Scarsella Bros., Inc.: WSDOT bid record
Scarsella Bros., Inc. submitted 115 bids on Washington State DOT contracts in the data, from 20 DEC 2000 to 23 SEP 2026, and was the low bidder on 30 of them (26%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $215,381,993
- Latest bid
- 23 SEP 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 5 | 2 | 40% |
| 2002 | 3 | 1 | 33% |
| 2003 | 9 | 3 | 33% |
| 2004 | 4 | 1 | 25% |
| 2005 | 3 | 0 | 0% |
| 2006 | 2 | 0 | 0% |
| 2007 | 8 | 2 | 25% |
| 2008 | 10 | 2 | 20% |
| 2009 | 7 | 1 | 14% |
| 2010 | 11 | 2 | 18% |
| 2011 | 8 | 1 | 13% |
| 2012 | 4 | 1 | 25% |
| 2013 | 4 | 0 | 0% |
| 2014 | 2 | 1 | 50% |
| 2015 | 5 | 1 | 20% |
| 2016 | 6 | 2 | 33% |
| 2017 | 4 | 2 | 50% |
| 2018 | 4 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 1 | 0 | 0% |
| 2021 | 6 | 4 | 67% |
| 2022 | 2 | 2 | 100% |
| 2023 | 2 | 0 | 0% |
| 2026 | 3 | 2 | 67% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 41 | 11 | 27% |
| OR region | 26 | 11 | 42% |
| SCR region | 18 | 3 | 17% |
| NCR region | 13 | 3 | 23% |
| SWR region | 10 | 2 | 20% |
| ER region | 5 | 0 | 0% |
| Region 0 | 1 | 0 | 0% |
| Region 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 71 | 38 (54%) | $0.25 | $0.25 | |
| Shoring or extra excavation class B | SF | 57 | 29 (51%) | $0.50 | $1.00 | |
| Plastic drainage marking | EACH | 52 | 28 (54%) | $30.00 | $34.00 | |
| Removing guardrail | LF | 53 | 25 (47%) | $4.15 | $5.00 | |
| Flexible guide post | EACH | 70 | 22 (31%) | $30.00 | $33.23 | |
| Temporary pavement marking | LF | 43 | 22 (51%) | $0.20 | $0.20 | |
| Plastic stop line | LF | 39 | 22 (56%) | $9.00 | $10.00 | |
| Removing guardrail anchor | EACH | 48 | 21 (44%) | $200.00 | $215.00 | |
| Plastic traffic arrow | EACH | 44 | 21 (48%) | $125.00 | $135.00 | |
| Raised pavement marker type 2 | HUND | 41 | 20 (49%) | $400.00 | $478.00 | |
| Beam guardrail type 31 | LF | 41 | 20 (49%) | $23.50 | $26.32 | |
| Beam guardrail type 31 non-flared terminal | EACH | 42 | 18 (43%) | $2,512.50 | $2,700.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tri-State Construction, Inc. | 31 | 12 of 31 |
| KLB Construction, Inc. | 24 | 9 of 24 |
| Granite Construction Company | 22 | 3 of 22 |
| Ceccanti, Inc. | 22 | 3 of 22 |
| Wilder Construction Company | 21 | 9 of 21 |
| Midmountain Contractors, Inc. | 18 | 5 of 18 |
| Interwest Construction, Inc. | 18 | 8 of 18 |
| Strider Construction Co., Inc. | 17 | 7 of 17 |
| Northwest Construction, Inc. | 15 | 6 of 15 |
| Goodfellow Bros., Inc. | 14 | 7 of 14 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 1 of 8 | $1,242,940 | Low, 4.0% under the second |
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 5 of 7 | $448,625 | +36% |
| 12 AUG 2026 | XE3760 | SCR region | I-90 Eb 3 Miles E Of North Bend - Emergency Seeding And Erosion Control | 1 of 5 | $233,938 | Low, 8.0% under the second |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 2 of 8 | $362,454 | +17% |
| 19 JAN 2023 | 009891 | OR region | Us 101 elwha river bridge bridge replacement | 3 of 7 | $30,340,512 | +10% |
| 27 APR 2022 | 009802 | NCR region | Us 2 east of leavenworth slope stabilization | 1 of 2 | $259,651 | Low, 16% under the second |
| 16 MAR 2022 | 009794 | OR region | Sr112 jim creek west emergency repair | 1 of 5 | $1,014,584 | Low, 8.0% under the second |
| 21 APR 2021 | 009662 | NWR region | Sr 99 alaskan way viaduct - replacement south access surface streets | 1 of 4 | $24,957,392 | Low, 0.0% under the second |
| 21 APR 2021 | 009681 | OR region | Sr 112 w of jim creek landslides emergency repairs | 1 of 4 | $975,440 | Low, 0.0% under the second |
| 03 MAR 2021 | 009654 | NWR region | I-90 coal mine wall vic to soderman cr vic stormwater retrofit | 1 of 5 | $363,808 | Low, 6.0% under the second |
| 18 FEB 2021 | 009651 | NWR region | Sr 18 weyerhaeuser way vic to sr164 vic barrier replacement | 2 of 3 | $2,595,305 | +5.0% |
| 03 FEB 2021 | 009625 | SCR region | Us 395 ridgeline drive construct interchange | 1 of 8 | $12,331,611 | Low, 4.0% under the second |
| 06 JAN 2021 | 009627 | OR region | Sr 8 and sr 507 thurston county stormwater retrofit | 4 of 5 | $333,608 | +46% |
| 20 FEB 2020 | 009516 | OR region | Us 101 bagley and siebert creeks remove fish barriers | 2 of 8 | $22,329,329 | +2.0% |
| 27 MAR 2019 | 009398 | OR region | Us 101 west jefferson county remove fish barriers | 3 of 7 | $16,219,951 | +4.0% |
| 11 APR 2018 | 009251 | NWR region | Sr 524 great dane creek fish passage | 2 of 5 | $745,151 | +14% |
| 22 FEB 2018 | 009211 | OR region | Us 12 unnamed tributary to wynoochee river remove fish barrier | 2 of 6 | $3,087,892 | +16% |
| 22 FEB 2018 | 009210 | ER region | Sr 25 spokane river bridge n embankment repair | 2 of 3 | $1,914,500 | +34% |
| 18 JAN 2018 | 009192 | NWR region | Sr 203 langlois creek fish passage | 2 of 4 | $933,833 | +2.0% |
| 13 DEC 2017 | 009176 | OR region | I-5 martin way to marvin road stormwater retrofit | 1 of 3 | $167,989 | Low, 16% under the second |
| 15 MAR 2017 | 009040 | NCR region | I-90 n fork issaquah creek fish passage | 1 of 5 | $5,186,640 | Low, 13% under the second |
| 08 FEB 2017 | 009019 | NCR region | Sr 900 green creek remove fish barrier | 5 of 7 | $1,133,433 | +27% |
| 01 FEB 2017 | 009010 | NCR region | Sr 150 no-see-um road intersection improvements | 6 of 6 | $6,504,041 | +23% |
| 21 DEC 2016 | 008993 | OR region | I-5 mounts rd to center dr auxiliary lane extension | 1 of 9 | $7,878,788 | Low, 0.0% under the second |
| 06 APR 2016 | 008873 | SCR region | Us 12 palisades viewpoint to wildcat cr vic emergency repairs stage 2 16y003 | 2 of 4 | $1,616,196 | +5.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.