Active Construction, Inc.: WSDOT bid record
Active Construction, Inc. submitted 30 bids on Washington State DOT contracts in the data, from 09 JAN 2008 to 29 MAR 2023, and was the low bidder on 5 of them (17%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $3,518,647
- Latest bid
- 29 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2008 | 1 | 0 | 0% |
| 2009 | 5 | 1 | 20% |
| 2010 | 3 | 0 | 0% |
| 2012 | 1 | 1 | 100% |
| 2013 | 2 | 2 | 100% |
| 2016 | 3 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 2 | 0 | 0% |
| 2019 | 1 | 1 | 100% |
| 2020 | 2 | 0 | 0% |
| 2021 | 4 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 18 | 3 | 17% |
| NWR region | 7 | 2 | 29% |
| NCR region | 2 | 0 | 0% |
| Region 0 | 1 | 0 | 0% |
| SCR region | 1 | 0 | 0% |
| Region 9 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Plastic drainage marking | EACH | 13 | 3 (23%) | $85.00 | $34.00 | |
| Plastic crosswalk line | SF | 10 | 3 (30%) | $5.95 | $6.00 | |
| Temporary pavement marking-short duration | LF | 10 | 3 (30%) | $1.50 | $0.40 | |
| Temporary pavement marking | LF | 7 | 3 (43%) | $0.21 | $0.20 | |
| Plastic line | LF | 7 | 3 (43%) | $3.00 | $1.51 | |
| Shoring or extra excavation class B | SF | 6 | 3 (50%) | $1.00 | $1.00 | |
| Wattle | LF | 5 | 3 (60%) | $5.00 | $4.24 | |
| Planing bituminous pavement | SY | 18 | 2 (11%) | $9.00 | $4.75 | |
| Inlet protection | EACH | 17 | 2 (12%) | $100.00 | $95.00 | |
| Erosion and sediment control lead | DAY | 13 | 2 (15%) | $600.00 | $100.00 | |
| Hot mix asphalt class 1/2 inch PG 64-22 | TON | 12 | 2 (17%) | $112.50 | $80.00 | |
| Plastic stop line | LF | 11 | 2 (18%) | $11.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 14 | 9 of 14 |
| Ceccanti, Inc. | 11 | 6 of 11 |
| Tucci & Sons, Inc. | 10 | 5 of 10 |
| Granite Construction Company | 9 | 3 of 9 |
| Stan Palmer Construction, Inc. | 8 | 2 of 8 |
| Rognlin'S, Inc. | 8 | 7 of 8 |
| Quigg Bros., Inc. | 8 | 4 of 8 |
| Tri-State Construction, Inc. | 6 | 4 of 6 |
| Rodarte Construction, Inc. | 6 | 2 of 6 |
| Midmountain Contractors, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAR 2023 | 009941 | OR region | Sr 166 bay st./bethel ave./maple ave. intersection - roundabout | 4 of 6 | $1,542,542 | +6.0% |
| 01 FEB 2023 | 009928 | OR region | Sr 7 unnamed tribs to s creek remove fish barriers & paving | 2 of 4 | $5,575,575 | +5.0% |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 4 of 8 | $493,000 | +59% |
| 09 MAR 2022 | 009774 | OR region | Sr 305 murden creek remove fish barrier | 2 of 2 | $8,579,579 | +12% |
| 07 APR 2021 | 009666 | NWR region | Sr 9 unnamed tributary to pilchuck creek fish passage | 2 of 6 | $1,489,489 | +4.0% |
| 03 MAR 2021 | 009654 | NWR region | I-90 coal mine wall vic to soderman cr vic stormwater retrofit | 5 of 5 | $521,521 | +43% |
| 06 JAN 2021 | 009617 | Region 9 | Sr305 eagle harbor maintenance facility physical security infrastructure | 3 of 4 | $325,325 | +27% |
| 06 JAN 2021 | 009627 | OR region | Sr 8 and sr 507 thurston county stormwater retrofit | 5 of 5 | $395,395 | +73% |
| 08 APR 2020 | 009535 | OR region | Us 12 anderson rd safety improvement | 4 of 5 | $1,180,180 | +7.0% |
| 05 FEB 2020 | 009501 | NWR region | Sr 522 i-5 to 61st ave ne paving & ada compliance | 5 of 5 | $13,636,636 | +22% |
| 20 MAR 2019 | 009401 | NWR region | Sr 520 80th ave to 108th ave culvert repairs | 1 of 3 | $1,177,177 | Low, 49% under the second |
| 22 FEB 2018 | 009211 | OR region | Us 12 unnamed tributary to wynoochee river remove fish barrier | 6 of 6 | $4,399,399 | +66% |
| 14 FEB 2018 | 009182 | NWR region | Sr 164 sr 18 to 17th st se paving and ada compliance | 3 of 5 | $2,868,868 | +21% |
| 15 MAR 2017 | 009040 | NCR region | I-90 n fork issaquah creek fish passage | 2 of 5 | $5,874,874 | +13% |
| 08 FEB 2017 | 009019 | NCR region | Sr 900 green creek remove fish barrier | 2 of 7 | $946,946 | +6.0% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 8 of 9 | $9,959,978 | +26% |
| 06 APR 2016 | 008867 | OR region | Sr 507 lacamas crk trib. to muck crk remove fish barrier 15c515 | 3 of 6 | $1,172,172 | +9.0% |
| 09 MAR 2016 | 008849 | OR region | Sr 108 little skookum creek remove fish barrier 14c511 | 5 of 8 | $1,742,742 | +20% |
| 03 APR 2013 | 008444 | OR region | Sr 7 muck cr trib to nisqually river fish barrier removal | 1 of 7 | $1,125,102 | Low, 3.0% under the second |
| 24 JAN 2013 | 008403 | NWR region | I-405 nb sr 167 ramp to nb i-405 major drainage repair | 1 of 9 | $489,405 | Low, 1.0% under the second |
| 15 FEB 2012 | 008245 | OR region | Sr 167 vic i-5 to puyallup river bridge sidewalk ramps | 1 of 4 | $546,990 | Low, 6.0% under the second |
| 24 FEB 2010 | 007879 | OR region | Sr 510 yelm loop stage 1 | 4 of 15 | $4,618,343 | +11% |
| 03 FEB 2010 | 007866 | OR region | Sr 410 214th ave. e. to 234th ave. e. widening | 3 of 12 | $6,973,836 | +3.0% |
| 06 JAN 2010 | 007867 | OR region | Sr 520 - pontoon anderson and middleton site restoration | 9 of 13 | $340,635 | +19% |
| 25 MAR 2009 | 007692 | SCR region | I-90 snoqualmie pass east - phase 1a hyak to crystal springs - detour | 11 of 18 | $3,868,952 | +17% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.