | $4.00 | $3.09 | |
| Erosion and sediment control lead | DAY | 38 | 6 (16%) | $185.00 | $100.00 | |
| Crushed surfacing base course | TON | 33 | 6 (18%) | $39.00 | $26.44 | |
| Paint line | LF | 32 | 5 (16%) | $1.00 | $0.25 | |
| Plastic drainage marking | EACH | 23 | 5 (22%) | $100.00 | $34.00 | |
| Silt fence | LF | 23 | 5 (22%) | $5.00 | $4.50 | |
| Flexible guide post | EACH | 26 | 4 (15%) | $58.50 | $33.23 | |
| Beam guardrail type 31 | LF | 17 | 4 (24%) | $35.00 | $26.32 | |
| Temporary pavement marking | LF | 12 | 4 (33%) | $0.80 | $0.20 | |
| Concrete class 4000 for bridge | CY | 12 | 4 (33%) | $750.00 | $611.24 | |
| Temporary concrete barrier | LF | 11 | 4 (36%) | $20.00 | $14.00 | |
| Construction geotextile for separation | SY | 11 | 4 (36%) | $10.00 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Quigg Bros., Inc. | 40 | 24 of 40 |
| Scarsella Bros., Inc. | 11 | 8 of 11 |
| Granite Construction Company | 10 | 2 of 10 |
| Tri-State Construction, Inc. | 9 | 7 of 9 |
| Mowat Construction Company | 9 | 7 of 9 |
| Cascade Bridge LLC | 8 | 7 of 8 |
| Active Construction, Inc. | 8 | 1 of 8 |
| Ceccanti, Inc. | 8 | 1 of 8 |
| Stan Palmer Construction, Inc. | 7 | 5 of 7 |
| Thompson Bros. Excavating, Inc | 7 | 7 of 7 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009930 | SWR region | I-5 koontz road bridge emergency bridge repair | 5 of 5 | $1,423,460 | +49% |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 1 of 8 | $310,354 | Low, 17% under the second |
| 16 MAR 2022 | 009780 | OR region | Us 101 / hoquiam river riverside bridge - machinery room & operator house rehabilitation | 1 of 2 | $1,657,564 | Low, 8.0% under the second |
| 18 FEB 2021 | 009642 | OR region | Sr 104 hood canal bridge centerlock rehabilitation | 2 of 6 | $2,061,703 | +6.0% |
| 06 JAN 2021 | 009627 | OR region | Sr 8 and sr 507 thurston county stormwater retrofit | 1 of 5 | $228,101 | Low, 6.0% under the second |
| 08 APR 2020 | 009535 | OR region | Us 12 anderson rd safety improvement | 1 of 5 | $1,105,000 | Low, 1.0% under the second |
| 03 APR 2019 | 009414 | SWR region | Sr 6 salmon creek fish passage | 2 of 4 | $1,239,721 | +4.0% |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 6 of 7 | $22,278,412 | +43% |
| 27 MAR 2019 | 009403 | OR region | Us 101 chehalis river bridge scour repair | 2 of 3 | $1,711,761 | +4.0% |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 1 of 10 | $19,530,453 | Low, 0.0% under the second |
| 25 APR 2018 | 009265 | SWR region | Us 101 d st vicinity to water street paving and ada | 3 of 4 | $1,420,000 | +4.0% |
| 04 APR 2018 | 009238 | SWR region | Us 101 / sr 6 raymond drainage and sr 6 roundabout | 1 of 3 | $2,664,627 | Low, 9.0% under the second |
| 22 FEB 2018 | 009211 | OR region | Us 12 unnamed tributary to wynoochee river remove fish barrier | 1 of 6 | $2,651,667 | Low, 16% under the second |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 8 of 10 | $5,498,724 | +10% |
| 13 DEC 2017 | 009176 | OR region | I-5 martin way to marvin road stormwater retrofit | 2 of 3 | $195,069 | +16% |
| 19 APR 2017 | 009070 | OR region | Us 101 n of lower salmon cr culvert replacement | 3 of 3 | $154,589 | +19% |
| 15 MAR 2017 | 009041 | NCR region | Sr 112 nordstrom creek remove fish barrier | 5 of 5 | $2,472,479 | +127% |
| 15 FEB 2017 | 009020 | NCR region | Us 101 matriotti creek remove fish barrier | 7 of 8 | $2,567,940 | +79% |
| 13 APR 2016 | 008874 | NCR region | Sr 112 joe creek remove fish barrier 16b004 | 1 of 4 | $1,063,913 | Low, 6.0% under the second |
| 30 MAR 2016 | 008857 | NCR region | Us 101 swanson creek remove fish barrier 16b003 | 4 of 4 | $1,561,775 | +14% |
| 16 MAR 2016 | 008853 | OR region | Sr 121 blooms ditch remove fish barriers 14c515 | 9 of 10 | $1,737,012 | +25% |
| 09 MAR 2016 | 008849 | OR region | Sr 108 little skookum creek remove fish barrier 14c511 | 4 of 8 | $1,553,090 | +7.0% |
| 10 FEB 2016 | 008839 | NCR region | Sr 112 jansen creek remove fish barrier 16b001 | 4 of 6 | $1,917,076 | +29% |
| 13 JAN 2016 | 008827 | OR region | Sr 305 suquamish way i/s improvements 15c514 | 4 of 6 | $1,225,432 | +19% |
| 29 JAN 2014 | 008572 | SWR region | Sr 6 rock creek bridges replace bridges 6/102 & 6/103 13x308 (revised 1/8/2014) | 12 of 12 | $15,260,925 | +31% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.