Marshbank Construction, Inc.: WSDOT bid record
Marshbank Construction, Inc. submitted 34 bids on Washington State DOT contracts in the data, from 04 JAN 2001 to 01 FEB 2023, and was the low bidder on 7 of them (21%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $14,566,884
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2001 | 2 | 1 | 50% |
| 2002 | 1 | 0 | 0% |
| 2003 | 1 | 0 | 0% |
| 2004 | 4 | 0 | 0% |
| 2005 | 2 | 0 | 0% |
| 2006 | 2 | 0 | 0% |
| 2007 | 6 | 0 | 0% |
| 2008 | 2 | 1 | 50% |
| 2010 | 2 | 0 | 0% |
| 2011 | 1 | 0 | 0% |
| 2012 | 3 | 1 | 33% |
| 2013 | 2 | 0 | 0% |
| 2016 | 1 | 1 | 100% |
| 2017 | 1 | 1 | 100% |
| 2019 | 1 | 1 | 100% |
| 2021 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 32 | 6 | 19% |
| NCR region | 1 | 1 | 100% |
| OR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs class A | SF | 24 | 10 (42%) | $12.00 | $16.21 | |
| Testing storm sewer pipe | LF | 17 | 6 (35%) | $2.00 | $2.24 | |
| Embankment compaction | CY | 22 | 5 (23%) | $4.00 | $3.50 | |
| Plastic line | LF | 18 | 5 (28%) | $1.40 | $1.51 | |
| Catch basin type 2 48 inch diameter | EACH | 15 | 5 (33%) | $2,100.00 | $2,500.00 | |
| Temporary impact attenuator | EACH | 13 | 5 (38%) | $5,000.00 | $4,000.00 | |
| Operation of truck-mounted impact attenuator | HR | 8 | 5 (63%) | $31.50 | $50.00 | |
| Plastic drainage marking | EACH | 25 | 4 (16%) | $32.00 | $34.00 | |
| Flexible guide post | EACH | 22 | 4 (18%) | $31.50 | $33.23 | |
| Structure excavation class B including haul | CY | 22 | 4 (18%) | $18.50 | $15.00 | |
| Shoring or extra excavation class B | SF | 21 | 4 (19%) | $1.00 | $1.00 | |
| Inlet protection | EACH | 18 | 4 (22%) | $60.50 | $95.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wilder Construction Company | 16 | 9 of 16 |
| Tri-State Construction, Inc. | 11 | 8 of 11 |
| Strider Construction Co., Inc. | 11 | 6 of 11 |
| Scarsella Bros., Inc. | 9 | 5 of 9 |
| Colacurcio Brothers, Inc. | 9 | 6 of 9 |
| Interwest Construction, Inc. | 9 | 7 of 9 |
| Pacific Road & Bridge Co. | 8 | 6 of 8 |
| KLB Construction, Inc. | 8 | 4 of 8 |
| Trimaxx Construction, Inc. | 8 | 4 of 8 |
| A-1 Landscaping and Constructi | 8 | 0 of 8 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009924 | NWR region | Sr 20 unnamed tributary to red creek fish passage | 7 of 7 | $3,568,482 | +18% |
| 15 DEC 2021 | 009742 | NWR region | Sr 9 bickford ave intersection improvement | 2 of 4 | $3,412,752 | +7.0% |
| 24 MAR 2021 | 009656 | NWR region | Sr 9 sr 204 intersection improvements (stage 2) | 1 of 4 | $7,424,727 | Low, 4.0% under the second |
| 13 MAR 2019 | 009374 | NWR region | Sr 9 sr 204 intersection improvements (stage 1) | 1 of 7 | $1,201,060 | Low, 7.0% under the second |
| 08 FEB 2017 | 009019 | NCR region | Sr 900 green creek remove fish barrier | 1 of 7 | $893,662 | Low, 6.0% under the second |
| 27 APR 2016 | 008897 | NWR region | Sr 92 pilchuck river - ced 16a006 revised 4-5-2016 | 1 of 5 | $1,594,934 | Low, 14% under the second |
| 24 JAN 2013 | 008403 | NWR region | I-405 nb sr 167 ramp to nb i-405 major drainage repair | 7 of 9 | $568,761 | +16% |
| 09 JAN 2013 | 008397 | NWR region | Sr 9 np creek fish passage | 7 of 12 | $387,411 | +10% |
| 12 DEC 2012 | 008381 | NWR region | Sr 99 lincoln way vic to airport rd vic sb sidewalk & traffic signal | 4 of 8 | $1,398,850 | +9.0% |
| 11 APR 2012 | 008269 | NWR region | Sr 530 fortson creek culvert - fish barrier | 6 of 8 | $1,050,999 | +29% |
| 05 JAN 2012 | 008233 | NWR region | I-405 & sr 522 ne 85th st i/c & sr 522 / sr 523 i/s pedestrian access | 1 of 5 | $195,359 | Low, 16% under the second |
| 12 JAN 2011 | 008060 | NWR region | Sr 530 skaglund hill slide permanent repair | 12 of 14 | $3,874,503 | +20% |
| 27 JAN 2010 | 007859 | NWR region | Sr 11 i-5 interchange - josh wilson rd rebuild interchange | 11 of 13 | $5,592,138 | +17% |
| 27 JAN 2010 | 007874 | NWR region | I-5 blaine exit interchange improvements | 7 of 7 | $3,290,664 | +19% |
| 10 DEC 2008 | 007639 | NWR region | Sr 9 martin rd vic to thunder creek realignment and widening | 1 of 19 | $1,687,701 | Low, 7.0% under the second |
| 03 DEC 2008 | 007634 | NWR region | Sr 509 vic s 112th st pedestrian improvements | 9 of 12 | $134,758 | +28% |
| 28 MAR 2007 | 007298 | NWR region | Sr 9 108th street ne (lauck road) channelization | 6 of 7 | $1,173,410 | +33% |
| 14 MAR 2007 | 007290 | NWR region | Sr522 ne 195th st signal & channelization | 2 of 4 | $1,177,410 | 0.0% |
| 14 FEB 2007 | 007264 | NWR region | I-90 eb ramps to sr 202 roundabout | 2 of 7 | $1,168,187 | 0.0% |
| 07 FEB 2007 | 007242 | NWR region | Sr 20 fredonia to i-5 - widening stage 1 | 2 of 8 | $15,496,631 | +2.0% |
| 31 JAN 2007 | 007256 | NWR region | Sr 202 jct sr 203 roundabout | 7 of 7 | $1,699,399 | +22% |
| 24 JAN 2007 | 007231 | NWR region | Sr 169 se 291st street vicinity safety and channelization | 4 of 10 | $1,548,260 | +30% |
| 20 DEC 2006 | 007232 | NWR region | Sr 20 sidney st vic to scenic heights safety and paving | 3 of 5 | $4,595,689 | +12% |
| 01 FEB 2006 | 007079 | NWR region | Sr 20 troxell rd to cornet bay rd widening, channelization & safety | 5 of 9 | $3,954,437 | +5.0% |
| 30 MAR 2005 | 006939 | NWR region | Sr 9 lake stevens weigh station | 5 of 11 | $743,318 | +18% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.