KLB Construction, Inc.: WSDOT bid record
KLB Construction, Inc. submitted 42 bids on Washington State DOT contracts in the data, from 16 FEB 2000 to 23 SEP 2026, and was the low bidder on 9 of them (21%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $52,089,554
- Latest bid
- 23 SEP 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 1 | 100% |
| 2001 | 2 | 0 | 0% |
| 2003 | 4 | 0 | 0% |
| 2004 | 1 | 1 | 100% |
| 2005 | 1 | 1 | 100% |
| 2007 | 6 | 1 | 17% |
| 2008 | 5 | 0 | 0% |
| 2009 | 4 | 1 | 25% |
| 2010 | 2 | 1 | 50% |
| 2011 | 7 | 1 | 14% |
| 2012 | 1 | 0 | 0% |
| 2014 | 2 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2018 | 2 | 2 | 100% |
| 2021 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 28 | 5 | 18% |
| SCR region | 8 | 3 | 38% |
| OR region | 3 | 0 | 0% |
| ER region | 1 | 1 | 100% |
| Region 8 | 1 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Crushed surfacing base course | TON | 35 | 11 (31%) | $17.50 | $26.44 | |
| Quarry spalls | TON | 25 | 8 (32%) | $24.00 | $39.00 | |
| Street cleaning | HR | 24 | 7 (29%) | $100.00 | $115.00 | |
| Other traffic control labor | HR | 18 | 7 (39%) | $39.00 | $49.00 | |
| Cement concrete sidewalk | SY | 13 | 7 (54%) | $31.95 | $55.00 | |
| Catch basin type 1 | EACH | 16 | 6 (38%) | $862.50 | $1,100.00 | |
| Shoring or extra excavation class B | SF | 23 | 5 (22%) | $0.50 | $1.00 | |
| Temporary pavement marking | LF | 19 | 5 (26%) | $0.40 | $0.20 | |
| Testing storm sewer pipe | LF | 15 | 5 (33%) | $1.75 | $2.24 | |
| Operation of truck mounted impact attenuator | HR | 6 | 5 (83%) | $30.00 | $43.00 | |
| Roadway excavation including haul | CY | 28 | 4 (14%) | $13.80 | $20.00 | |
| High visibility fence | LF | 22 | 4 (18%) | $3.17 | $3.09 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 24 | 15 of 24 |
| Tri-State Construction, Inc. | 21 | 12 of 21 |
| Midmountain Contractors, Inc. | 11 | 5 of 11 |
| Wilder Construction Company | 11 | 4 of 11 |
| Strider Construction Co., Inc. | 11 | 5 of 11 |
| Northwest Construction, Inc. | 9 | 3 of 9 |
| Interwest Construction, Inc. | 9 | 3 of 9 |
| Rodarte Construction, Inc. | 8 | 3 of 8 |
| Marshbank Construction, Inc. | 8 | 4 of 8 |
| A-1 Landscaping and Constructi | 8 | 0 of 8 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | XE3772 | SCR region | Sr 906 Hyak Vicinity Emergency Washout Restoration | 2 of 8 | $1,288,805 | +4.0% |
| 03 FEB 2021 | 009625 | SCR region | Us 395 ridgeline drive construct interchange | 5 of 8 | $13,430,944 | +9.0% |
| 11 APR 2018 | 009251 | NWR region | Sr 524 great dane creek fish passage | 1 of 5 | $653,459 | Low, 14% under the second |
| 11 APR 2018 | 009245 | NWR region | I-405 sr 167 interchange catch basins - drainage repair | 1 of 5 | $1,073,999 | Low, 12% under the second |
| 11 JAN 2017 | 009002 | NWR region | Sr 532 church creek fish passage | 6 of 11 | $4,398,717 | +20% |
| 23 MAR 2016 | 008861 | OR region | Sr 16 anderson creek trib to sinclair inlet - fish barrier removal 15c522 | 6 of 7 | $5,646,649 | +29% |
| 30 APR 2014 | 008617 | NWR region | Sr 530 slide - roadway clearing 14a016 (rev. 4/29/14) | 7 of 9 | $5,993,458 | +21% |
| 24 APR 2014 | 008615 | NWR region | Sr 530 slide - access road maintenance and traffic control 14a017 (rev. 4/23/14) | 3 of 3 | $3,434,938 | +2.0% |
| 11 APR 2012 | 008269 | NWR region | Sr 530 fortson creek culvert - fish barrier | 3 of 8 | $886,943 | +9.0% |
| 23 MAR 2011 | 008101 | NWR region | Sr 519 i-90 to sr 519 pedestrian trail | 4 of 6 | $1,160,262 | +5.0% |
| 09 MAR 2011 | 008089 | NWR region | Sr 548 terrell creek-fish passage | 1 of 14 | $672,412 | Low, 6.0% under the second |
| 02 FEB 2011 | 008053 | NWR region | I-405 ne 116th street interchange and street improvement project | 2 of 10 | $11,076,974 | +4.0% |
| 02 FEB 2011 | 008077 | NWR region | Sr 11 chuckanut park and ride | 9 of 11 | $3,880,744 | +21% |
| 02 FEB 2011 | 008033 | SCR region | Us 12 sr 124 intersection - build interchange | 6 of 15 | $13,019,348 | +13% |
| 12 JAN 2011 | 008065 | NWR region | Sr 530 sauk river bank erosion realign roadway | 3 of 13 | $2,568,380 | +4.0% |
| 12 JAN 2011 | 008060 | NWR region | Sr 530 skaglund hill slide permanent repair | 5 of 14 | $3,528,914 | +9.0% |
| 09 DEC 2010 | 008045 | NCR region | Sr 28/us 2/97 intersection improvements | 2 of 4 | $3,836,158 | 0.0% |
| 13 JAN 2010 | 007858 | SCR region | I-82 valley mall blvd. interchange rebuild interchange | 1 of 12 | $18,380,257 | Low |
| 25 MAR 2009 | 007692 | SCR region | I-90 snoqualmie pass east - phase 1a hyak to crystal springs - detour | 1 of 18 | $3,298,002 | Low, 2.0% under the second |
| 25 FEB 2009 | 007679 | OR region | Sr 160 sr 16 to long lake road vic. | 4 of 15 | $3,446,864 | +9.0% |
| 19 FEB 2009 | 007649 | Region 8 | I-5 mountlake terrace freeway station | 7 of 9 | $19,827,280 | +12% |
| 07 JAN 2009 | 007631 | NWR region | I-5 172nd st ne (sr 531) interchange modification | 10 of 12 | $15,642,272 | +21% |
| 10 DEC 2008 | 007639 | NWR region | Sr 9 martin rd vic to thunder creek realignment and widening | 5 of 19 | $1,854,278 | +10% |
| 04 MAR 2008 | 007510 | NWR region | I-405 thunder hills creek emergency culvert replacement | 3 of 3 | $4,802,214 | +68% |
| 21 FEB 2008 | 007479 | NWR region | Sr 9 176th street se vic to marsh road i/s | 2 of 6 | $19,459,207 | +3.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.